Vulcan-Hart VL2GPS, VL3GMS, VL2GMS, VL3GAS, VL2GAS, VL2GSS, VL3GSS Water Refill After Initial Fill

Page 47

VL SERIES STEAMER - ELECTRICAL OPERATION

F.Once compartment temperature reaches approximately 180°F thermal switch closes and supplies power L1 (HOT) to:

1)Steam exhaust solenoid valve (N.O.) energized and closes.

NOTE: Even though steam exhaust solenoid valve is closed, a small opening exists in the “guillotine” blade of the valve to allow “limited free venting” of condensate during a cook cycle.

2)Pilot light (red) comes on indicating timed cooking at 180°F has started.

3)Timer motor energized

2.Cooking Timer times down to approximately one minute before zero.

A.Micro switch SW2 contacts change state from N.O. back to N.C. (normal starting position).

1)Steam exhaust solenoid valve is de- energized and opens to exhaust steam and pressure from the compartment.

2)Steam control solenoid (trip) is energized and unlatches steam control arm allowing it to return to the rear. Steam supply the compartment is shut off.

3.Cooking timer reaches zero.

A.Micro switch SW1 contacts change state from N.O. back to N.C. (normal starting position).

B.Buzzer is energized.

4.Cooking timer is manually turned off.

5.Compartment power switch is turned OFF, buzzer is de-energized and power is removed from the common side of micro switch SW1.

6.Steamer reverts to preheat cycle until:

A.A cooking cycle is started. i.e. compartment door is closed and screw handle tightened down, time is dialed into timer (past 5 minutes) and the compartment power switch is turned ON.

B.Water level drops below low level cut-off probes.

C.Power switch is turned OFF.

NOTE: Heating elements will come back on, after the boiler pressure drops below the low pressure set point limit (9 psi) and will stay on until the high pressure set point (11 psi) is reached. As long as steam pressure is within limits, even while cooking, heating elements can go off. The boiler is able to re- pressurize to the upper set point limit even with all compartments in cook mode.

WATER REFILL (AFTER INITIAL FILL)

1.Water level drops below low level probe (LL).

A.Power is removed from terminal 7 on the differential water level control.

1)The internal contactor coil is de- energized returning contacts 3 and 4 back to there original state and energizing the boiler fill solenoid to refill the boiler.

2.Water reaches LL (low level) probe.

A.Power to terminal 2 on the water level control is present but no switching occurs.

3.Water reaches HL (high level) probe.

A.Power to terminal 10 on the differential level control.

1)The internal contactor coil on the differential level controls is energized.

a.The normally closed contacts on terminals 3 and 4 open, de- energizing the boiler fill solenoid and the boiler stops filling.

NOTE: The internal contactor coil has a locking path through contacts on terminals 7 & 8 to the low level probe to keep the coil energized after the water level drops below the high level probe.

4.The water refill cycle will occur whenever the water level is below the low level probe and will not affect the operation of either the preheat or cook cycle.

BOILER BLOWDOWN/DRAIN

1.Main power switch turned OFF.

A.Power switch indicator light (red) goes out and power is removed form all boiler controls except the blowdown timer.

2.Blowdown timer switch is pressed.

A.The normally open timer contacts close, energizing the blowdown solenoid valve and the cold water condenser valve.

B.Boiler begins blowing down and draining until timer “times out” after approximately 4 minutes.

C.Timer contacts re-open and power is then removed from the blowdown solenoid valve and the cold water condenser valve.

Page 47 of 88

Image 47
Contents VL Boiler Base Series Convection Steamers Table of Contents VL Series Steamers Water Conditioning IntroductionTools SpecificationsElectric Steamers Gas SteamersSteamer Operation Gas Powered Steam BoilerElectrically Powered Steam Boiler Regenerated Steam Powered BoilerManual blowdown Direct Steam Powered CookerBoiler Blowdown and Steamer Shut off Automatic blowdownStandard Automatic Prevent Power Switch Water Level Gauge AssemblyCycling Pressure Switch High Limit Pressure SwitchCheck Valve Handhole Cover AssemblyDelime Port Assembly Boiler Pressure GaugeCooking Light Red Compartment Power SwitchCooking Timer Thermal Switch Load CompensatorRemoval and Replacement of Parts VL Series Steamers Removal and Replacement of Parts Cooking Compartment Controls Component Configurations Electro Mechanical Water Level Gauge AssemblyWater Level Controls LOW Level CUT OFF and Differential Solid StateBoiler Assembly High Limit Thermostat Boiler Fill and Cold Water Condenser Solenoid Valves GAS Combination Control ValveDoor and Bushing Compartment Gasket and Door Screw NUT, Door and BushingsGasket Door Screw NutHeating Elements Heater ContactorsSteam Coil Inspection Clean-Out All Boiler ModelsBoiler Deliming Only Models with Deliming Port Assembly Electro Mechanical Low level Cut-Off & Differential Control Water Level Controls TestSolid State Low level Cut-Off & Differential Control Water Level Probes Fill and Cold Water Solenoid Valves Compartment Pressure AdjustmentDisassembly Boiler Blowdown Drain Solenoid Valve Boiler not Filling with WaterAll Models With Boiler Boiler Slow to PressurizeNewer Models Older ModelsRegenerated Steam Coil Steamers Inlet Water StrainerElectric Models Direct Steam ModelsVL Series Steamer Service Procedures and Adjustments Automatic Ignition Systems GAS Models Air Shutter AdjustmentGAS Burners Spark Ignition Control Test TerminalsGAS Manifold Pressure Adjustment Regenerated Steam Older Models Heater Contactors Direct Steam ModelsVL Series Steamer Service Procedures and Adjustments Thermal Switch Prevent Automatic Models Steam Gate Valves Water Level Controls Electrical OperationSolid State Auxiliary Low Level Cut-Off Electro Mechanical Low level Cut-Off & Differential Control Electro Mechanical Auxiliary Low Level Cut-Off Initial Fill and Preheat Sequence of OperationVL Series Steamer Electrical Operation Water Refill After Initial Fill Cook CycleBoiler Blowdown/drain Electric ModelsCook Cycle Water Refill After Initial Fill Purposely Left Blank Manual Ignition, Standard Controls Electronic Ignition, Standard Controls Manual Ignition, CSD-1 Code Controls Electronic Ignition, CSD-1 Code Controls VL Series Steamer Electrical Operation Manual Ignition, Standard Controls VL Series Steamer Electrical Operation Electronic Ignition, Standard Controls VL Series Steamer Electrical Operation Manual Ignition, CSD-1 Code Controls VL Series Steamer Electrical Operation Electronic Ignition, CSD-1 Code Controls VL Series Steamer Electrical Operation Auto Blowdown, Standard Controls Auto Blowdown, Cal-Code Controls Auto Blowdown, Standard Controls contactor 1 std VL Series Steamer Electrical Operation Auto Blowdown, Standard Controls contactors 2 std VL Series Steamer Electrical Operation Manual Blowdown, Cal-Code Controls contactors 1 std aux VL Series Steamer Electrical Operation Auto Blowdown, Cal-Code Controls contactors 1 std aux VL Series Steamer Electrical Operation Auto Blowdown, Cal-Code Controls contactors 2 std aux VL Series Steamer Electrical Operation Manual Blowdown, Cal-Code Controls contactors 2 std aux VL Series Steamer Electrical Operation Standard and Cal-Code/CSD-1 Controls See Schematic and Wiring Diagrams Compartment Controls Manual Blowdown Older Models Auto Blowdown Older Models Schematic and Wiring Diagrams Compartment Controls Automatic Standard Manual ALL Models TroubleshootingContacts not closing to power boiler fill solenoid Schematic and Wiring Diagrams GAS Models only Symptom Possible CausesPilot not adjusted correctly. See Pilot

VL2GPS, VL3GPS, VL3GSS, VL2GSS, VL2GAS specifications

Vulcan-Hart is well-known in the commercial cooking equipment industry, providing durable and efficient products that cater to the needs of restaurants and foodservice operations. Their line of griddles, namely the VL3GAS, VL3GPS, VL3GMS, VL2GAS, and VL2GPS, showcases their commitment to high-quality performance and innovative cooking technologies.

The Vulcan-Hart VL3GAS is a gas griddle, featuring a robust stainless steel construction that ensures longevity and resilience in a bustling kitchen environment. It offers a smooth, hot cooking surface that allows for optimal heat retention and distribution, ensuring that food cooks evenly. With a 3/4-inch thick steel plate, it provides excellent thermal conductivity, making it ideal for high-volume cooking. This model is designed with easy-to-use controls, which makes it convenient for chefs to operate.

The VL3GPS model is a gas-powered griddle that comes equipped with a patented grease management system, which aids in maintaining a cleaner cooking environment. This system helps to separate grease from food and minimizes flare-ups, enhancing safety during cooking. Additionally, the griddle features a temperature control that allows chefs to set precise cooking temperatures, ensuring consistent results.

Moving to the VL3GMS, this model introduces increased versatility with its combination of gas and optional electric features. It’s tailored for establishments that require flexibility in their cooking strategies. The VL3GMS is also designed with a spacious cooking surface, making it suitable for preparing a wide array of dishes simultaneously.

The VL2GAS is a two-burner gas griddle that is specifically tailored for smaller kitchen operations or those with limited space. Its compact design does not compromise on performance, still providing a durable cooking surface and reliable temperature control. This model is ideal for smaller cafes or food trucks where space is at a premium.

Lastly, the VL2GPS complements the VL2GAS with its grease management system. This enhances hygiene and ensures that cooking remains efficient and safe. Both VL2 models offer easy startup and shutdown procedures, making them user-friendly for chefs working in fast-paced environments.

Overall, the Vulcan-Hart VL series griddles combine quality construction, innovative technology, and efficient design. Whether it’s the three-burner or two-burner options, these griddles meet the demands of commercial kitchens, providing reliable cooking solutions that serve the dynamic needs of the foodservice industry.