Slant/Fin VHS-180, VHS-30 installation instructions Victory II Boiler Sequence of Operations

Page 23

VICTORY II VHS Models

Victory II Boiler Sequence of Operations

THERMOSTAT CALLS FOR HEAT

 

 

 

 

CIRCULATOR ON

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NO

BOILER WATER TEMPERATURE

 

IS BELOW HIGH LIMIT SETTING?

 

 

 

 

 

 

 

 

 

 

 

 

YES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INDUCER (AIR BLOWER) ON

 

 

 

 

 

 

 

AIR PROVING SWITCH

NO

PROVED CLOSED?

 

 

 

YES

 

 

 

 

 

IGNITION SPARK STARTS AND PILOT

VALVE OPERATOR OPENS

CIRCULATOR

CONTINUES TO

RUN

PROPANE GAS-S8600H

IGNITION SPARK CON- TINUES FOR APPROXI- MATELY 90 SECONDS. IF PILOT FLAME NOT ESTABLISHED, SYSTEM LOCKS OUT; SYSTEM MUST BE MANUALLY RESET.

NO

PILOT FLAME ESTABLISHED?

NO

 

 

 

 

 

 

 

 

 

 

 

 

YES

 

 

 

 

 

 

 

SPARK GENERATOR OFF.

MAIN VALVE OPENS. MODULE

MONITORS PILOT FLAME

THERMOSTAT CALLS FOR

HEAT ENDS

CIRCULATOR OFF.

PILOT AND MAIN VALVE CLOSE.

INDUCER OFF

WAIT FOR NEXT CALL FOR HEAT

NATURAL GAS-S8600F

IGNITION SPARK CONTINUES. PILOT VALVE REMAINS OPEN UNTIL SYSTEM IS RESET.

23

Image 23
Contents Victory 485 Victory II VHS ModelsLiquefied Petroleum L.P. Propane GAS-FIRED Boiler Location Installation RequirementsSafety Natural GAS-FIRED Boiler LocationApproved Venting Applications Boiler Room AIR Supply and VentilationFlue GAS Venting Requirements Category II and III Venting Heat-Fab Saf-T Vent System Victory II Horizontal Sidewall Venting Victory II VHS Models Victory II VHS Models Venting Requirements Vent Connector MaterialType B Venting and Metal-Lined Masonry Chimney Connector RequirementsMasonry Vitreous Tile-Lined Chimney not metal lined Additional National Fuel Gas Code Boiler Gas ApplianceVictory II VHS Models Victory II VHS Models GAS Piping Electrical WiringVenting System Regular Inspection Air Control System Water PipingSupply and Return Circulating SystemsVictory II VHS Models Piping Arrangement Operating INSTRUCTIONS, Basic Operating Instructions Safety Information Victory II VHS Models Gas Rate Table Safety CheckCare and Maintenance Inspection During Heating Season Annual Inspection and CleaningVictory II Boiler Sequence of Operations Flash BACK-BURNING AT Orifices Cause Remedy Burners Fail to Operate Cause RemedyBurners will not SHUT-OFF Cause Remedy Burner Short Cycles Cause Remedy Delayed Ignition Cause RemedyNot Enough Heat Cause Remedy Fumes and GAS Odors Cause RemedyAppendix a SLANT/FIN CORPORATION, Greenvale, N.Y Phone 516