COOLING TROUBLESHOOTING GUIDE

On calls for cooling, if the compressors are operating but the supply air blower motor does not energize after a short delay (the room thermostat fan switch is in the “AUTO” position).

1.Turn the thermostat fan switch to the ON position. If the supply air blower motor does not energize, go to Step 3.

2.If the blower motor runs with the fan switch in the ON position but will not run after the first compressor has energized when the fan switch is in the AUTO position, check the room thermostat for contact between R and G in the AUTO position during calls for cooling.

3.If the supply air blower motor does not energize when the fan switch is set to ON, check that line voltage is being supplied to the contacts of the M3, contactor, and that the contactor is pulled in. Check for loose wiring between the contactor and the supply air blower motor.

4.If M3 is pulled in and voltage is supplied to M3, lightly touch the supply air blower motor housing. If it is hot, the motor may be off on internal protection. Cancel any thermostat calls and set the fan switch to AUTO. Wait for the internal overload to reset. Test again when cool.

5.If M3 is not pulled in, check for 24 volts at the M3 coil. If 24 volts are present at M3 but M3 is not pulled in, replace the contactor.

6.Failing the above, if there is line voltage supplied at M3, M3 is pulled in, and the supply air blower motor still does not operate, replace the motor.

7.If 24 volts is not present at M3, check that 24 volts is present at the UCB supply air blower motor terminal, “FAN”. If 24 volts is present at the FAN, check for loose wiring between the UCB and M3.

8.If 24 volts is not present at the “FAN” terminal, check for 24 volts from the room thermostat. If 24 volts are not present from the room thermostat, check for the follow- ing:

a.Proper operation of the room thermostat (contact between R and G with the fan switch in the ON posi- tion and in the AUTO position during operation calls).

b.Proper wiring between the room thermostat and the UCB.

c.Loose wiring from the room thermostat to the UCB.

9.If 24 volts is present at the room thermostat but not at the UCB, check for proper wiring between the thermostat and the UCB, i.e. that the thermostat G terminal is con- nected to the G terminal of the UCB, and for loose wir- ing.

10.If the thermostat and UCB are properly wired, replace the UCB.

On calls for cooling, the supply air blower motor is operating but compressor #1 is not (the room thermostat fan switch is in the “AUTO” position).

1.If installed, check the position of the economizer blades. If the blades are open, the economizer is providing free cooling and the compressors will not immediately oper- ate. If both stages of cooling are requested simulta- neously and the economizer provides free cooling, following a short delay compressor #1 will be energized unless it is locked out. If compressor #1 is locked out, compressor #2 is energized. Compressor #2 is always energized in place of compressor #1 when compressor #1 is requested but locked out.

2.If no economizer is installed or the economizer is not opening to provide free cooling and compressor #1 does not energize on a call for cooling, check for line voltage at the compressor contactor, M1, and that the contactor is pulled in. Check for loose wiring between the contac- tor and the compressor.

3.If M1 is pulled in and voltage is supplied at M1, lightly touch the compressor housing. If it is hot, the compres- sor may be off on inherent protection. Cancel any calls for cooling and wait for the internal overload to reset. Test again when cool.

4.If M1 is not pulled in, check for 24 volts at the M1 coil. If 24 volts are present and M1 is not pulled in, replace the contactor.

5.Failing the above, if voltage is supplied at M1, M1 is pulled in, and the compressor still does not operate, replace the compressor.

6.If 24 volts is not present at M1, check for 24 volts at the UCB terminal, C1. If 24 volts is present, check for loose wiring between C1 and the compressor contactor.

7.If 24 volts is not present at the C1 terminal, check for 24 volts from the room thermostat at the UCB Y1 terminal. If 24 volts is not present from the room thermostat, check for the following:

a.24 volts at the thermostat Y1 terminal

b.Proper wiring between the room thermostat and the UCB, i.e. Y1 to Y1, Y2 to Y2

c.Loose wiring from the room thermostat to the UCB.

8.If 24 volts is present at the UCB Y1 terminal, the com- pressor may be out due to an open high-pressure switch, low-pressure switch, or freezestat. Check for 24 volts at the HPS1, LPS1, and FS1 terminals of the UCB. If a switch has opened, there should be a voltage potential between the UCB terminals, e.g. if LPS1 has opened, there will be a 24-volt potential between the LPS1 termi- nals.

9.If 24 volts is present at the UCB Y1 terminal and none of the protection switches have opened, the UCB may have

46

Unitary Products Group

Image 46
Contents Installation Manual Table of Contents List of Figures List of TablesGeneral Safety ConsiderationsInspection Approvals ReferenceRenewal Parts 12½ Ton Predator Model Number Nomenclature 150 N15 NomenclatureNOMENCLATURE, Additional Options Installation Safety Information InstallationPreceding Installation Compressor Section LimitationsPREDATOR Magnum Component Location Rigging and Handling Unit Temperature LimitationsUnit Voltage Limitations LocationPoint Load Weight Unit WeightsClearances Unit Dimensions Detail CBottom Duct Openings from Above Rear Duct Dimensions Ductwork Duct CoversPREDATOR Magnum Roof Curb Dimensions Power and Control Wiring Thermostat WiringControl Wire Sizes FiltersPower Wiring Detail Electronic Thermostat Field WiringField Wiring 24 Volt Thermostat Contactor 1M Factory or Field Ground MCA Optional Electric Heat Physical DataMinimum Supply AIR CFM GAS Heat Application Data Optional GAS HeatGAS Piping GAS Connection LP UNITS, Tanks and PipingFactory Installed Options Field Installed Accessories Enthalpy SET Point Adjustment Minimum Position AdjustmentIndoor AIR Quality AQ Enthalpy SET Point Chart Supply AIR Limitations PhasingBlower Rotation Belt TensionTurns Open ESP‡ CFM BHP Blower performance includes dry coil and two-inch Checking AIR Quantity Indoor Blower SpecificationsAIR Balance Method ONEDRY Coil Delta P Supply AIR Drive Adjustment Motor Sheave Datum Diameters OperationAdditional Static Resistance Cooling Sequence of OperationHIGH-PRESSURE Limit Switch Economizer Single or Dual with Power ExhaustCooling Operation Errors No Outdoor AIR OptionsSafety Controls Compressor ProtectionElectric Heating Sequence of Operations Electric Heating Operation ErrorsElectric Heat Limit Setting Electric Heat Anticipator SetpointsGAS Heating Sequence of Operations GAS Heating Operation ErrorsIgnition Control Board GAS Heat Limit Control Settings START-UP Cooling START-UP GAS HeatShut Down Post Start ChecklistManifold GAS Pressure Adjustment Checking GAS InputGAS Rate Cubic Feet PER Hour Adjustment of Temperature Rise BURNERS/ORIFICES INSPECTION/SERVICINGPREDATOR Magnum Flash Codes TroubleshootingCharging the Unit Unit Control Board Flash CodesBasic Troubleshooting Flowchart Trip Failure Flow Chart Cooling Troubleshooting Guide Unitary Products Group 035-19046-002-B-0104 GAS Heat Troubleshooting Guide Unitary Products Group 035-19046-002-B-0104 Unitary Products Group Unitary 5005 Norman Products York Group Drive 73069

DJ150 specifications

The York DJ150 is a standout model in the world of portable DJ equipment, designed to cater to both budding DJs and seasoned professionals. Its sleek and compact form factor makes it highly portable, allowing for easy transporting to gigs, parties, or personal events.

One of the main features of the DJ150 is its user-friendly interface, which includes a simplified control layout. This design boils down essential functions into accessible buttons and knobs, enabling DJs to focus on their mixes without distractions. The large jog wheels are not only responsive but also provide precision when scratching and cueing tracks, making it a joy to use for both live performances and practice sessions.

In terms of sound quality, the York DJ150 is equipped with high-performance audio circuitry. It ensures that sound clarity is maintained, with a dynamic range that captures the intricacies of music. The device supports multiple audio formats, offering versatility for DJs that work with various types of digital music files.

The DJ150 integrates advanced technologies that facilitate seamless mixing and creative expression. With features such as built-in sound effects, loops, and samples, DJs can add their personal touch to sets. Additionally, the model includes an intelligent beat matching function which automatically syncs the tempo of different tracks, allowing for smooth transitions and uninterrupted flow.

Connectivity is another strong point for the York DJ150. It offers multiple input and output options, including USB ports for quick connections to a laptop or external devices, line inputs for instruments or microphones, and headphones output for monitoring. This ensures that users can connect a wide range of equipment while maintaining a clean setup.

Durability plays a key role in the DJ150's design, as it is built to withstand the rigors of frequent use. Its robust construction and quality materials contribute to its longevity, appealing to those who value reliable gear.

In conclusion, the York DJ150 represents a versatile solution for DJs seeking a blend of portability, functionality, and sound quality. Its comprehensive features and professional-grade technologies position it as a strong contender in the DJ equipment market, making it suitable for performances of all levels. Whether you are a novice starting your DJ journey or a seasoned pro looking for an efficient tool, the DJ150 ticks all the boxes.