Samsung AR30HPFUAWKNMG, AR36HCFUAWKNMG manual Extend the assembly cable if necessary, Installation

Page 29

1. Extend the assembly cable if necessary.

• Do not connect two or more different cables to extend the length. It may cause fire.

2 . Open the front grille.

3 . Remove the screw securing the connector cover.

4 . Pass the assembly cable through the rear of the indoor unit and connect the assembly cable to terminals. (Refer to the picture below)

• Each wire is labeled with the corresponding terminal number.

5 . Pass the other end of the cable through the 65mm hole in the wall.

6 . Close the connector cover by tightening the screw carefully.

7 . Close the front grille.

8 . Remove the terminal board cover on the side of the outdoor unit. 9. Connect the cables to the terminals as seen in the picture.

• Each wire is labeled with the corresponding terminal number.

Indoor unit

AR HP

 

 

AR HC

 

 

 

 

 

 

 

 

 

 

Indoor unit

N1

L1

1

2

3

4

 

Indoor unit

N1

L1

1

2

3

4

 

 

Ground wire

N1

L1

1

2

 

4

 

Ground wire

N1

L1

1

 

 

 

 

 

(Green/Yellow)

 

 

 

 

 

 

 

(Green/Yellow)

 

 

 

 

 

 

 

 

Ground wire

N1

L1

1

2

 

4

 

Ground wire

N1

L1

1

 

 

 

 

Outdoor unit

(Green/Yellow)

 

 

 

 

 

 

 

(Green/Yellow)

 

 

 

 

 

 

 

 

N1

L1

1

2

3

4 N

L

 

N1

L1

1

2

3

4 N

L

 

 

 

 

 

 

 

N

L

 

 

 

 

 

 

N

L

 

Outdoor unit

 

 

 

Circuit Breaker

Outdoor unit

 

Circuit Breaker

 

 

 

 

 

 

 

 

 

 

 

 

(main power)

 

 

(main power)

• End of the wire must be circular.

• After connecting the cables, make sure terminal numbers on the indoor/outdoor unit matches.

• Screws on terminal block must not be unscrewed with the torque less than 12kgf•cm.

10. Connect the grounding conductor to the grounding terminals.

11. Close the terminal board cover by tightening the screw carefully.

• In Russia and Europe, consult with the supply authority to determine the supply system impedance before

installation.

• Connect the wires firmly so that wires can not be pulled out easily. (If they are loose, it could cause burn-out of the wires.)

• Connect the wires according to color codes, referring to the wiring diagram.

• The power cable and the interconnection cable should be selected according to the specification in page 30.

Power Wiring and Communication Wiring Configuration

• Be sure to run the power supply cable and the communication cable through electrical conduit as seen in the picture.

• Install the communication cable, indoor power cable and the main power cable in the cable tube.

• Secure the cable tube to the outdoor knockout using the CD connector and bushing.

• Arrange the cables as shown in the picture.

• The diameter of the 6 knock-out holes is Ø27.8 mm(Ø1-3/32 inch).

ENGLISH

Communication cable

Main power cable

(Inside)

(Outside)

29

SSEC_UMG_IB&IM_DB68-04508A_EN.indd 29

2014-2-10 14:57:00

Image 29
Contents English Contents Important safety symbols and precautions SafetAA y precautionsFollow directions Wall socketFor Using For Cleaning Operation ranges ChecAA king before useDisplay ChecAA king the name of the partsMain parts Remote controller buttons ChecAA king the remote controllerBattery changing time Remote controller displayStoring the remote controller Inserting the batteriesBasicAA function Press the button to set the desired fan speed Press the button to adjust the temperaturePress the Air swing button on the remote controller Using the Turbo functionAdjusA ting the air flow direction Vertical air flowPress the button on the remote controller AA modePress the Time Up or Time Down button to set the time Press the Set button to active it onPress the On Timer/Off Timer button SettinAA g the On/Off timerAdditional options available in On timer mode You can select from Auto/Cool/Dry/Fan/Heat ARHPmodelFrom the moment you have set the timer Using the Smart Saver functionIf the air conditioner is on If the air conditioner is off Turn off automaticallyWhen the air conditioner is turned on UsingAA the Auto Clean functionUsing the Quiet function Cleaning the outdoor unit heat exchanger Cleaning the indoor unitOpening the panel Heat exchangerCleaning the air filter CleanAA ing the air conditionerRemoving the Air filter Open the panel and put the Air filter outPeriodical checks MaintAA aining the air conditionerTroubAA leshooting Connection Flow movement changes. It is normalGeneral information Safety precautionsInstalling the unit Choosing the installation locationPower supply line, fuse or circuit breaker  a place where the air filter can be replaced easilyOutdoor Unit ChooAA sing the installation locationWhere sulfide gas exists When the air outlet is towards the wall When installing more than 1 outdoor unit Figure Description Top view Side view Accessories in the outdoor unit case Accessories Accessories in the indoor unit case Optional accessories Fixing the installation plateTools required for installation General Tools Tools for test operationsConnecting the cable Connecting the assembly cableCable specification Installation Extend the assembly cable if necessaryEach wire is labeled with the corresponding terminal number Cut off the remaining foam insulation Smooth the cut edgesCutting or extending the pipe AAPurging the indoor unitUnscrew the caps at the end of each pipe Put a flare nut slightly into the pipe and modify the flareOuter Diameter CuttingAA or extending the pipeTwo hoses are firmly connected, there is no water leakage Drain hose installationHose tight Check for leakage on both side of the drain outletARHPseries Purging the connected pipesAdd refrigerant charge according to table below Adding Refrigerant30g of refrigerant R-22 must be added for each extra meter If you use a pipe shorter than 4 mFixing the indoor unit in place PerfoAA rming the gas leak testsAppropriate support wall or ground Outdoor unit installed on the wall by rackFixing the outdoor unit in place Press the Power button to stop the operation Press the Power button and check the followingFinalAA Check and Trial Operation Check the followingsInsulation tape to finish Apply heat to the contraction tube to contract itAfter tube contraction work is completed, wrap it with AR30HCFUAWK/MG AR36HCFUAWK/MG TechnAA ical SpecificationsEnglish Egypt Questions or COMMENTS?Air Conditioner
Related manuals
Manual 43 pages 5.33 Kb