Slant/Fin VHS-30, VHS-180 installation instructions Heat-Fab Saf-T Vent System

Page 6

VICTORY II VHS Models

Heat-Fab Saf-T Vent System

 

Max. Equivalent Length (Ft.)

 

 

 

 

 

 

Equivalent

 

 

 

 

 

 

 

0 to

5500 to

7000 to

Length of

 

Boiler

5500 Ft.

7000 Ft.

10,000 Ft.

each 90°

Minimum

Model No.

Altitudes

Altitudes

Altitudes

Elbow, Ft.

Length, Ft.

 

 

 

 

 

 

VHS-30,

40

40

40

3

2

60, 90

 

 

 

 

 

and 120

 

 

 

 

 

 

 

 

 

 

 

VHS-150

40

40

20

3

2

 

 

 

 

 

 

VHS-180

40

20

20

3

2

 

 

 

 

 

 

ProTech FasNSeal System

 

Max. Equivalent Length (Ft.)

 

 

 

 

 

 

Equivalent

 

 

 

 

 

 

 

0 to

5500 to

7000 to

Length of

 

Boiler

5500 Ft.

7000 Ft.

10,000 Ft.

each 90°

Minimum

Model No.

Altitudes

Altitudes

Altitudes

Elbow, Ft.

Length, Ft.

 

 

 

 

 

 

VHS-30,

30

30

30

6

2

60, 90

 

 

 

 

 

and 120

 

 

 

 

 

 

 

 

 

 

 

VHS-150

30

30

15

6

2

 

 

 

 

 

 

VHS-180

30

15

15

6

2

 

 

 

 

 

 

Flex-L StaR-34 and Z-Flex Z-Vent System

 

Max. Equivalent Length (Ft.)

 

 

 

 

 

 

Equivalent

 

 

 

 

 

 

 

0 to

5500 to

7000 to

Length of

 

Boiler

5500 Ft.

7000 Ft.

10,000 Ft.

each 90°

Minimum

Model No.

Altitudes

Altitudes

Altitudes

Elbow, Ft.

Length, Ft.

 

 

 

 

 

 

VHS-30,

35

35

35

6

2

60, 90

 

 

 

 

 

and 120

 

 

 

 

 

 

 

 

 

 

 

VHS-150

35

35

18

6

2

 

 

 

 

 

 

VHS-180

35

18

18

6

2

 

 

 

 

 

 

Note: Vent termination is in addition to the allowed equivalent length.

6

Image 6
Contents Victory Victory II VHS Models 485 Natural GAS-FIRED Boiler Location Installation Requirements Safety Liquefied Petroleum L.P. Propane GAS-FIRED Boiler LocationBoiler Room AIR Supply and Ventilation Flue GAS Venting RequirementsApproved Venting Applications Category II and III Venting Heat-Fab Saf-T Vent System Victory II Horizontal Sidewall Venting Victory II VHS Models Victory II VHS Models Vent Connector Material Venting RequirementsAdditional National Fuel Gas Code Boiler Gas Appliance Connector RequirementsMasonry Vitreous Tile-Lined Chimney not metal lined Type B Venting and Metal-Lined Masonry ChimneyVictory II VHS Models Victory II VHS Models Electrical Wiring Venting System Regular InspectionGAS Piping Circulating Systems Water PipingSupply and Return Air Control SystemVictory II VHS Models Piping Arrangement Operating INSTRUCTIONS, Basic Safety Information Operating InstructionsSafety Check Victory II VHS Models Gas Rate TableCare and Maintenance Annual Inspection and Cleaning Inspection During Heating SeasonVictory II Boiler Sequence of Operations Burners Fail to Operate Cause Remedy Burners will not SHUT-OFF Cause RemedyFlash BACK-BURNING AT Orifices Cause Remedy Fumes and GAS Odors Cause Remedy Delayed Ignition Cause RemedyNot Enough Heat Cause Remedy Burner Short Cycles Cause RemedyAppendix a SLANT/FIN CORPORATION, Greenvale, N.Y Phone 516