Quadra-Fire MTVERNON-AE-PMH, MTVERNON-AE-MBK, MTVERNON-AE-CWL Listing and Code Approvals

Page 4

R

Mt. Vernon Pellet Stove (AE)

1 Listing and Code Approvals

A. Appliance Certification

Model

Mt. Vernon Pellet Stove AE

Laboratory

OMNI Test Laboratories, Inc.

Report No.

061-S-68-6

Type

Solid Fuel Room Heater/Pellet Type

Standard

ASTM E1509-04, ULC S627-00 and

 

ULC/ORD-C1482-M1990 Room Heater

 

Pellet Fuel Burning type and (UM) 84-

 

HUD, Mobile Home Approved.

FCC

Complies with Part 15 of FCC Rules.

 

Operation is subject to the following

 

two conditions: (1) this device may not

 

cause harmful interference, and (2) this

 

device must accept any interference

 

received, including interference that

 

may cause undesired operation.

E. BTU & Efficiency Specifications

Emissions Rating:

EPA Compliance

*BTU Output:

14,620 - 60,200

Efficiency:

81.4% - 83.6%

Heating Capacity:

2,400 - 3,800 square feet depend-

 

ing on heating zone

Hopper Capacity:

81 lbs

Fuels:

Pellets, Shelled Field Corn, Wheat

 

and Black Sunflower Seeds

Shipping Weight:

429 lbs

*BTU output will vary, depending on the type of fuel you use in your stove. Consult your Quadra-Fire dealer for best results.

B. Mobile Home Approved

This appliance is approved for mobile home installations when not installed in a sleeping room and when an outside combustion air inlet is provided. The structural integrity of the mobile home floor, ceiling, and walls must be maintained. The appliance must be properly grounded to the frame of the mobile home and use only listed pellet vent Class “L” or “PL” connector pipe. A Quadra-Fire Outside Air Kit must be installed in a mobile home installation.

NOTE: Hearth & Home Technologies, manufacturer of this appliance, reserves the right to alter its products, their specifications and/or price without notice.

C. Glass Specifications

This appliance is equipped with 5mm ceramic glass. Replace glass only with 5mm ceramic glass. Please contact your dealer for replacement glass.

NOTE: This installation must conform with local codes. In the absence of local codes you must comply with the

ASTM E1509, ULC S627-00, (UM) 84-HUD and ULC/ ORD-C-1482.

D. Electrical Rating

115 VAC, 60 Hz, Start 5 Amps, Run 1.25 Amps

Page 4

7034-106E

September 1, 2008

Image 4
Contents Installation Operation Hot glass will cause burnsMt. Vernon Pellet Stove AE Mfg Date Test Lab & Report NoTable of Contents Listing and Code Approvals Getting Started Appliance LocationNegative Pressure Wall Control ThermostatDraft Tools And Supplies Needed Mt. Vernon Pellet Stove AE Fire SafetyInspect Appliance & Components and Pre-Use Check List Appliance Dimensions 3Dimensions and Clearances76-152mm Adapter To 6 in 76-152mm Offset Adapter Exception for Horizontal Installations Hearth Pad Requirements UL and ULC4Vent Information Venting Termination Minimum RequirementsDo not Terminate Vent Termination must exhaust above air inlet elevationMt. Vernon Pellet Stove AE Chimney and Exhaust Connection Equivalent Feet of PipeExample of 3 Elbow-Rear Vent Termination Calculation See FigureMt. Vernon Pellet Stove AE Pipe Selection Chart Altitude in Thousands of Feet5Venting Systems AlcoveDegree Straight OutMt. Vernon Pellet Stove AE Through The Wall Vertical Interior Typical Installation Through The Wall & Vertical ExteriorMt. Vernon Pellet Stove AE Masonry Alternate Masonry6Mobile Home Installation Leg Leveling System 7Appliance Set-UpOutside Air Kit Instructions Mt. Vernon Pellet Stove AE Top Vent Adapter Installation Adapter InstallationInstalling the Top Vent Adapter Rear Vent and Rear Vent to Top VentPiece LOG SET Installation Back Side of Wall Control with Cover Off Operating Instructions Fuel Size, Material and StorageFor detailed operating instructions See Wall Control Thermostat ManualStarting Your First Fire Battery Back-up System Optional Ignition CyclesStart-Up Auto / Man L, ML, M, MH, HAuto-Clean Auto / Man L, ML, M, MH, H Cont’dShutdown Additional Screen MessagesMt. Vernon Pellet Stove AE Quick Start Guide Wall Control for ReferenceSetting Comfort Level Mt. Vernon Pellet Stove AE Quick Start Guide Cont’dMt. Vernon Pellet Stove AE Frequently Asked Questions Issues SolutionsError Message Possible Cause Corrective ActionQuick Reference Maintenance Chart Cleaning or Inspection10Maintaining & Servicing Your Appliance WeeksCleaning Ash Pan Frequency Types of FuelAlternate Fuel Daily See Disposal of Ashes belowCleaning Heat Exchanger & Drop Tube Mt. Vernon Pellet Stove AE Cleaning the Hopper Cleaning the GlassCleaning Convection Blower Requires No Lubrication Cleaning the Top Vent Adapter if installedHigh Ash Fuel Content Maintenance Preparing Firebox for Non-Burn SeasonConvection Blower Replacement Combustion Exhaust Blower Replacement Reference Materials Component FunctionsPower Supply Thermocouple Drop Tube Vacuum SwitchOverheat Sensor Snap Disc Thermocouple FirepotMt. Vernon Pellet Stove AE Component Locations Left SideMt. Vernon Pellet Stove AE Exploded Drawings Description Part NumberMt. Vernon Pellet Stove AE Mt. Vernon Pellet Stove AE Service Parts and Accessories Item No AccessoriesMt. Vernon Pellet Stove AE TOUCHUP-CSB Item No Mt. Vernon Pellet Stove AE Service And Maintenance Log Date of Service Performed By Description of ServiceDate of Service Performed By Description of Service Mt. Vernon Pellet Stove AE Homeowner’s Notes Mt. Vernon Pellet Stove AE Warranty Policy CONDITIONS, Exclusions & Limitation of LiabilityHearth & Home Technologies Limited Warranty Cont’d T O T O