15 Appliance Setup

A. Remove the Packaging

Remove the shrink film, corrugated top cap, bottom cap and column protectors from the appliance. The appliance should look as shown in Figure 15.1.

C. Remove the Shipping Materials

Remove the shipping materials from inside or underneath the firebox.

Figure 15.1 Appliance Unwrapped

B. Remove Screen Package Assembly

Grasp the top of the screen package and lift up to remove. See Figures 15.2 and 15.3.

Figure 15.2 Lift up on Screen Package

D. Removing Fixed Glass Assembly

WARNING! Risk of Asphyxiation! Handle fixed glass assembly with care. Inspect the gasket to ensure it is undamaged and inspect the glass for cracks, chips or scratches.

DO NOT:

Strike, slam or scratch glass

Operate fireplace with glass removed, cracked, broken or scratched.

Replace fixed glass assembly as a complete assembly.

Remove screen.

Pull the four (30/33/36 in. appliances) or seven (42 in. appliance) glass assembly latches out of the groove on the glass frame. Refer to Figure 15.4.

Remove the glass assembly from the appliance.

Latches

 

(both bottom

 

and top)

 

Glass

 

Assembly

 

Figure 15.4

Glass Assembly

E. Remove Top Log Pack

The top log pack is shipped inside the firebox. When you remove the glass, the log pack will come out also.

F. Remove Packing Material

• Remove packing material (Figure 15.5).

Figure 15.3 Remove Screen Package

Figure 15.5 Remove Lytherm Pieces

60

Heatilator • Novus NNXT • 4055-879 • Rev. o • 2/12

Image 60
Contents Installation and Operation ModelsCongratulations Homeowner Reference InformationTable of Contents Finishing Limited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Gas Fireplace Safety Operating InstructionsYour Fireplace Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesFan Kit optional Clear SpaceIPI Battery Tray/Battery Installation Control Module OperationBefore Lighting Fireplace Lighting Instructions IPI Final inspection byFrequently Asked Questions Initial Break-in ProcedureAfter Fireplace is Lit Maintenance and Service Maintenance Tasks-HomeownerMaintenance Tasks-Qualified Service Technician Getting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Framing and Clearances Select Appliance LocationConstruct the Appliance Chase Clearances In. to Level of StandoffsMantel and Wall Projections MantelsMantel Legs or Wall Projections Termination Locations Vent Termination Minimum ClearancesMinimum Clearances for Termination Vent Information and Diagrams Approved PipeVent Table Key Use of ElbowsVent Diagrams Top Vent Horizontal TerminationOne Elbow Two 45 Elbows replacing One 90 Elbow Two ElbowsTop Vent Vertical Termination Three ElbowsNo Elbow TionsLower & twist pull out 12 ft 3.66 m min 60 ft 18.29 m max 12 ft 3.66 m min ft 18.29 m max Rear Vent Horizontal Termination One 45 ElbowInstalled Horizontally Rear Vent Vertical Termination Min Ft 1.83 m max 12 ft 3.66 m min Vent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Ceiling firestop Must be used between floors and atticsInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Appliance Preparation Top VentRear Vent It Cannot be changed at a later time BasketSecure and Level the Appliance 11 Proper Positioning and Securing of an ApplianceInstall Vent Pipe Attach Pipe to the Firebox AssemblyAssemble Vent Sections DVP Only Assemble Pipe SectionsAssemble Vent Sections SLP Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Decorative Ceiling Components SLP only Install Metal Roof Flashing Assemble and Install Storm CollarInstall Vertical Termination Cap Install Decorative Wall Components SLP onlyHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap Failure to maintain overlap may cause overheating and fireShrouds HHT ShroudsField Constructed Shrouds Open Top Shroud may be used with DVP-TV, DVP-TVHW, SLP-TVHWMailbox Style Shroud Dimensions Min. Base Dims Gas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements Intellifire Plus Ignition System WiringOptional Accessories Requirements Electrical InformationElectrical Service and Repair RC200 Wiring DiagramJunction Box Installation Wall Switch Installation for Fan OptionalRemote Control Installation & Operations RC200Installation of Remote Control Housing Programming the RC200 to the Control Module Power Outage Finishing Facing Material Do not RemoveAppliance Setup Clean the Appliance Assemble Logs AccessoriesPlace the Rockwool Place the Lava RockReplacing Fixed Glass Assembly Air Shutter SettingInstall Hood Install Control Heat ShieldInstall the Control Heat Shield Remove Screen ProtectorInstall Floor Cover Install the floor cover as shown in FigureClose the Screen Assembly Hang Screen on Shoulder ScrewsTroubleshooting Intellifire Plus Intermittent Ignition SystemIntellifire Plus Intermittent Pilot Ignition System Appliance Dimension Diagram Reference MaterialsVent Components Diagrams DVP45DVP-TRAPFL 229 mm DVP-TRAP DVP-HRC-SS  B. Vent Components Diagrams SLP Series Vent ComponentsSL-2DVP SLK-SNKD DVP-FBHT Log Set Assembly Service PartsPart number list on following Stocked At DepotNNXT4236I, NNXT4236IL #16 Ignition Control Assembly #15 Valve AssemblyOptional Components Contact Information Do not Discard this Manual