HP MSR1000 Router manual Contents

Page 3

Contents

Legal and notice information·········································································································································i

Preparing for installation ············································································································································· 1

Safety recommendations ··················································································································································1 Safety symbols ··························································································································································1 General safety recommendations···························································································································1 Electricity safety ························································································································································1 Examining the installation site ·········································································································································2 Temperature and humidity·······································································································································2 Cleanness··································································································································································2 Cooling system ·························································································································································3 ESD prevention ·························································································································································3 EMI·············································································································································································4 Lightning protection··················································································································································4 Rack-mounting···························································································································································4 Installation accessories ·····················································································································································5 Installation checklist ··························································································································································5

Installing the router······················································································································································· 8

Installation prerequisites ···················································································································································8 Installation flowchart·························································································································································8 Installing the router························································································································································· 10 Mounting the router on a workbench·················································································································· 10 Installing the router in a rack ······························································································································· 10 Grounding the router ····················································································································································· 13 Grounding the router through the rack ··············································································································· 13 Grounding the router with a grounding strip ····································································································· 15 Grounding the router with a grounding conductor buried in the earth ground ············································· 16 Installing an interface module······································································································································· 16 Installing a SIC······················································································································································· 16 Installing a DSIC···················································································································································· 17 Connecting interface cables ········································································································································· 18 Attaching a USB device················································································································································· 19 Logging in through the console port ···························································································································· 19 Connecting a console cable································································································································· 19 Setting terminal parameters·································································································································· 20 Connecting an AC power cord ···································································································································· 23 Verifying the installation················································································································································ 23 Powering on the router ·················································································································································· 23 Verifying before power-on···································································································································· 23 Powering on the router ········································································································································· 24 Displaying boot information································································································································· 24 Examining the router after power-on··················································································································· 25 Configuring basic settings for the router ····················································································································· 25

Replacement procedure ·············································································································································26

Replacing a SIC ····························································································································································· 26 Replacing a DSIC··························································································································································· 26

Troubleshooting··························································································································································28

Power supply failure ······················································································································································ 28

i

Image 3
Contents HP MSR1000 Routers Page Contents Page General safety recommendations Preparing for installationSafety recommendations Safety symbolsExamining the installation site Temperature and humidityCleanness ESD prevention Cooling systemRack-mounting Lightning protectionInstallation accessories Installation checklistRequirements Result Components when observing or moving a removed Requirements Result Installing the router Installation prerequisitesInstallation flowchart Installation flow Installing the router Installing the router in a rackMounting the router on a workbench Marking the positions of cage nuts Page Grounding the router through the rack Grounding the routerGrounding the router through the rack Grounding the router with a grounding strip Installing a SIC Installing an interface moduleRemoving the filler panel Installing a DsicFasten the captive screws to secure the Dsic Connecting interface cablesConnecting a console cable Attaching a USB deviceLogging in through the console port Connection description Setting terminal parametersSetting the serial port used by the HyperTerminal connection HyperTerminal window Verifying before power-on Connecting an AC power cordVerifying the installation Powering on the routerDisplaying boot information Powering on the routerPress Enter, and the following prompt appears Configuring basic settings for the routerExamining the router after power-on You can now configure the routerReplacement procedure Replacing a SICReplacing a Dsic Removing a Dsic No terminal display TroubleshootingPower supply failure System configuration problemsScenario Restoring the factory settingsGarbled terminal display No response from the serial portReset button usage guidelines Following figures are for illustration only Appendix a Chassis views and technical specificationsChassis views MSR1002-4Technical specifications MSR1003-8MSR1002-4 MSR1003-8 MSR1002-4 MSR1003-8 State Description Appendix B LEDsPanel LEDs LED descriptionSERIAL0 Appendix C Slot arrangement Support and other resources Contacting HPRelated information Convention Description ConventionsNetwork topology icons E G I L M N P R S T V W Index
Related manuals
Manual 8 pages 47.39 Kb