Maytag HVN41240PCGA, HVN41250VCGA manual Vertical Vent Through Roof, Vertical Vent Restrictions

Page 20
FIGURE23.

FIGURE23.

This unit can vent through 2", 3" or 4" nonmetallic pipe and fittings.

The vent pipe installation can be started from either the blower discharge or the termination wall. Keep in mind the total vent system (pipe and elbows) when installing the vent system, see VENTING AND INSTALLATIONAND MAXIMUM VENT LENGTHS, pages 17 - 18.

FIGURE24.

The vent terminal should be kept as close as possible to the outside wall, but you need to allow at least 1.5" (3.8 cm) of pipe past the wall, for the wall flange and vent terminal to mount on the pipe.

Before the vent terminal is installed, caulk (not supplied) around the pipe on the exterior wall and install the optional wall flange. The flange can be held to the outside wall by placing some of the caulking on the back of the flange. The wall flange is supplied for decorative purposes only and is not a requirement for the vent termination (if not needed by the installer).

VERTICAL VENT THROUGH ROOF

This unit is approved for venting through the roof with the type vent terminal that is included with the unit. A proper flashing or “BOOT” should be used to seal the pipe where it exits the roof.

The total vent system should not exceed that which is specified, see VENTINGAND INSTALLATION, pages 17 - 18.

All of the pipe should be secured as per the instructions in the instructions

VERTICAL VENT RESTRICTIONS

1.Minimum of twelve 12" (30.5 cm) above the roof or twelve 12" (30.5 cm) above the anticipated snow level. Provide proper support for all pipe protruding through the roof.

FIGURE25.

2.4' (1.2 m) from or 1' (0.3 m) above any gable, dormer, or other roof structure with access to interior of building (i.e.-vent, window etc.).

in the VENTINGAND INSTALLATION, pages 17 - 18.

3. 3' (0.9 m) above any forced air inlet located within 10' (3.0 m).

20

Image 20
Contents POWER VENT GAS WATER HEATER USER’S GUIDE Series TwelveSAFE INSTALLATION, USE AND SERVICE IMPORTANT DEFINITIONSSAFETY PRECAUTIONS TABLE OF CONTENTS PREPARING FOR THE INSTALLATION PRODUCT SPECIFICATIONSCUSTOMER RESPONSIBILITIES MATERIALS AND BASIC TOOLS NEEDED AccessoriesAdditional Tools Needed When Sweat Soldering ToolsTYPICAL INSTALLATION GET TO KNOW YOUR WATER HEATER - GAS MODELSGAS MODELS WITH HOT SURFACE IGNITION 2, 3 OR 4 PVC VENT CAPABILITYFIGURE2 TYPICAL INSTALLATIONMIXING VALVE USAGE INSTALLATION INSTRUCTIONS Removing the Old Water HeaterFACTS TO CONSIDER ABOUT THE LOCATION FIGURE9INSULATION BLANKETS FIGURE12 FIGURE13FIGURE14 FIGURE15WATER PIPING FIGURE17 TEMPERATURE-PRESSURERELIEF VALVET & P Valve and Pipe Insulation if supplied FIGURE 18. GAS PIPING WITH FLEXIBLECONNECTOR GAS PIPINGBLOWER ASSEMBLY INSTALLATION SEQUENCEOFINSTALLATIONSEDIMENT TRAPS FILLING THE WATER HEATERFIGURE21 VENT CONNECTIONS TO BLOWER ASSEMBLYVENTING AND INSTALLATION CONDENSATION MAXIMUM VENT LENGTHS40,000 BTU Units 50,000 BTU UnitsFIGURE22 VENT TERMINAL INSTALLATIONVENTING VERTICAL VENT THROUGH ROOF VERTICAL VENT RESTRICTIONSFIGURE23 FIGURE24AND CEMENT APPLICATIONS VENT PIPE PREPARATIONRECOMMENDED BRUSH* SIZE FOR PRIMER D.Inspection, cleaning, priming STEPE F. Joint assemblySTEPF G. Cleanup and joint movement B.DeburringOPERATING INSTRUCTIONS FOR YOUR SAFETY READ BEFORE OPERATINGOPERATING INSTRUCTIONS TO TURN OFF GAS TO APPLIANCETEMPERATURE REGULATION FIGURE26OPERATIONAL CONDITIONS FOR YOUR INFORMATIONSTART UP CONDITIONS SERVICE AND ADJUSTMENT BURNER CLEANINGVENTING SYSTEM INSPECTION BURNER OPERATION AND INSPECTIONDRAIN VALVE WASHER REPLACEMENT SERVICEANODE ROD INSPECTION DRAININGLEAKAGE CHECKPOINTS TROUBLESHOOTING GUIDELINES PROBLEMSOLUTION WATER HEATER CONTROLTROUBLESHOOTING GUIDELINES These guidelines should be used by a qualified Maytag Customer Service Center Agent. Call the Maytag Customer Service Center atREPAIR PARTS LIST THIS IS A REPAIR PARTS LIST, NOT A PACKING LISTWARRANTY FULL ONE YEAR WARRANTYLIMITED PARTS WARRANTY LIMITED TANK WARRANTY AGAINST LEAKS