Slant/Fin
VHS-180, VHS-30
installation instructions
SLANT/FIN CORPORATION, Greenvale, N.Y Phone 516
Install
Delayed Ignition Cause Remedy
Electrical Wiring
Maintenance
Vent Connector Material
Annual Inspection and Cleaning
Safety
Page 27
SLANT/FIN CORPORATION, Greenvale, N.Y. 11548 • Phone: (516)
484-2600
FAX: (516)
484-5921
•
Canada: Slant/Fin
LTD/LTEE
, Mississauga, Ontario
www.slantfin.com
Page 26
Page 27
Image 27
Page 26
Page 27
Contents
Victory
485
Victory II VHS Models
Liquefied Petroleum L.P. Propane GAS-FIRED Boiler Location
Installation Requirements
Safety
Natural GAS-FIRED Boiler Location
Boiler Room AIR Supply and Ventilation
Flue GAS Venting Requirements
Approved Venting Applications
Category II and III Venting
Heat-Fab Saf-T Vent System
Victory II Horizontal Sidewall Venting
Victory II VHS Models
Victory II VHS Models
Venting Requirements
Vent Connector Material
Type B Venting and Metal-Lined Masonry Chimney
Connector Requirements
Masonry Vitreous Tile-Lined Chimney not metal lined
Additional National Fuel Gas Code Boiler Gas Appliance
Victory II VHS Models
Victory II VHS Models
Electrical Wiring
Venting System Regular Inspection
GAS Piping
Air Control System
Water Piping
Supply and Return
Circulating Systems
Victory II VHS Models
Piping Arrangement
Operating INSTRUCTIONS, Basic
Operating Instructions
Safety Information
Victory II VHS Models Gas Rate Table
Safety Check
Care and Maintenance
Inspection During Heating Season
Annual Inspection and Cleaning
Victory II Boiler Sequence of Operations
Burners Fail to Operate Cause Remedy
Burners will not SHUT-OFF Cause Remedy
Flash BACK-BURNING AT Orifices Cause Remedy
Burner Short Cycles Cause Remedy
Delayed Ignition Cause Remedy
Not Enough Heat Cause Remedy
Fumes and GAS Odors Cause Remedy
Appendix a
SLANT/FIN CORPORATION, Greenvale, N.Y Phone 516
Top
Page
Image
Contents