Slant/Fin
VHS-180, VHS-30
installation instructions
Victory II VHS Models
Install
Delayed Ignition Cause Remedy
Electrical Wiring
Maintenance
Vent Connector Material
Annual Inspection and Cleaning
Safety
Page 13
V
ICTORY
II
VHS Models
Figure 10.
13
Page 12
Page 14
Image 13
Page 12
Page 14
Contents
Victory
485
Victory II VHS Models
Safety
Installation Requirements
Natural GAS-FIRED Boiler Location
Liquefied Petroleum L.P. Propane GAS-FIRED Boiler Location
Flue GAS Venting Requirements
Boiler Room AIR Supply and Ventilation
Approved Venting Applications
Category II and III Venting
Heat-Fab Saf-T Vent System
Victory II Horizontal Sidewall Venting
Victory II VHS Models
Victory II VHS Models
Venting Requirements
Vent Connector Material
Masonry Vitreous Tile-Lined Chimney not metal lined
Connector Requirements
Additional National Fuel Gas Code Boiler Gas Appliance
Type B Venting and Metal-Lined Masonry Chimney
Victory II VHS Models
Victory II VHS Models
Venting System Regular Inspection
Electrical Wiring
GAS Piping
Supply and Return
Water Piping
Circulating Systems
Air Control System
Victory II VHS Models
Piping Arrangement
Operating INSTRUCTIONS, Basic
Operating Instructions
Safety Information
Victory II VHS Models Gas Rate Table
Safety Check
Care and Maintenance
Inspection During Heating Season
Annual Inspection and Cleaning
Victory II Boiler Sequence of Operations
Burners will not SHUT-OFF Cause Remedy
Burners Fail to Operate Cause Remedy
Flash BACK-BURNING AT Orifices Cause Remedy
Not Enough Heat Cause Remedy
Delayed Ignition Cause Remedy
Fumes and GAS Odors Cause Remedy
Burner Short Cycles Cause Remedy
Appendix a
SLANT/FIN CORPORATION, Greenvale, N.Y Phone 516
Top
Page
Image
Contents