GE manual Entelli-Switch 250 User Setup CFG Menu

Page 17

Entelli-Switch 250 User Setup - CFG Menu

S1 OK

01: 50

FRI 31 MAY 2003

MORE TEST

Turn options ON or OFF via keypad through the CFG menu

1 VAB = ___

2 VAB = ___

VBC = ___

VBC = ___

VCA = ___

VCA = ___

MORE CFG

SET ESC

Enter six digit access code

(The factory assigned six-digit access code is located on the back of the controller)

WARNING

 

 

1 Controller inputs must be relay isolated.

 

 

 

 

{

4

12

8

 

CONFIG

Network Communications

Customer

14

11

7

3

Input

(Option)

13

109

65

21

USER SETUP

J2*

Voltage

 

 

 

 

 

 

 

 

 

 

 

 

MOREBACK

—TIMER EXERCISER (CDT) 1, 7, 14, 28 Day (pg. 11 & 15)

—CLOCK EXERCISER LOAD OR NO LOAD (CDP)

1, 7, 14, 28, 365 Day (pg. 11 & 16)

—TEST KEY (6) Maintained/Momentary (pg. 11)

—TRANSFER COMMIT (S13) ON/OFF (pg. 13)

—AUTO / MANUAL (S5 or S12) ON/OFF (pg. 13)

—IN-PHASE MONITOR (R50) ON/OFF (pg. 13)

—S1 OVER VOLTAGE (R1-1 or R1-3) ON/OFF (pg. 12)

1PROG 1

2PROG 2

3GRD (Input Sink)

4LS OUT

5NIA OUT

6ELEV. PRE. OUT

7ALARM OUT

8STE OUT

9

10MOTOR DISC. OUT

12TMS IN

13INHIB. > S1

14INHIB. > S2

15LS IN

16

*Input and output availability subject to factory configuration.

J4*

1

2

3+12V (Output Source)

4LN OUT

5L4 OUT

6L3 OUT

7L2 OUT

8L1 OUT

9YN IN

10YE IN

11TSNL IN

12Q2/TSL IN

13S12 IN

14S5 IN

J2-3

N.O.

N.C.

 

To J2/J4 Input

2Controller ouputs have limited source capability. Use only GE Zenith - specified output modules.

 

{

11

5

 

 

 

Output Contacts

12

6

 

1

From J2/J4

7

 

 

13

R1

2

Output

 

 

 

{

14

8

 

 

 

 

9

 

 

 

Output Contacts

15

 

3

 

10

 

 

 

16

R2

4

J4-3

 

 

 

 

 

11

 

 

5

 

R1

 

12

 

R1

6

 

Output

 

 

Output

 

 

137

148

R2

15

R2

9

Output

 

Output

 

 

16

 

10

Contact Rating: 10A @ 277VAC or 30VDC

Lithium Battery

Exerciser Battery

 

Replacement - K-4100 (BR2032)

 

Service Life - 10 Years+

 

+ During normal operation

User Access Code

Default - 121212

Product Information

www.geindustrial.com

24-Hour Service

(773) 299-6600

—S1 UNDER FREQUENCY ON/OFF (pg. 9)

—S2 OVER VOLTAGE

ON/OFF (pg. 9)

—S2 OVER FREQUENCY ON/OFF (pg. 9)

—PHASE IMBALANCE (VI) ON/OFF (pg. 14)

—PHASE ROTATION MATCH (R16) ON/OFF (pg.12)

—LOAD DISCONNECT TD (UMD) (pg.13)

—TRANSFER ALARM (CTAP) ON/OFF (pg.11)

—NETWORK (ZNET) ON/OFF (pg. 14)

Entelli-Switch 250TM

Figure 10

Optional Accessories

GE Zenith Controls

Entelli-Switch 250 Operation and Maintenance Manual (71R-2000)

17

Image 17
Contents GE Zenith Controls Introduction Authorized ServiceTable of Contents Final Equipment Inspection Safety / InstallationEquipment Inspection and Storage Initial Energization Installation cont’dEngine Start Control Connections R E T E S T Initial Energization cont’dInstallation cont’d Entelli-Switch 250 Controller Entelli-Switch 250 ControllerLCD & Keypad Entelli-Switch 250 Controller cont’dUser Setting for Voltage & Frequency Stds Exes Cons Sens Spes Psgs Accessory Group PackagesCalibrate Accessory DefinitionsA62 Accessory Definitions cont’d S12P Approximate out of phase degreesS13P S14Press More and scroll to SET System Clock using the More key How to Set the System ClockPress Exer Cancl Press Start Timer Test CDT One Event Timer ExerciserPress Bypass Exer Press Cancl BpassLoad / No-Load Clock Exerciser CDP Clock ExerciserTurn options on or OFF via keypad through the CFG menu Entelli-Switch 250 User Setup CFG MenuChange adjustable values through the SET menu Entelli-Switch 250 User Setup SET MenuView System Data Entelli-Switch 250 User Setup System InfoIntroduction TestingTest Options Auto PositionATS Testing Testing cont’dDelayed Transition Standard TransitionRe-Transfer with Closed Transition Closed TransitionInitiating a Closed Transition Test Location Emergency Service Procedure for Extended Parallel TimeAuto Location ATS Type Sequence of OperationSequence of Operation cont’d Relay/Transformer R/T Box Amp Molded Power Section Transformer Usage see FigureRelay/Transformer R/T Box cont’d Delayed / Closed TransitionDelayed / Closed Transition R/T Box Schematic Standard Transition R/T Box SchematicGeneral Troubleshooting Troubleshooting and DiagnosticsInspection and Cleaning Maintenance and TestingTesting ServicingPage GE Zenith Controls