Slant/Fin VHS-30, VHS-180 installation instructions Victory II VHS Models

Page 8

VICTORY II VHS Models

Figure 7.

8

Image 8
Contents Victory Victory II VHS Models 485Installation Requirements SafetyNatural GAS-FIRED Boiler Location Liquefied Petroleum L.P. Propane GAS-FIRED Boiler LocationApproved Venting Applications Boiler Room AIR Supply and VentilationFlue GAS Venting Requirements Category II and III Venting Heat-Fab Saf-T Vent System Victory II Horizontal Sidewall Venting Victory II VHS Models Victory II VHS Models Vent Connector Material Venting RequirementsConnector Requirements Masonry Vitreous Tile-Lined Chimney not metal linedAdditional National Fuel Gas Code Boiler Gas Appliance Type B Venting and Metal-Lined Masonry ChimneyVictory II VHS Models Victory II VHS Models GAS Piping Electrical WiringVenting System Regular Inspection Water Piping Supply and ReturnCirculating Systems Air Control SystemVictory II VHS Models Piping Arrangement Operating INSTRUCTIONS, Basic Safety Information Operating InstructionsSafety Check Victory II VHS Models Gas Rate TableCare and Maintenance Annual Inspection and Cleaning Inspection During Heating SeasonVictory II Boiler Sequence of Operations Flash BACK-BURNING AT Orifices Cause Remedy Burners Fail to Operate Cause RemedyBurners will not SHUT-OFF Cause Remedy Delayed Ignition Cause Remedy Not Enough Heat Cause RemedyFumes and GAS Odors Cause Remedy Burner Short Cycles Cause RemedyAppendix a SLANT/FIN CORPORATION, Greenvale, N.Y Phone 516