Heatiator NNXT4236IL NNXT3933I Clean the Appliance Assemble Logs, Accessories, Place the Rockwool

Page 61

G. Clean the Appliance

L. Assemble Logs

Clean/vacuum any sawdust that may have accumulated

• Base logs have been permanently mounted on the

inside the firebox or underneath in the control cavity.

burner pan/hearth sheet and should not be moved.

H. Accessories

Install approved accessories per instructions included with the accessories. Refer to Section 17.

WARNING! Rick of Fire and Electric Shock! Use ONLY Hearth & Home Technologies-approved optional acces- sories with this appliance. Using non-listed accessories could result in a safety hazad and will void the warranty.

I. Place the Rockwool

WARNING! Risk of Explosion! Follow rockwool place- ment instructions. DO NOT place rockwool directly over burner ports. Replace rockwool material annually. Improp- erly placed rockwool interferes with proper burner opera- tion.

Rockwool is shipped with this gas appliance.

Place a small amount of 1/2 in. diameter pieces (dime- size) rockwool on the burner pan so that the rockwool touches, but does not cover, the holes in the burner pan (refer to Figure 15.5). This will provide the “glowing embers” look.

It is not necessary to use the entire bag. Save the remaining rockwool for future use.

J. Place the Lava Rock

See Figure 15.6.

Rockwool

Lava Rock &

Vermiculite

Figure 15.6 Placement of Rockwool, Lava Rock and Vermiculite

K. Place the Vermiculite

Sprinkle on top of lava rock.

Figure 15.7 Base Logs

Install the left middle log by aligning the hole in the bottom of the log with the pin on the left side of the left bottom log.

Figure 15.8 Install Left Middle Log

Install the left top log by aligning the slot in the bottom of the left top log with the left pin in the back log. The back of the top log should set on the back log with the tip resting on the left middle log.

Figure 15.9 Install Left Top Log

Heatilator • Novus NNXT • 4055-879 • Rev. o • 2/12

61

Image 61
Contents Models Installation and OperationHomeowner Reference Information CongratulationsTable of Contents Finishing Limited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Operating Instructions Gas Fireplace SafetyYour Fireplace Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyFan Kit optional Clear SpaceControl Module Operation IPI Battery Tray/Battery InstallationBefore Lighting Fireplace Final inspection by Lighting Instructions IPIInitial Break-in Procedure Frequently Asked QuestionsAfter Fireplace is Lit Maintenance Tasks-Homeowner Maintenance and ServiceMaintenance Tasks-Qualified Service Technician Typical Appliance System Getting StartedTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Select Appliance Location Framing and ClearancesConstruct the Appliance Chase In. to Level of Standoffs ClearancesMantels Mantel and Wall ProjectionsMantel Legs or Wall Projections Vent Termination Minimum Clearances Termination LocationsMinimum Clearances for Termination Approved Pipe Vent Information and DiagramsVent Table Key Use of ElbowsTop Vent Horizontal Termination Vent DiagramsOne Elbow Two Elbows Two 45 Elbows replacing One 90 ElbowThree Elbows Top Vent Vertical TerminationNo Elbow TionsLower & twist pull out 12 ft 3.66 m min 60 ft 18.29 m max 12 ft 3.66 m min ft 18.29 m max One 45 Elbow Rear Vent Horizontal TerminationInstalled Horizontally Rear Vent Vertical Termination Min Ft 1.83 m max 12 ft 3.66 m min Pipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationCeiling firestop Must be used between floors and attics Install the Ceiling FirestopFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Top Vent Appliance PreparationIt Cannot be changed at a later time Basket Rear Vent11 Proper Positioning and Securing of an Appliance Secure and Level the ApplianceAttach Pipe to the Firebox Assembly Install Vent PipeAssemble Vent Sections DVP Only Assemble Pipe SectionsAssemble Slip Sections Assemble Vent Sections SLP OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Assemble and Install Storm Collar Install Metal Roof FlashingInstall Decorative Wall Components SLP only Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination Failure to maintain overlap may cause overheating and fire Install Horizontal Termination CapHHT Shrouds ShroudsField Constructed Shrouds Open Top Shroud may be used with DVP-TV, DVP-TVHW, SLP-TVHWMailbox Style Shroud Dimensions Min. Base Dims Fuel Conversion Gas InformationGas Pressure Gas ConnectionIntellifire Plus Ignition System Wiring Wiring RequirementsOptional Accessories Requirements Electrical InformationRC200 Wiring Diagram Electrical Service and RepairWall Switch Installation for Fan Optional Junction Box InstallationRC200 Remote Control Installation & OperationsInstallation of Remote Control Housing Programming the RC200 to the Control Module Power Outage Finishing Do not Remove Facing MaterialAppliance Setup Accessories Clean the Appliance Assemble LogsPlace the Rockwool Place the Lava RockAir Shutter Setting Replacing Fixed Glass AssemblyInstall Control Heat Shield Install HoodInstall the Control Heat Shield Remove Screen ProtectorInstall the floor cover as shown in Figure Install Floor CoverHang Screen on Shoulder Screws Close the Screen AssemblyIntellifire Plus Intermittent Ignition System TroubleshootingIntellifire Plus Intermittent Pilot Ignition System Reference Materials Appliance Dimension DiagramDVP45 Vent Components DiagramsDVP-TRAPFL 229 mm DVP-TRAP DVP-HRC-SS SLP Series Vent Components  B. Vent Components DiagramsSL-2DVP SLK-SNKD DVP-FBHT Service Parts Log Set AssemblyPart number list on following At Depot StockedNNXT4236I, NNXT4236IL #15 Valve Assembly #16 Ignition Control AssemblyOptional Components Do not Discard this Manual Contact Information