
Installing the Fibre Loop Switch
Figure 7: Marking Holes and Attaching Barrel Nuts on HP Systems Racks
Right Rear Rack Column
EIA Unit
Barrel Nuts
Left Rear Rack Column
17

Installing the Fibre Loop Switch
Right Rear Rack Column
EIA Unit
Barrel Nuts
Left Rear Rack Column
17