Slant/Fin VHS-180, VHS-30 installation instructions Piping Arrangement

Page 17

VICTORY II VHS Models

Figure 14.

Figure 15. Piping Arrangement

17

Image 17
Contents Victory 485 Victory II VHS ModelsSafety Installation RequirementsNatural GAS-FIRED Boiler Location Liquefied Petroleum L.P. Propane GAS-FIRED Boiler LocationApproved Venting Applications Boiler Room AIR Supply and VentilationFlue GAS Venting Requirements Category II and III Venting Heat-Fab Saf-T Vent System Victory II Horizontal Sidewall Venting Victory II VHS Models Victory II VHS Models Venting Requirements Vent Connector MaterialMasonry Vitreous Tile-Lined Chimney not metal lined Connector RequirementsAdditional National Fuel Gas Code Boiler Gas Appliance Type B Venting and Metal-Lined Masonry ChimneyVictory II VHS Models Victory II VHS Models GAS Piping Electrical Wiring Venting System Regular Inspection Supply and Return Water PipingCirculating Systems Air Control SystemVictory II VHS Models Piping Arrangement Operating INSTRUCTIONS, Basic Operating Instructions Safety InformationVictory II VHS Models Gas Rate Table Safety CheckCare and Maintenance Inspection During Heating Season Annual Inspection and CleaningVictory II Boiler Sequence of Operations Flash BACK-BURNING AT Orifices Cause Remedy Burners Fail to Operate Cause RemedyBurners will not SHUT-OFF Cause Remedy Not Enough Heat Cause Remedy Delayed Ignition Cause RemedyFumes and GAS Odors Cause Remedy Burner Short Cycles Cause RemedyAppendix a SLANT/FIN CORPORATION, Greenvale, N.Y Phone 516