Relay/Transformer (R/T Box) (cont’d)

Delayed / Closed Transition

PRI.

SEC.

1

2

3

Figure 14

Transformer Usage

R/T Box

Primary

1 VA

25 VA

Assembly

Voltage

XFMR

XFMR

Part No.

at 50/60 Hz

Part No.

Part No.

 

 

 

 

50P-1034

120V

K-3216

K-3224

50P-1035

208-220V

K-3217

K-3225

50P-1036

230-240V

K-3218

K-3226

50P-1037

277V

K-3219

K-3227

50P-1038

380-400V

K-3220

K-3228

50P-1039

416-440V

K-3221

K-3229

50P-1040

460-480V

K-3222

K-3230

50P-1041

575-600V

K-3223

K-3231

 

 

 

 

Item

1

2

3

Bill of Material

Part No.

Description

See Chart

Transformer (25 VA)

See Chart

Transformer (1 VA)

K-1260

Coil Control Relay (24V)

 

 

Qty

2

2

4

GE Zenith Controls

Entelli-Switch 250 Operation and Maintenance Manual (71R-2000)

27

Image 27
Contents GE Zenith Controls Authorized Service Table of ContentsIntroduction Safety / Installation Equipment Inspection and StorageFinal Equipment Inspection Installation cont’d Engine Start Control ConnectionsInitial Energization R E T E S T Initial Energization cont’dInstallation cont’d Entelli-Switch 250 Controller Entelli-Switch 250 ControllerLCD & Keypad Entelli-Switch 250 Controller cont’dUser Setting for Voltage & Frequency Stds Exes Cons Sens Spes Psgs Accessory Group PackagesAccessory Definitions A62Calibrate Accessory Definitions cont’d S14 Approximate out of phase degreesS12P S13PPress More and scroll to SET System Clock using the More key How to Set the System ClockPress Cancl Bpass CDT One Event Timer ExerciserPress Exer Cancl Press Start Timer Test Press Bypass ExerLoad / No-Load Clock Exerciser CDP Clock ExerciserTurn options on or OFF via keypad through the CFG menu Entelli-Switch 250 User Setup CFG MenuChange adjustable values through the SET menu Entelli-Switch 250 User Setup SET MenuView System Data Entelli-Switch 250 User Setup System InfoAuto Position TestingIntroduction Test OptionsStandard Transition Testing cont’dATS Testing Delayed TransitionClosed Transition Initiating a Closed TransitionRe-Transfer with Closed Transition Emergency Service Procedure for Extended Parallel Time Auto LocationTest Location ATS Type Sequence of OperationSequence of Operation cont’d Relay/Transformer R/T Box Amp Molded Power Section Transformer Usage see FigureRelay/Transformer R/T Box cont’d Delayed / Closed TransitionDelayed / Closed Transition R/T Box Schematic Standard Transition R/T Box SchematicGeneral Troubleshooting Troubleshooting and DiagnosticsServicing Maintenance and TestingInspection and Cleaning TestingPage GE Zenith Controls