Heatiator NNXT4236IL NNXT3933I Termination Locations, Vent Termination Minimum Clearances

Page 22

6 Termination Locations

A. Vent Termination Minimum Clearances

WARNING

Fire Risk.

Maintain vent clearance to combustibles as specified.

DO NOT pack air space with insulation or other materials.

Failure to keep insulation or other materials away from vent pipe may cause overheating and fire.

A

B

6 in. (minimum) up to 20 in.

18 in. minimum

152 mm/508 mm

457 mm

20 in. and over

0 in. minimum

Gas, Wood or Fuel Oil

Termination Cap

24 in. min.

(610 mm)

Termination

Cap

 

 

 

 

Horizontal

 

20 in.

 

 

overhang

 

 

 

 

 

 

 

 

 

 

(508 mm)

Vertical

Lowest

wall

Discharge

 

Opening

 

B

A *

Gas

Termination

Cap **

Storm Collar

 

 

12

X

 

 

 

 

 

 

 

 

 

 

 

 

 

Roof

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Flashing

 

 

 

 

 

Roof Pitch

 

 

 

 

 

 

 

 

 

 

 

 

 

is X / 12

 

 

 

 

H (min.) - Minimum height

 

 

 

 

from roof to lowest

 

 

 

 

 

discharge opening.

 

 

Roof Pitch

H (Min.) Ft.

 

Roof Pitch

H (Min.) Ft.

Flat to 6/12

 

1.0*

 

Over 11/12 to 12/12

4.0

Over 6/12 to 7/12

1.25*

 

Over 12/12 to 14/12

5.0

Over 7/12 to 8/12

1.5*

 

Over 14/12 to 16/12

6.0

Over 8/12 to 9/12

2.0*

 

Over 16/12 to 18/12

7.0

Over 9/12 to 10/12

2.5

 

Over 18/12 to 20/12

7.5

Over 10/12 to 11/12

3.25

 

Over 20/12 to 21/12

8.0

 

* 3 ft. minimum in snow regions

 

 

*If using decorative cap cover(s), this distance may need to be increased. Refer to the installation instructions supplied with the decorative cap cover.

**In a staggered installation with both gas and wood or fuel oil terminations, the wood or fuel oil termination cap must be higher than the gas termination cap.

Figure 6.2 Multiple Termination Caps

Figure 6.1 Minimum Height From Roof To Lowest Discharge Opening

22

Heatilator • Novus NNXT • 4055-879 • Rev. o • 2/12

Image 22
Contents Installation and Operation ModelsCongratulations Homeowner Reference InformationTable of Contents Finishing Limited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Operating Instructions Gas Fireplace SafetyYour Fireplace Fan Kit optional Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Clear SpaceControl Module Operation IPI Battery Tray/Battery InstallationBefore Lighting Fireplace Lighting Instructions IPI Final inspection byInitial Break-in Procedure Frequently Asked QuestionsAfter Fireplace is Lit Maintenance and Service Maintenance Tasks-HomeownerMaintenance Tasks-Qualified Service Technician Getting Started Typical Appliance SystemTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Framing and Clearances Select Appliance LocationConstruct the Appliance Chase Clearances In. to Level of StandoffsMantels Mantel and Wall ProjectionsMantel Legs or Wall Projections Termination Locations Vent Termination Minimum ClearancesMinimum Clearances for Termination Vent Table Key Vent Information and DiagramsApproved Pipe Use of ElbowsTop Vent Horizontal Termination Vent DiagramsOne Elbow Two 45 Elbows replacing One 90 Elbow Two ElbowsNo Elbow Top Vent Vertical TerminationThree Elbows TionsLower & twist pull out 12 ft 3.66 m min 60 ft 18.29 m max 12 ft 3.66 m min ft 18.29 m max Rear Vent Horizontal Termination One 45 ElbowInstalled Horizontally Rear Vent Vertical Termination Min Ft 1.83 m max 12 ft 3.66 m min Wall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationInstall the Ceiling Firestop Ceiling firestop Must be used between floors and atticsFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Appliance Preparation Top VentRear Vent It Cannot be changed at a later time BasketSecure and Level the Appliance 11 Proper Positioning and Securing of an ApplianceAssemble Vent Sections DVP Only Install Vent PipeAttach Pipe to the Firebox Assembly Assemble Pipe SectionsAssemble Vent Sections SLP Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Decorative Ceiling Components SLP only Install Metal Roof Flashing Assemble and Install Storm CollarInstall Decorative Wall Components SLP only Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap Failure to maintain overlap may cause overheating and fireField Constructed Shrouds ShroudsHHT Shrouds Open Top Shroud may be used with DVP-TV, DVP-TVHW, SLP-TVHWMailbox Style Shroud Dimensions Min. Base Dims Gas Pressure Gas InformationFuel Conversion Gas ConnectionOptional Accessories Requirements Wiring RequirementsIntellifire Plus Ignition System Wiring Electrical InformationElectrical Service and Repair RC200 Wiring DiagramJunction Box Installation Wall Switch Installation for Fan OptionalRemote Control Installation & Operations RC200Installation of Remote Control Housing Programming the RC200 to the Control Module Power Outage Finishing Facing Material Do not RemoveAppliance Setup Place the Rockwool Clean the Appliance Assemble LogsAccessories Place the Lava RockReplacing Fixed Glass Assembly Air Shutter SettingInstall the Control Heat Shield Install HoodInstall Control Heat Shield Remove Screen ProtectorInstall Floor Cover Install the floor cover as shown in FigureClose the Screen Assembly Hang Screen on Shoulder ScrewsTroubleshooting Intellifire Plus Intermittent Ignition SystemIntellifire Plus Intermittent Pilot Ignition System Appliance Dimension Diagram Reference MaterialsVent Components Diagrams DVP45DVP-TRAPFL 229 mm DVP-TRAP DVP-HRC-SS  B. Vent Components Diagrams SLP Series Vent ComponentsSL-2DVP SLK-SNKD DVP-FBHT Service Parts Log Set AssemblyPart number list on following Stocked At DepotNNXT4236I, NNXT4236IL #16 Ignition Control Assembly #15 Valve AssemblyOptional Components Contact Information Do not Discard this Manual