1.High Limit Control Test

Set thermostat high enough for water temperature to reach high limit control setting of Aquastat. When this temperature is reached, the high limit switch should open and the main gas valve should close automatically.

2.Gas Control Safety Shutdown Test

With main burners firing, disconnect the ignition cable from S8600 ignitor (see Figure 17).

Gas valve should shut off the main burners. If gas valve fails to shut off the main burners, replace the gas valve.

3.Air Flow Pressure Switch Test

With main burners firing, remove plastic hose from Pres- sure Switch (see Figure 22). Gas valve should shut off the main burners.

WARNING: If any of the above controls fail to operate properly, they must be replaced.

4.Checking for Gas Leaks

Using soap solution, check for gas leaks from meter to burner, including gas valve, gas piping, manifold and pilot burner.

DO NOT use open flame.

Figure 22.

CARE AND MAINTENANCE

This section must be brought to the attention of the owner by the installer so that the owner can make the necessary arrangements with a qualified service agency for the periodic care and maintenance of the boiler. The installer must inform the owner that the gas supplier can recommend a number of qualified service agencies. The installer must also inform the owner that the lack of proper care and maintenance of this boiler and any fuel burning equipment may result in a haz- ardous condition. Installer should discuss contents of the User’s Information Manual (Publication VHS-UIM) with the owner.

A trained and qualified service technician should perform the inspections listed in these instructions before each heating season and at regular intervals.

1.General Maintenance

A.Boiler control check. See “Safety Check” on Page 20.

B.Venting system inspection

1.Check for obstructions, condensation, corrosion and physical damage.

2.If the boiler is vented horizontally through the wall, the outside termination and screen should be checked for any debris blocking the opening and cleaned as required.

Figure 21.

21

Image 21
Contents Victory 485 Victory II VHS ModelsSafety Installation RequirementsNatural GAS-FIRED Boiler Location Liquefied Petroleum L.P. Propane GAS-FIRED Boiler LocationBoiler Room AIR Supply and Ventilation Flue GAS Venting RequirementsApproved Venting Applications Category II and III Venting Heat-Fab Saf-T Vent System Victory II Horizontal Sidewall Venting Victory II VHS Models Victory II VHS Models Venting Requirements Vent Connector MaterialMasonry Vitreous Tile-Lined Chimney not metal lined Connector RequirementsAdditional National Fuel Gas Code Boiler Gas Appliance Type B Venting and Metal-Lined Masonry ChimneyVictory II VHS Models Victory II VHS Models Electrical Wiring Venting System Regular InspectionGAS Piping Supply and Return Water PipingCirculating Systems Air Control SystemVictory II VHS Models Piping Arrangement Operating INSTRUCTIONS, Basic Operating Instructions Safety InformationVictory II VHS Models Gas Rate Table Safety CheckCare and Maintenance Inspection During Heating Season Annual Inspection and CleaningVictory II Boiler Sequence of Operations Burners Fail to Operate Cause Remedy Burners will not SHUT-OFF Cause RemedyFlash BACK-BURNING AT Orifices Cause Remedy Not Enough Heat Cause Remedy Delayed Ignition Cause RemedyFumes and GAS Odors Cause Remedy Burner Short Cycles Cause RemedyAppendix a SLANT/FIN CORPORATION, Greenvale, N.Y Phone 516