Heatiator NNXT4236I, NNXT3933IL owner manual #16 Ignition Control Assembly, #15 Valve Assembly

Page 80

C. Service Parts

NNXT3933I, NNXT4236I

 

 

 

Beginning Manufacturing Date: Aug 2009

 

Ending Manufacturing Date: ______

#15 Valve Assembly

#16 Ignition Control Assembly

 

 

 

 

15.1

 

 

 

15.2

 

 

 

15.3

 

 

 

15.4

 

 

15.5

15.12

 

 

15.6

15.11

16.2

 

 

15.10

 

 

15.7

 

 

 

 

15.9

 

16.4

15.8

16.1

16.3

 

 

 

 

 

IMPORTANT: THIS IS DATED INFORMATION. When requesting service or replacement

 

Stocked

parts for your appliance please provide model number and serial number. All parts listed

 

in this manual may be ordered from an authorized dealer.

 

 

at Depot

ITEM

DESCRIPTION

COMMENTS

PART NUMBER

 

15.1

Pilot Shield

 

4055-889

 

15.2

Pilot Assembly NG

 

2090-012

Y

Pilot Assembly LP

 

2090-013

Y

 

 

15.3

Pilot Gasket

 

4021-042

 

15.4

Air Shutter Assembly

 

4055-202

Y

15.5

Valve Bracket

 

4055-205

 

15.6

Flex Ball Valve Assembly

 

302-320A

Y

15.7

Valve NG

 

2166-302

Y

Valve LP

 

2166-303

Y

 

 

15.8

Male Connector

Pkg of 5

303-315/5

Y

15.9

Transformer

 

2166-305

Y

15.10

Wire Harness

 

2166-304

Y

15.11

Gasket, Bulkhead

 

4021-429

 

15.12

Bulkhead W/Flex Tube

 

4021-512

Y

16

Igntion Control Assembly

 

4055-964

Y

16.1

Control Module

 

2166-307

Y

16.2

Control Plate

 

4055-899

 

16.3

AuxRC200

 

2166-325

Y

16.4

Battery Pack

 

2166-323

Y

 

Orifice NG (#39C)

 

582-839

Y

 

Orifice LP (#52C)

 

582-852

Y

80

Heatilator • Novus NNXT • 4055-879 • Rev. o • 2/12

Image 80
Contents Installation and Operation ModelsCongratulations Homeowner Reference InformationTable of Contents Finishing Limited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Your Fireplace Gas Fireplace SafetyOperating Instructions Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesFan Kit optional Clear SpaceBefore Lighting Fireplace IPI Battery Tray/Battery InstallationControl Module Operation Lighting Instructions IPI Final inspection byAfter Fireplace is Lit Frequently Asked QuestionsInitial Break-in Procedure Maintenance and Service Maintenance Tasks-HomeownerMaintenance Tasks-Qualified Service Technician Getting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Framing and Clearances Select Appliance LocationConstruct the Appliance Chase Clearances In. to Level of StandoffsMantel Legs or Wall Projections Mantel and Wall ProjectionsMantels Termination Locations Vent Termination Minimum ClearancesMinimum Clearances for Termination Vent Information and Diagrams Approved PipeVent Table Key Use of ElbowsOne Elbow Vent DiagramsTop Vent Horizontal Termination Two 45 Elbows replacing One 90 Elbow Two ElbowsTop Vent Vertical Termination Three ElbowsNo Elbow TionsLower & twist pull out 12 ft 3.66 m min 60 ft 18.29 m max 12 ft 3.66 m min ft 18.29 m max Rear Vent Horizontal Termination One 45 ElbowInstalled Horizontally Rear Vent Vertical Termination Min Ft 1.83 m max 12 ft 3.66 m min Vent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Ceiling firestop Must be used between floors and atticsVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Appliance Preparation Top VentRear Vent It Cannot be changed at a later time BasketSecure and Level the Appliance 11 Proper Positioning and Securing of an ApplianceInstall Vent Pipe Attach Pipe to the Firebox AssemblyAssemble Vent Sections DVP Only Assemble Pipe SectionsAssemble Vent Sections SLP Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Decorative Ceiling Components SLP only Install Metal Roof Flashing Assemble and Install Storm CollarHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components SLP only Install Horizontal Termination Cap Failure to maintain overlap may cause overheating and fireShrouds HHT ShroudsField Constructed Shrouds Open Top Shroud may be used with DVP-TV, DVP-TVHW, SLP-TVHWMailbox Style Shroud Dimensions Min. Base Dims Gas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements Intellifire Plus Ignition System WiringOptional Accessories Requirements Electrical InformationElectrical Service and Repair RC200 Wiring DiagramJunction Box Installation Wall Switch Installation for Fan OptionalRemote Control Installation & Operations RC200Installation of Remote Control Housing Programming the RC200 to the Control Module Power Outage Finishing Facing Material Do not RemoveAppliance Setup Clean the Appliance Assemble Logs AccessoriesPlace the Rockwool Place the Lava RockReplacing Fixed Glass Assembly Air Shutter SettingInstall Hood Install Control Heat ShieldInstall the Control Heat Shield Remove Screen ProtectorInstall Floor Cover Install the floor cover as shown in FigureClose the Screen Assembly Hang Screen on Shoulder ScrewsTroubleshooting Intellifire Plus Intermittent Ignition SystemIntellifire Plus Intermittent Pilot Ignition System Appliance Dimension Diagram Reference MaterialsVent Components Diagrams DVP45DVP-TRAPFL 229 mm DVP-TRAP DVP-HRC-SS  B. Vent Components Diagrams SLP Series Vent ComponentsSL-2DVP SLK-SNKD DVP-FBHT Part number list on following Log Set AssemblyService Parts Stocked At DepotNNXT4236I, NNXT4236IL #16 Ignition Control Assembly #15 Valve AssemblyOptional Components Contact Information Do not Discard this Manual