OPERATING INSTRUCTIONS

SS38 Direct Vent Gas Stove

Lighting burner

main burner switch

The “ON/OFF/RS” switch for the main burner can be found behind the pedestal door of the stove. This switch allows you to turn on and to turn off the main burner without using the gas valve knob. Make sure the button is in the “ON” position to light the main burner. Figure 40

Lighting the burner

Depress and turn the knob counterclockwise to the “ON” position. Figure 41. It will take less than four (4) seconds for the burner to ignite.

Pilot position

Depress and turn knob to pilot position to keep burner off while maintaining the pilot light. Figure 42

 

 

O

 

T

N

 

 

 

O

 

 

L

 

 

I

 

 

P

 

Figure 42 -

 

F

 

 

F

Pilot Position

 

O

PILOT

 

ON

OFF

RS

 

 

 

Figure 40 - On/Off/RS Switch

N

 

 

O

 

O

 

 

 

 

F

 

 

F

 

 

P

PILOT

T

L

 

O

 

 

Figure 41 -

On Position

to turn off gas

Depress and turn knob clockwise to “OFF” position. Figure 43

Figure 43 - Off Position

 

PI

 

L

 

O

 

T

F

 

F

 

O

O

 

N

PILOT

46D0232

29

Image 29
Contents What to do if YOU Smell GAS StratfordSS38 Direct Vent Gas Stove Table of ContentsOwner Important Safety InformationInstaller Listed Vented GAS Stove Heater Important Safety InformationCode Approval Product Specifications Product featuresInstalling Above 2000 Feet Gas Specifications & Orifice SizeSS38 Direct Vent Gas Stove Stove Location General Installation InformationFront of the heater Clearances to combustiblesInstructions exactly can create a fire hazard Full width and depth of the applianceInstallation Precautions Venting Installation InformationInstallation Planning For Horizontal TerminationVenting Installation Information Installing a vent system in an Outside chaseCanadian Installations1 US Installations2 47.5 121cm Installation for Horizontal TERMI- Nation Venting installationDo not recess vent terminal into a wall or SidingVenting Installation Horizontal Venting Vertical V Minimum Horizontal H Maximum Horizontal termination configurationsVenting Installation Installation for Vertical TERMINA- TionCathedral Ceiling Installation Venting Installation Flat Ceiling InstallationVertical Termination CONFIGURA- Tions Horizontal H + H1 Minimum Vertical Venting with Two 2 Elbows Horizontal H + H1Vertical Venting with Two 2 Elbows Check gas type Install gas piping to stove / burner system locationStove Installation CSA-B149 1 or 2 Installation Code Stove InstallationNatural Gas Propane/LPDo not use open flame to check for gas leaks Installing LouversRemote Wall mounted Switch Electrical InstallationElectrical Wiring Final Installation Installing logs and rock wool ember material in fireboxFinal Installation Install Rock Wool Never use an open flame to check for gas leak Operating InstructionsWhat to do if YOU Smell GAS Never check for gas leak with open flame Approved leak testing methodOperating Instructions Pilot position Main burner switchLighting the burner Firebox Cleaning Cleaning glassCleaning & Maintenance Venting systemAdjusting the AIR Shutter Air shutter Adjustment Natural Gas onlyBroken glass Always use gloves when handlingMake sure the glass panel edges do not Touch any metal parts during thermalBlower Blower Wiring diagram for BlowerObserved Problem Possible Cause Remedy TroubleshootingReplacement parts Fuel Conversion Kits SS38DVB,GN,P0Description Qty Natural Propane Description Venting ComponentsCarbon Monoxide Detector Requirements If Warranty Service is Needed Mhsc