Heatiator NNXT3933IL, NNXT4236IL NNXT3933I owner manual 229 mm

Page 71

B. Vent Components Diagrams (continued)

1-1/2 in.

(38 mm)

14in.

(356 mm)

7-3/8 in.

(187 mm)

17-3/4 in.

(451 mm)

 

9 in.

2-3/4 in.

(229 mm)

 

(70 mm)

 

 

11-1/2 in.

 

(280 mm)

 

12-1/4 in.

 

(311 mm)

 

16 in.

 

(406 mm)

12-1/2 in. (317 mm)

12 in.

(305 mm)

DVP-TB1

Basement Vent Cap

7-1/4 in.

(184 mm)

12-1/2 in.

(318 mm)

5-1/4 in.

(133 mm)

DVP-TVHW

Vertical Termination Cap (High wind)

16-7/8 in.

14 in.

(429 mm)

(356 mm)

12 in.

(305 mm)

7-1/8 in.

12-1/8 in.(181 mm)

(314 mm)

8-3/4 in.

(222 mm)

1-5/8 in.

(41 mm)

DVP-HPC

High Performance Cap

Figure 17.4 DVP Vent Components

PVK-80

(For use with IPI and DSI appliances only.)

3-7/8 in.

(98 mm)

10-1/2 in.

(267 mm)

DVP-TV

Vertical Termination Cap

7-1/4 in.

1 in. (184 mm)

(25 mm)

14 in.

(356 mm)

3/8 in. (10 mm) 1 in. (25 mm)

7-3/4 to 10-3/8 in.

(197 to 264 mm)

DVP-FBHT

Fire Brick Termination Cap

Heatilator • Novus NNXT • 4055-879 • Rev. o • 2/12

71

Image 71
Contents Models Installation and OperationHomeowner Reference Information CongratulationsTable of Contents Finishing Limited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Your Fireplace Gas Fireplace SafetyOperating Instructions Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Fan Kit optionalBefore Lighting Fireplace IPI Battery Tray/Battery InstallationControl Module Operation Final inspection by Lighting Instructions IPIAfter Fireplace is Lit Frequently Asked QuestionsInitial Break-in Procedure Maintenance Tasks-Homeowner Maintenance and ServiceMaintenance Tasks-Qualified Service Technician Typical Appliance System Getting StartedInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Select Appliance Location Framing and ClearancesConstruct the Appliance Chase In. to Level of Standoffs ClearancesMantel Legs or Wall Projections Mantel and Wall ProjectionsMantels Vent Termination Minimum Clearances Termination LocationsMinimum Clearances for Termination Use of Elbows Vent Information and DiagramsApproved Pipe Vent Table KeyOne Elbow Vent DiagramsTop Vent Horizontal Termination Two Elbows Two 45 Elbows replacing One 90 ElbowTions Top Vent Vertical TerminationThree Elbows No ElbowLower & twist pull out 12 ft 3.66 m min 60 ft 18.29 m max 12 ft 3.66 m min ft 18.29 m max One 45 Elbow Rear Vent Horizontal TerminationInstalled Horizontally Rear Vent Vertical Termination Min Ft 1.83 m max 12 ft 3.66 m min Combustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingCeiling firestop Must be used between floors and attics Install the Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Top Vent Appliance PreparationIt Cannot be changed at a later time Basket Rear Vent11 Proper Positioning and Securing of an Appliance Secure and Level the ApplianceAssemble Pipe Sections Install Vent PipeAttach Pipe to the Firebox Assembly Assemble Vent Sections DVP OnlyAssemble Slip Sections Assemble Vent Sections SLP OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Assemble and Install Storm Collar Install Metal Roof FlashingHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components SLP only Failure to maintain overlap may cause overheating and fire Install Horizontal Termination CapOpen Top Shroud may be used with DVP-TV, DVP-TVHW, SLP-TVHW ShroudsHHT Shrouds Field Constructed ShroudsMailbox Style Shroud Dimensions Min. Base Dims Gas Connection Gas InformationFuel Conversion Gas PressureElectrical Information Wiring RequirementsIntellifire Plus Ignition System Wiring Optional Accessories RequirementsRC200 Wiring Diagram Electrical Service and RepairWall Switch Installation for Fan Optional Junction Box InstallationRC200 Remote Control Installation & OperationsInstallation of Remote Control Housing Programming the RC200 to the Control Module Power Outage Finishing Do not Remove Facing MaterialAppliance Setup Place the Lava Rock Clean the Appliance Assemble LogsAccessories Place the RockwoolAir Shutter Setting Replacing Fixed Glass AssemblyRemove Screen Protector Install HoodInstall Control Heat Shield Install the Control Heat ShieldInstall the floor cover as shown in Figure Install Floor CoverHang Screen on Shoulder Screws Close the Screen AssemblyIntellifire Plus Intermittent Ignition System TroubleshootingIntellifire Plus Intermittent Pilot Ignition System Reference Materials Appliance Dimension DiagramDVP45 Vent Components DiagramsDVP-TRAPFL 229 mm DVP-TRAP DVP-HRC-SS SLP Series Vent Components  B. Vent Components DiagramsSL-2DVP SLK-SNKD DVP-FBHT Part number list on following Log Set AssemblyService Parts At Depot StockedNNXT4236I, NNXT4236IL #15 Valve Assembly #16 Ignition Control AssemblyOptional Components Do not Discard this Manual Contact Information