1. Top Vent - Horizontal Termination - (continued)
Three Elbows
H2
Figure 7.6
| V1 min. | V1 + V2 max. | H1+H2 max. | |||
| ft | m | ft | m | ft | m |
DVP | 1 | 0.30 | 24 | 7.32 | 17 | 5.18 |
SLP | 1 | 0.30 | 22 | 6.71 | 17 | 5.18 |
Installed
Vertically
V2
V1
H1
2. Top Vent - Vertical Termination
No Elbow | Install Top Vent Flue Visor - No Elbow Configura- |
| tions |
• Remove the refractory retainer from one side refractory.
12 ft (3.66 m) min.
60 ft (18.29 m) max.
Remove lower refractory retainer
Figure 7.7a Remove Refractory Retainer from one Side
Figure 7.7
Heatilator • Novus NNXT • | 27 |