Slant/Fin VHS-180, VHS-30 installation instructions Victory II VHS Models

Page 13

VICTORY II VHS Models

Figure 10.

13

Image 13
Contents Victory 485 Victory II VHS ModelsSafety Installation RequirementsNatural GAS-FIRED Boiler Location Liquefied Petroleum L.P. Propane GAS-FIRED Boiler LocationFlue GAS Venting Requirements Boiler Room AIR Supply and VentilationApproved Venting Applications Category II and III Venting Heat-Fab Saf-T Vent System Victory II Horizontal Sidewall Venting Victory II VHS Models Victory II VHS Models Venting Requirements Vent Connector MaterialMasonry Vitreous Tile-Lined Chimney not metal lined Connector RequirementsAdditional National Fuel Gas Code Boiler Gas Appliance Type B Venting and Metal-Lined Masonry ChimneyVictory II VHS Models Victory II VHS Models Venting System Regular Inspection Electrical WiringGAS Piping Supply and Return Water PipingCirculating Systems Air Control SystemVictory II VHS Models Piping Arrangement Operating INSTRUCTIONS, Basic Operating Instructions Safety InformationVictory II VHS Models Gas Rate Table Safety CheckCare and Maintenance Inspection During Heating Season Annual Inspection and CleaningVictory II Boiler Sequence of Operations Burners will not SHUT-OFF Cause Remedy Burners Fail to Operate Cause RemedyFlash BACK-BURNING AT Orifices Cause Remedy Not Enough Heat Cause Remedy Delayed Ignition Cause RemedyFumes and GAS Odors Cause Remedy Burner Short Cycles Cause RemedyAppendix a SLANT/FIN CORPORATION, Greenvale, N.Y Phone 516