Quadra-Fire MTVERNON-AE-CSB Mt. Vernon Pellet Stove AE Chimney and Exhaust Connection, See Figure

Page 11

R

Mt. Vernon Pellet Stove (AE)

B.Chimney and Exhaust Connection

1.Chimney & Connector: Use 3 or 4 inch (76-102mm) diameter type "L" or "PL" venting system. It can be vented vertically or horizontally.

2.Mobile Home: Approved for all Listed pellet vent. If using the 3 inch (76mm) vertical Top Vent Adapter Kit or the 3 to 6 inch (76-152mm) Top Vent Offset Adapter, use Listed double wall flue connector. A Quadra-Fire Outside Air Kit must be used with manufactured home installations.

3.Residential: The 3 inch (76mm) vertical Top Vent Adapter Kit and the 3 to 6 inch (76-152mm) Top Vent Offset Adapter are tested to use 24 gauge single wall flue connector or Listed double wall flue connector to Class A Listed metal chimneys, or masonry chimneys meeting International Residential Code standards for solid fuel appliances.

4.INSTALL VENT AT CLEARANCES SPECIFIED BY THE VENT MANUFACTURER.

5. Secure exhaust venting system to the appliance with at least 3 screws. Also secure all connector pipe joints with at least 3 screws through each joint.

NOTE: All pipe must be welded seam pipe whenever possible. Seal pipe joints with high temperature silicone (500°F [260°C] minimum rated only).

NOTE: If burning shelled field corn, you must use approved venting specifically designed for corn. Follow the instructions from the venting manufacturer.

WARNING

Fire Risk

Only LISTED venting components may be used.

NO OTHER vent components may be used. Substitute or damaged vent components may impair safe operation.

WARNING

Vent surfaces get HOT, can cause burns if touched. Non-combustible shielding or guards may be required.

WARNING

Improper installation, adjustment, alteration, service or maintenance can cause injury or property damage. Refer to the owner’s information manual provided with this ap- pliance. For assistance or additional information consult a qualified installer, service agency or your dealer.

C. Equivalent Feet of Pipe

The table below can help you calculate the equivalent feet of pipe which is a method used to determine pellet vent size.

See Figure 11.1.

Example of 3 Elbow-Rear Vent Termination Calculation

2 ft.

3 ft.

2 ft.

Pellet Venting

# of

Feet of

Multiplied

Equivalent

Components

Component

Elbows

Pipe

 

By

Feet

Equivalent Feet

90o Elbow or Tee

3

 

 

X

5

15

45o Elbow

 

 

 

X

3

 

Horizontal Pipe

 

7

 

X

1

7

Vertical Pipe

 

2

 

X

0.5

1

 

 

 

 

Total Equivalent Feet

23

Note: This is a generic example and is not intended to represent any specific fuel type.

2 ft.

Figure 11.1

September 1, 2008

7034-106E

Page 11

Image 11
Contents Hot glass will cause burns Installation OperationMfg Date Test Lab & Report No Mt. Vernon Pellet Stove AETable of Contents Listing and Code Approvals Appliance Location Getting StartedDraft Wall Control ThermostatNegative Pressure Inspect Appliance & Components and Pre-Use Check List Mt. Vernon Pellet Stove AE Fire SafetyTools And Supplies Needed 76-152mm Adapter To 6 in 76-152mm Offset Adapter 3Dimensions and ClearancesAppliance Dimensions Hearth Pad Requirements UL and ULC Exception for Horizontal InstallationsTermination must exhaust above air inlet elevation 4Vent InformationVenting Termination Minimum Requirements Do not Terminate VentSee Figure Mt. Vernon Pellet Stove AE Chimney and Exhaust ConnectionEquivalent Feet of Pipe Example of 3 Elbow-Rear Vent Termination CalculationAltitude in Thousands of Feet Mt. Vernon Pellet Stove AE Pipe Selection ChartAlcove 5Venting SystemsMt. Vernon Pellet Stove AE Through The Wall Straight OutDegree Through The Wall & Vertical Exterior Vertical Interior Typical InstallationAlternate Masonry Mt. Vernon Pellet Stove AE Masonry6Mobile Home Installation Outside Air Kit Instructions 7Appliance Set-UpLeg Leveling System Rear Vent and Rear Vent to Top Vent Mt. Vernon Pellet Stove AE Top Vent Adapter InstallationAdapter Installation Installing the Top Vent AdapterPiece LOG SET Installation Back Side of Wall Control with Cover Off Fuel Size, Material and Storage Operating InstructionsStarting Your First Fire See Wall Control Thermostat ManualFor detailed operating instructions Auto / Man L, ML, M, MH, H Battery Back-up System OptionalIgnition Cycles Start-UpAdditional Screen Messages Auto-CleanAuto / Man L, ML, M, MH, H Cont’d ShutdownWall Control for Reference Mt. Vernon Pellet Stove AE Quick Start GuideMt. Vernon Pellet Stove AE Quick Start Guide Cont’d Setting Comfort LevelIssues Solutions Mt. Vernon Pellet Stove AE Frequently Asked QuestionsPossible Cause Corrective Action Error MessageWeeks Quick Reference Maintenance ChartCleaning or Inspection 10Maintaining & Servicing Your ApplianceSee Disposal of Ashes below Cleaning Ash Pan FrequencyTypes of Fuel Alternate Fuel DailyCleaning Heat Exchanger & Drop Tube Mt. Vernon Pellet Stove AE Cleaning the Top Vent Adapter if installed Cleaning the HopperCleaning the Glass Cleaning Convection Blower Requires No LubricationPreparing Firebox for Non-Burn Season High Ash Fuel Content MaintenanceConvection Blower Replacement Combustion Exhaust Blower Replacement Component Functions Reference MaterialsThermocouple Firepot Power SupplyThermocouple Drop Tube Vacuum Switch Overheat Sensor Snap DiscLeft Side Mt. Vernon Pellet Stove AE Component LocationsDescription Part Number Mt. Vernon Pellet Stove AE Exploded DrawingsMt. Vernon Pellet Stove AE Item No Accessories Mt. Vernon Pellet Stove AE Service Parts and AccessoriesMt. Vernon Pellet Stove AE TOUCHUP-CSB Item No Date of Service Performed By Description of Service Mt. Vernon Pellet Stove AE Service And Maintenance LogDate of Service Performed By Description of Service Mt. Vernon Pellet Stove AE Homeowner’s Notes CONDITIONS, Exclusions & Limitation of Liability Mt. Vernon Pellet Stove AE Warranty PolicyHearth & Home Technologies Limited Warranty Cont’d T O T O