1. Top Vent - Horizontal Termination - (continued)
Two 45° Elbows replacing One 90° Elbow
4 ft min.
(1.22 m)
17 ft max. |
(5.18 m) |
Figure 7.4
Two Elbows
H3
Installed
Horizontally
H2 H2
V1 min. | V1 max. | H1+H2 max. | H1+H2+H3 max. | |||||
ft |
| m | ft | m | ft | m | ft | m |
0.5 |
| 0.15 | - | - | 6 | 1.83 | - | - |
|
|
|
|
|
|
|
|
|
1 |
| 0.30 | - | - | 11 | 3.35 | 11 | 3.35 |
1.5 |
| 0.46 | - | - | 17 | 5.18 | 17 | 5.18 |
2 |
| 0.61 | - | - | 17 | 5.18 | 17 | 5.18 |
|
|
|
|
|
|
|
|
|
| DVP | 25 | 7.62 | 17 | 5.18 | 17 | 5.18 | |
| SLP | 23 | 7.01 | 17 | 5.18 | 17 | 5.18 |
Installed
Vertically
H1 | V1 |
Figure 7.5
26 | Heatilator • Novus NNXT • |