3Open the valve of the low pressure side of manifold gauge anticlockwise.
4Evacuate the air in the connected pipes using the vacuum pump for about 15 minutes.
•Make sure that pressure gauge shows
•Close the valve of the low pressure side of manifold gauge clockwise.
•Turn off the vacuum pump.
•Check for 2 minutes if there is any pressure change.
•Remove the hose of the low pressure side of manifold gauge.
5Set a valve cork of liquid and gas service port to the open position.
Step 3.4 Adding refrigerant
If you use a pipe longer than the length specified in the piping codes and standards, you must add 15g of refrigerant
Refer to the Service Manual for further details.
CAUTION
•The remaining air in the Refrigeration cycle, which contains moisture, may cause malfunction on the compressor.
•Always contact the service centre or a professional installation agency for product installation.
Before recharging, check whether the cylinder has a siphon or not. There are two ways to recharge the
refrigerant:
|
| Siphon |
|
|
|
|
| ||
|
|
|
| |
|
|
| ||
|
|
|
|
|
Charge the refrigerant | Charge the refrigerant turning | |||
standing the cylinder upright. | the cylinder upside down. | |||
<Cylinder with siphon> | <Cylinder without siphon> |
NOTE
•If
•During the measuring operation of refrigerant quantity added use electronic scales. If cylinder doesn't have siphon, upset it.
Installation
English 43