Heatiator NNXT3933IL, NNXT4236IL NNXT3933I owner manual SL-2DVP

Page 75

B. Vent Components Diagrams (continued)

Note: Heat shields MUST overlap by a minimum of 1-1/2 in. (38 mm). The heat shield is designed to be used on a wall 4 in. to 7-1/4 in. (102 mm to 184 mm) thick. If wall thickness is less than 4 in. (102 mm) the existing heat shields must be field trimmed. If wall thickness is greater than 7-1/4 in. (184 mm) a DVP-HSM-B will be required.

 

8 in.

 

 

 

 

(203 mm)

 

 

 

 

Heat

 

 

 

 

Shield

 

 

 

15-1/8 in.

 

 

 

 

(384 mm)

 

 

 

 

 

 

Term Cap

Minimum

Maximum

 

 

Effective Length

Effective Length

 

Max

 

12 in.

Trap1

3-1/8 in.

4-3/4 in.

Effective

79 mm

121 mm

(305 mm)

Length

 

 

5-1/4 in.

9-1/4 in.

 

SLP-TRAP

Trap2

 

133 mm

235 mm

Horizontal Termination Cap

 

 

 

 

6-11/16 in.

3-15/16 in.

 

 

 

(169 mm)

(101 mm)

 

 

 

3-15/16 in.

3-13/16 in.

 

 

 

(101 mm)

(97 mm)

 

 

 

8 in.

5-1/16 in.

 

8-1/8 in.

13 in.

(128 mm)

 

(203 mm)

 

(206 mm)

(330 mm)

 

 

SL-2DVP

 

 

 

Adapter

 

 

 

 

15 in.

 

 

 

 

(381 mm)

 

 

 

26 in.

 

 

 

 

660 mm

 

 

 

 

DVP-HSM-B

 

 

SLP-HRC-SS

 

Extended Heat Shield

 

 

 

 

 

 

 

 

Effective Length

5-1/2 in.

8-3/8 in.

 

 

5-3/4 to 8-3/8 in.

 

 

146 to 213 mm

140 mm

213 mm

 

14-7/16 in.

 

87°

 

 

 

 

 

 

 

 

367 mm

 

 

 

 

 

 

 

10-1/2 in.

 

 

 

 

267 mm

 

14-7/16 in.

2-5/16 in.

 

10-7/8 in.

 

 

276 mm

 

59 mm

 

 

367 mm

 

 

 

 

 

 

 

SLP-WT-BK

 

 

 

 

Wall Thimble-Black

 

 

SLP-HRC-ZC-SS

 

Figure 17.8 SLP Series Vent Components

 

 

 

 

Heatilator • Novus NNXT • 4055-879

• Rev. o •

2/12

75

Image 75
Contents Models Installation and OperationHomeowner Reference Information CongratulationsTable of Contents Finishing Limited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Gas Fireplace Safety Operating InstructionsYour Fireplace Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Fan Kit optionalIPI Battery Tray/Battery Installation Control Module OperationBefore Lighting Fireplace Final inspection by Lighting Instructions IPIFrequently Asked Questions Initial Break-in ProcedureAfter Fireplace is Lit Maintenance Tasks-Homeowner Maintenance and ServiceMaintenance Tasks-Qualified Service Technician Typical Appliance System Getting StartedDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Select Appliance Location Framing and ClearancesConstruct the Appliance Chase In. to Level of Standoffs ClearancesMantel and Wall Projections MantelsMantel Legs or Wall Projections Vent Termination Minimum Clearances Termination LocationsMinimum Clearances for Termination Use of Elbows Vent Information and DiagramsApproved Pipe Vent Table KeyVent Diagrams Top Vent Horizontal TerminationOne Elbow Two Elbows Two 45 Elbows replacing One 90 ElbowTions Top Vent Vertical TerminationThree Elbows No ElbowLower & twist pull out 12 ft 3.66 m min 60 ft 18.29 m max 12 ft 3.66 m min ft 18.29 m max One 45 Elbow Rear Vent Horizontal TerminationInstalled Horizontally Rear Vent Vertical Termination Min Ft 1.83 m max 12 ft 3.66 m min Combustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingCeiling firestop Must be used between floors and attics Install the Ceiling FirestopInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Top Vent Appliance PreparationIt Cannot be changed at a later time Basket Rear Vent11 Proper Positioning and Securing of an Appliance Secure and Level the ApplianceAssemble Pipe Sections Install Vent PipeAttach Pipe to the Firebox Assembly Assemble Vent Sections DVP OnlyAssemble Slip Sections Assemble Vent Sections SLP OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Assemble and Install Storm Collar Install Metal Roof FlashingInstall Vertical Termination Cap Install Decorative Wall Components SLP onlyHeat Shield Requirements for Horizontal Termination Failure to maintain overlap may cause overheating and fire Install Horizontal Termination CapOpen Top Shroud may be used with DVP-TV, DVP-TVHW, SLP-TVHW ShroudsHHT Shrouds Field Constructed ShroudsMailbox Style Shroud Dimensions Min. Base Dims Gas Connection Gas InformationFuel Conversion Gas PressureElectrical Information Wiring RequirementsIntellifire Plus Ignition System Wiring Optional Accessories RequirementsRC200 Wiring Diagram Electrical Service and RepairWall Switch Installation for Fan Optional Junction Box InstallationRC200 Remote Control Installation & OperationsInstallation of Remote Control Housing Programming the RC200 to the Control Module Power Outage Finishing Do not Remove Facing MaterialAppliance Setup Place the Lava Rock Clean the Appliance Assemble LogsAccessories Place the RockwoolAir Shutter Setting Replacing Fixed Glass AssemblyRemove Screen Protector Install HoodInstall Control Heat Shield Install the Control Heat ShieldInstall the floor cover as shown in Figure Install Floor CoverHang Screen on Shoulder Screws Close the Screen AssemblyIntellifire Plus Intermittent Ignition System TroubleshootingIntellifire Plus Intermittent Pilot Ignition System Reference Materials Appliance Dimension DiagramDVP45 Vent Components DiagramsDVP-TRAPFL 229 mm DVP-TRAP DVP-HRC-SS SLP Series Vent Components  B. Vent Components DiagramsSL-2DVP SLK-SNKD DVP-FBHT Log Set Assembly Service PartsPart number list on following At Depot StockedNNXT4236I, NNXT4236IL #15 Valve Assembly #16 Ignition Control AssemblyOptional Components Do not Discard this Manual Contact Information