Maytag HVN41250PCGA, HVN41250VCGA, HVN41240PCGA, HVP41250PCGA Venting, Vent Terminal Installation

Page 19
VENTING

VENTING

The vent system must terminate so that proper clearances are maintained as cited in local codes or the current edition of the Natural Gas and Propane Installation Code CAN/CSA B149.1 as follows:

1.The exit terminals of a mechanical vent system shall be not less than 7 feet (2.13 m) above grade when located adjacent to public walkways, see Figure 23.

2.A venting system shall terminate at least 3 feet (91 cm) above any forced air inlet, see Figure 23.

3.The venting system shall terminate at least 4 feet (1.2 m) below, 4 feet (1.2 m) horizontally from or, 12 inches (30 cm) above any door, window or gravity air inlet into any building.

The manufacturer also recommends that the vent termination should not be installed closer than 3 feet (91 cm) from an inside corner of an L shaped structure and not be less than 12 inches (30 cm) above grade.

Theventshallterminateaminimumof12inches(30cm)aboveexpected snowfall level to prevent blockage of vent termination, see Figure 23.

4.In cold climates, it is recommended that vent termination not be mounted directly above or within 3 feet (91 cm) horizontally from an oil tank vent or gas meter to avoid potential freeze-up from condensation, see Figure 23.

Plan the vent system layout so that proper clearances are maintained from plumbing and wiring.

Vent pipes serving power vented appliances are classified by building codes as “vent connectors”. Required clearances from combustible materials must be provided in accordance with information in this manual under FACTS TO CONSIDER ABOUT THE LOCATION and VENT TERMINAL INSTALLATIONS, and with the Natural Gas and Propane Installation Code CAN/CSA B149.1 and local codes.

VENT TERMINAL INSTALLATION

1.After the point of termination has been determined, use the cover plate as a template to mark the hole for the vent pipe to insert through the wall. BEWARE OF CONCEALED WIRINGAND PIPING INSIDE OF WALL.

2.If the Vent Terminal is being installed on the outside of a finished wall, it may be easier to mark both the inside and outside wall. Align the holes by drilling a hole through the center of the template from the inside through to the outside. The template can now be positioned on the outside wall using the drilled hole as a centering point for the template.

3.A) MASONRY SIDE WALLS

Chisel an opening approximately one half inch larger than the marked circle.

B) WOODEN SIDE WALLS

Drill a pilot hole approximately one quarter inch outside of the marked circle. This pilot hole is used as a starting point for a saws-all or sabre saw blade. Cut around the marked circle staying approximately one quarter inch outside of the line. (This will allow the vent pipe to easily slide through the opening. The resulting gap will be covered up by the vent terminal cover plates.) Repeat this step on inside wall if necessary.

4.When the vent piping cannot pass through an outside wall at a height greater than or equal to 12" above the ground (or above snow accumulation level), then the installation can be modified as shown below.

FIGURE22.

19

Image 19
Contents Series Twelve POWER VENT GAS WATER HEATER USER’S GUIDEIMPORTANT DEFINITIONS SAFE INSTALLATION, USE AND SERVICESAFETY PRECAUTIONS TABLE OF CONTENTS CUSTOMER RESPONSIBILITIES PRODUCT SPECIFICATIONSPREPARING FOR THE INSTALLATION Tools MATERIALS AND BASIC TOOLS NEEDEDAccessories Additional Tools Needed When Sweat Soldering2, 3 OR 4 PVC VENT CAPABILITY TYPICAL INSTALLATIONGET TO KNOW YOUR WATER HEATER - GAS MODELS GAS MODELS WITH HOT SURFACE IGNITIONMIXING VALVE USAGE TYPICAL INSTALLATIONFIGURE2 Removing the Old Water Heater INSTALLATION INSTRUCTIONSFIGURE9 FACTS TO CONSIDER ABOUT THE LOCATIONINSULATION BLANKETS FIGURE15 FIGURE12FIGURE13 FIGURE14WATER PIPING T & P Valve and Pipe Insulation if supplied TEMPERATURE-PRESSURERELIEF VALVEFIGURE17 GAS PIPING FIGURE 18. GAS PIPING WITH FLEXIBLECONNECTORFILLING THE WATER HEATER BLOWER ASSEMBLY INSTALLATIONSEQUENCEOFINSTALLATION SEDIMENT TRAPSVENTING AND INSTALLATION VENT CONNECTIONS TO BLOWER ASSEMBLYFIGURE21 50,000 BTU Units CONDENSATIONMAXIMUM VENT LENGTHS 40,000 BTU UnitsVENTING VENT TERMINAL INSTALLATIONFIGURE22 FIGURE24 VERTICAL VENT THROUGH ROOFVERTICAL VENT RESTRICTIONS FIGURE23RECOMMENDED BRUSH* SIZE FOR PRIMER VENT PIPE PREPARATIONAND CEMENT APPLICATIONS B.Deburring D.Inspection, cleaning, primingSTEPE F. Joint assembly STEPF G. Cleanup and joint movementTO TURN OFF GAS TO APPLIANCE OPERATING INSTRUCTIONSFOR YOUR SAFETY READ BEFORE OPERATING OPERATING INSTRUCTIONSFIGURE26 TEMPERATURE REGULATIONSTART UP CONDITIONS FOR YOUR INFORMATIONOPERATIONAL CONDITIONS BURNER OPERATION AND INSPECTION SERVICE AND ADJUSTMENTBURNER CLEANING VENTING SYSTEM INSPECTIONDRAINING DRAIN VALVE WASHER REPLACEMENTSERVICE ANODE ROD INSPECTIONLEAKAGE CHECKPOINTS WATER HEATER CONTROL TROUBLESHOOTING GUIDELINESPROBLEM SOLUTIONThese guidelines should be used by a qualified Maytag Customer Service Center Agent. Call the Maytag Customer Service Center at TROUBLESHOOTING GUIDELINESTHIS IS A REPAIR PARTS LIST, NOT A PACKING LIST REPAIR PARTS LISTLIMITED TANK WARRANTY AGAINST LEAKS WARRANTYFULL ONE YEAR WARRANTY LIMITED PARTS WARRANTY