GE Entelli-Switch 250 manual Installation cont’d

Page 6

Installation (cont’d)

DANGER

HAZARDOUS VOLTAGE

(Can Cause Severe Injury or Death)

Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.

Control Connections

Figure 5

Engine Start

Connections

Input/Output Connectors to I/O Modules

To Power

Panel

Clock Program

Backup Battery

Remove protective strip to enable clock functions

Network Connector

To R/T Box

A complete information package is furnished with each transfer switch including a complete connection diagram and schematic which details all necessary control circuit field connections.

The engine start control wires connect to the engine start relay terminals located to the left

of the microprocessor. Figure 5 shows the location of these terminals.

The terminals are clearly identified by a label on the microcontroller backplate. In the case of manual trans- fer switches, or in other applications not requiring the microprocessor, clearly marked terminal blocks are provided in the upper left corner of the control panel for the engine start control wires.

6

Entelli-Switch 250 Operation and Maintenance Manual (71R-2000)

GE Zenith Controls

Image 6
Contents GE Zenith Controls Authorized Service Table of ContentsIntroduction Safety / Installation Equipment Inspection and StorageFinal Equipment Inspection Installation cont’d Engine Start Control ConnectionsInitial Energization Initial Energization cont’d R E T E S TInstallation cont’d Entelli-Switch 250 Controller Entelli-Switch 250 ControllerEntelli-Switch 250 Controller cont’d LCD & KeypadUser Setting for Voltage & Frequency Accessory Group Packages Stds Exes Cons Sens Spes PsgsAccessory Definitions A62Calibrate Accessory Definitions cont’d S13P Approximate out of phase degreesS12P S14How to Set the System Clock Press More and scroll to SET System Clock using the More keyPress Bypass Exer CDT One Event Timer ExerciserPress Exer Cancl Press Start Timer Test Press Cancl BpassCDP Clock Exerciser Load / No-Load Clock ExerciserEntelli-Switch 250 User Setup CFG Menu Turn options on or OFF via keypad through the CFG menuEntelli-Switch 250 User Setup SET Menu Change adjustable values through the SET menuEntelli-Switch 250 User Setup System Info View System DataTest Options TestingIntroduction Auto PositionDelayed Transition Testing cont’dATS Testing Standard TransitionClosed Transition Initiating a Closed TransitionRe-Transfer with Closed Transition Emergency Service Procedure for Extended Parallel Time Auto LocationTest Location Sequence of Operation ATS TypeSequence of Operation cont’d Amp Molded Power Section Transformer Usage see Figure Relay/Transformer R/T BoxDelayed / Closed Transition Relay/Transformer R/T Box cont’dStandard Transition R/T Box Schematic Delayed / Closed Transition R/T Box SchematicTroubleshooting and Diagnostics General TroubleshootingTesting Maintenance and TestingInspection and Cleaning ServicingPage GE Zenith Controls