Fig. 15
3.Engage union nut on manifold pipe of the broiler with the male fitting on the next unit, and draw up union
4.Continue to level up and connect manifold pipe until all broilers in the battery are connected, then tighten all manifold unions
Questions or concerns regarding the installation procedures may be addressed by calling the
– 8 –