Thermo Products CMA1-50N, CMA2-75N service manual BLOWER MOTOR SPEED WIRING Figure

Page 31
4. BLOWER MOTOR SPEED WIRING

All installations and services must be performed by qualified service personnel.

mounted junction box. The hot leg must pass through the disconnect switch in all cases to prevent the hazard of electrical shock when servicing.

IMPORTANT: The furnace must be grounded in accordance with local codes and with the National Electrical Code, ANSI/NFPA NO. 70 (Latest Edition) when an external electrical source is utilized.

4. BLOWER MOTOR SPEED WIRING

Figure 15.

BLOWER DELAY SETTINGS

To delay fan turn-on by:

15sec.

30sec.

*45 sec.

60 sec,

 

Set Switch

#1

#2

Off

Off

Off

On

On

Off

On

On

To delay fan

Set Switch

turn-off by:

#3

#4

60 sec.

On

On

90 sec.

Off

On

*120 sec.

On

Off

180 sec.

Off

Off

*Factory Settings For Optimal Performance

29

Image 31
Contents DOWN FLOW & DIRECT VENT SEALED COMBUSTION INSTALLATION AND SERVICE MANUALFOR YOUR SAFETY GAS FIRED HIGH EFFICIENCY FURNACESECTION TABLE OF CONTENTSI. SAFETY INFORMATION Page Page The vent and air intake elbows must be kept away from bushes, shrubs or any vegetation that may restrict the flow of flue products. It must also be kept clear of any leaves, weeds or other combustible materials. Keep the vent hood clear of snow. Avoid locating the terminals in areas where standing water or condensate drippage may be a problem 1.A windows be opened GAS SUPPLY PRESSURE II. FURNACE SPECIFICATIONS - CMA SERIESDIMENSIONS MODELINSTALLATION PARTS PACKAGE NON-COMBUSTIBLEMATERIAL COMBUSTIBLE MATERIAL.” COMBUSTIBLE MATERIALMODELS CMA IV. GENERAL INSTALLATION A.FURNACE LOCATIONTable Coil Cabinet Combustible Floor Base Model: 70-BASE Figure 1AFigure 1B Cottage Base Model: 01COT-BASE Figure 1C 1. Combustible Floor Base Model: 70 BASE B. BASE INSTALLATIONFigure Figure 2. Cottage Base Model: 01COT BASE C. ALCOVE INSTALLATIONFigure Figure D. CLOSET INSTALLATIONE. FUEL PIPING F.GENERAL VENTING REQUIREMENTS Table MAXIMUM VENT LENGTHFigure 6. CMA*-75SHOWN 1. Vent And Combustion Air Pipes H. Direct Venting Through a Sidewall2. Exhaust Vent Termination Elbow Sidewall Venting Page 4. Vent Terminal Location Guidelines Terminations Figure Figure 5.Secure plate to roofFigure K.CONDENSATE DRAIN LINE AND TRAP ASSEMBLY 1. Electrical Branch Supply Circuit Figure L.ELECTRICAL WIRING2.Connection Of Power Supply Wires 3.Connection Of Room Thermostat WiresElectrical Wire Diameter AWG 24 22 20 18 4. BLOWER MOTOR SPEED WIRING Figure Pressure CMA1-50Speed Tap \ StaticPressure CMA2-75Speed Tap \ Static5. FIELD WIRING AND REPLACING WIRING V.STARTING THE UNIT A. SEQUENCE OF OPERATIONS MAIN BURNER OPERATION CALL FOR HEAT SATISFIED OPERATING INSTRUCTIONS B.INITIAL START UPC.ADJUSTMENT OF BTU INPUT RATE D.BURNER ADJUSTMENT GAS PRESSURE CHART FOR CMA* MODEL FURNACESFigure E.SETTING TEMPERATURE RISEF.FURNACE CHECKOUT PROCEDURE VII. DEALER MAINTENANCE VI. INSTALLERS INSTRUCTIONS TO USERB.GENERAL INSPECTION 2.CONDENSATE LINE/TRAP ASSEMBLY4. INDUCER BLOWER ASSEMBLY A.ELECTRICALD.HOUSE AIR BLOWER 1.CLEANING THE COIL AIR SIDE5. GASKETS/SEALING MATERIALS C.HEAT EXCHANGERDIAGNOSTIC FEATURES FILTER MAINTENANCE PROCEDUREFILTER REPLACEMENT VIII. TROUBLESHOOTINGThe LED will also flash once at power-up TROUBLESHOOTING GUIDE AT THE INTEGRATED CONTROL? Yes AFTER GAS VALVE OPENS, DO THE BURNERS IGNITE? DOES SYSTEM RUN UNTIL THERMOSTAT IS SATISFIED? IF LED LIGHT FLASHES APPENDIX – A REPLACEMENT PARTS Page APPENDIX – B WIRING DIAGRAM