GE Entelli-Switch 250 manual CDT One Event Timer Exerciser, Press Bypass Exer, Press Cancl Bpass

Page 15

CDT One Event Timer Exerciser

Load or No-Load

One event Exerciser with adjustable Timer. Exercise duration can be set between 5 and 60 minutes in

1 minute increments. Can be configured to run every 1,7,14, or 28 days. Factory default is 20 minutes.

How to CONFIGURE (CFG) and Set (SET) the Timer Exerciser

1.Beginning from the S1 OK screen, press MORE then CFG.

2.Press MORE to scroll to CONFIG TIMER EXERCISER screen.

3.The third line of the CONFG TIMER EXERCISER will show either DAILY, WEEKLY, 14 DAY, 28 DAY, or OFF.

4.If the third line of the CONFG TIMER EXERCISER shows DAILY, WEEKLY, 14 DAY, or 28 DAY as desired, then proceed to step 10.

5.If the third line of the CONFG TIMER EXERCISER shows OFF or if another timer selection is desired, continue.

6.Press SEL.

7.Enter ACCESS code located on white label on the back of the controller.

8.Press UP or DOWN to select DAILY, WEEKLY, 14 DAY, or 28 DAY as desired.

9.Press SAVE.

10.Press MORE to scroll to CONFG TIMER EXERCISER (XFR) or (NO XFR).

11.Press Up or Down to select XFR (Load Transfer) or NO XFR (No Load Transfer).

12.Press SAVE.

13.Press MORE repeatedly to BACK then S1 OK screen.

Set (SET) the Exerciser:

14.Beginning from the S1 OK screen, press MORE then SET.

15.Press MORE repeatedly until EXER S2 RUN TIME screen.

16.Press SEL

17.Enter ACCESS code located on white label on the back of the controller.

18.Press SEL

19.Cursor is indicated as a line under character to

be changed. Change values with up and down keys.

20.Press SAVE when complete.

21.Press MORE repeatedly until SET USER SETUP then press BACK then ESC to the S1 OK screen.

How to Initiate CDT Exerciser and to start an exercise cycle every 1, 7, 14, or 28 days

From S1 screen

1)Press TEST

2)Press MORE

3)Press START TEST TIMER (to initiate Test).

If the CDT Exerciser is Factory configured for a Load Exerciser, the Controller will immediately start a load exercise. The controller will start the generator, transfer the load to Source 2 and remain in Source 2 for the duration set for EXER S2 RUN TIME in the SET menu. The controller will retransfer the load back to Source 1 after the S1 stable timer has timed out and run the generator unloaded for the duration of the S2 stop delay timer (Engine Cool Down Timer).

If the CDT Exerciser is Factory configured for a No-Load Exerciser, the Controller will immediately start a No-load exercise. The controller will start the generator and run it unloaded for the duration of the S2 stop delay timer (Engine Cool Down Timer).

Exercise will be repeated at the same time as initiated on every 1, 7, 14, or 28 days according to the selection made in the Configure CFG menu.

How to Bypass (Cancel) an exercise during an exercise cycle

1)Press BPASS

2)Allow the controller to complete the Engine

cool down cycle

If the CDT Exerciser is Factory configured for a No-Load Exerciser Or allow the controller to complete retransfer to Source 1 If the CDT Exerciser is Factory configured for a Load Exerciser

How to Bypass the next exercise event and Keep the rest of scheduled events unchanged

1)Press Test

2)Press MORE

3)Press BYPASS EXER

To re-institute the next exercise event back,

press CANCL BPASS

How to initiate a new exercise start time

1)Press TEST

2)Press MORE

3)Press EXER CANCL

4)Press START TIMER TEST

How to check the next exercise event

1)From S1 OK screen, press MORE three times.

2)The unit will display the PLANT EXERCISER NEXT event in DAYS, HOURS, and MINUTES

3)Press ESC to S1 OK Screen.

Notes:

-*E* appears in the upper right hand corner of LCD screen when exercise is impending.

-For Load Exerciser, actual exercise period (ATS in S2 position)= CDT (Exerciser)

timing period +T (S1 stable Timer) timing period.

GE Zenith Controls

Entelli-Switch 250 Operation and Maintenance Manual (71R-2000)

15

Image 15
Contents GE Zenith Controls Authorized Service Table of ContentsIntroduction Safety / Installation Equipment Inspection and StorageFinal Equipment Inspection Installation cont’d Engine Start Control ConnectionsInitial Energization R E T E S T Initial Energization cont’dInstallation cont’d Entelli-Switch 250 Controller Entelli-Switch 250 ControllerLCD & Keypad Entelli-Switch 250 Controller cont’dUser Setting for Voltage & Frequency Stds Exes Cons Sens Spes Psgs Accessory Group PackagesAccessory Definitions A62Calibrate Accessory Definitions cont’d S14 Approximate out of phase degreesS12P S13PPress More and scroll to SET System Clock using the More key How to Set the System ClockPress Cancl Bpass CDT One Event Timer ExerciserPress Exer Cancl Press Start Timer Test Press Bypass ExerLoad / No-Load Clock Exerciser CDP Clock ExerciserTurn options on or OFF via keypad through the CFG menu Entelli-Switch 250 User Setup CFG MenuChange adjustable values through the SET menu Entelli-Switch 250 User Setup SET MenuView System Data Entelli-Switch 250 User Setup System InfoAuto Position TestingIntroduction Test OptionsStandard Transition Testing cont’dATS Testing Delayed TransitionClosed Transition Initiating a Closed TransitionRe-Transfer with Closed Transition Emergency Service Procedure for Extended Parallel Time Auto LocationTest Location ATS Type Sequence of OperationSequence of Operation cont’d Relay/Transformer R/T Box Amp Molded Power Section Transformer Usage see FigureRelay/Transformer R/T Box cont’d Delayed / Closed TransitionDelayed / Closed Transition R/T Box Schematic Standard Transition R/T Box SchematicGeneral Troubleshooting Troubleshooting and DiagnosticsServicing Maintenance and TestingInspection and Cleaning TestingPage GE Zenith Controls