After all options and accessories are checked and verified, follow these steps to set up the ATS. Refer to Entelli-Switch 250 display Figure 4. The annunciation LEDs illuminate to indicate (1) source availability,

(2)ATS position, and (3) Entelli-Switch 250 control function (timing).

S 1 O K

2 1 : 5 6

M O N 2 3 A P R 2 0 0 2

M O R E T E S T

Figure 4 – LCD and keypad

1.Unlock the enclosure.

2.Open the enclosure.

3.Place the Disconnect Switch in the Inhibit.

NOTE: This step is only performed if the “DS” Option was purchased.

4.Close the external (up-stream) Source 1 circuit breaker.

NOTES: Source 1 Available and Source 1 Position LED’s will illuminate.

If Source 1 Available LED does not illuminate, verify that Source 1 Voltage is above the preset restore value.

The Gen-Set will start and run while

Source 2 stop Delay Timer is timing.

5.Close the External (up-stream) Source 2 line circuit breaker.

6.Start the engine generator in MANUAL mode.

NOTE: When the voltage and frequency reach preset values, the Source 2 Available LED will illuminate.

7.Verify the phase to phase voltages at Source 2 line terminals.

8.Verify that the phase rotation of

Source 2 is the same as the phase rotation of Source 1.

9.Shut down the generator's engine.

(Place in Automatic Mode.)

NOTE: Source 2 Available LED will turn off.

NOTE: The engine generator will continue to run for the duration of Source 2 Stop Delay Timer.

10.Place the disconnect switch to ENABLE.

11.Complete the visual inspection of the transfer switch.

12.Close the enclosure.

13.Lock the enclosure.

WARNING

When performing a hi-pot or

dielectric test on the power section,

DISCONNECT the control panel plugs from

the microprocessor to avoid potential damage.

GE Zenith Controls

Entelli-Switch 250 Operation and Maintenance Manual (71R-2000)

5

Image 5
Contents GE Zenith Controls Introduction Authorized ServiceTable of Contents Final Equipment Inspection Safety / InstallationEquipment Inspection and Storage Initial Energization Installation cont’dEngine Start Control Connections R E T E S T Initial Energization cont’dInstallation cont’d Entelli-Switch 250 Controller Entelli-Switch 250 ControllerLCD & Keypad Entelli-Switch 250 Controller cont’dUser Setting for Voltage & Frequency Stds Exes Cons Sens Spes Psgs Accessory Group PackagesCalibrate Accessory DefinitionsA62 Accessory Definitions cont’d S12P Approximate out of phase degreesS13P S14Press More and scroll to SET System Clock using the More key How to Set the System ClockPress Exer Cancl Press Start Timer Test CDT One Event Timer ExerciserPress Bypass Exer Press Cancl BpassLoad / No-Load Clock Exerciser CDP Clock ExerciserTurn options on or OFF via keypad through the CFG menu Entelli-Switch 250 User Setup CFG MenuChange adjustable values through the SET menu Entelli-Switch 250 User Setup SET MenuView System Data Entelli-Switch 250 User Setup System InfoIntroduction TestingTest Options Auto PositionATS Testing Testing cont’dDelayed Transition Standard TransitionRe-Transfer with Closed Transition Closed TransitionInitiating a Closed Transition Test Location Emergency Service Procedure for Extended Parallel TimeAuto Location ATS Type Sequence of OperationSequence of Operation cont’d Relay/Transformer R/T Box Amp Molded Power Section Transformer Usage see FigureRelay/Transformer R/T Box cont’d Delayed / Closed TransitionDelayed / Closed Transition R/T Box Schematic Standard Transition R/T Box SchematicGeneral Troubleshooting Troubleshooting and DiagnosticsInspection and Cleaning Maintenance and TestingTesting ServicingPage GE Zenith Controls