Monessen Hearth SS38 operating instructions Venting Installation Flat Ceiling Installation

Page 17

VENTING INSTALLATION

FLAT CEILING INSTALLATION

1.Cut a 9Z\x" (241 mm) square hole in the ceiling using the locating hole as a center point The opening should be framed to 9Z\x" x 9Z\x" (241 x 241 mm) inside dimensions as shown in Figure 20 using framing lumber the same size as the ceiling joist. If the area above the ceiling is an insulated ceiling or a room, nail firestop from the top side. This prevents loose insulation from falling into the required clearance space. Figure 19. Otherwise, install firestop below the framed hole. The firestop should be installed with no less than three nails per side. Figure 20.

2.Assemble the desired lengths of pipe and elbows nec- essary to reach from the burner system flue up through the firestop. Be sure pipe and elbow connections are fully twist-locked. Page 13, Figure 10

3.Cut a hole in the roof using the locating hole as a center point. (Cover any exposed open vent pipes before cut- ting hole in roof). The 9Z\x" x 9Z\x" (241 x 241 mm) hole must be measured on the horizontal. Actual length may be larger depending on the pitch of the roof. There must be a 1" minimum clearance from the vent pipe to com- bustible materials. (Insulation should be considered a combustible material) Frame the opening as shown in Figure 11 on Page 14.

Nails

SS38 Direct Vent Gas Stove

4.Connect a section of pipe and extend up through the hole.

NOTE: If an offset is needed to avoid obstructions, you must support the vent pipe every three (3) feet. Use wall straps for this purpose. See Figure 18, page 17. Whenever possible, use 45° elbows instead of 90° elbows. The 45° elbow offers less restriction to the flow of the flue gases and intake air.

5.Place the flashing over the pipe section(s) extending through the roof. Secure the base of the flashing to the roof and framing with roofing nails. Be sure roofing material overlaps the top edge of the flashing as shown in Figure 18, page 17. There must be a 1" clearance from the vent pipe to combustible materials.

6.Continue to add pipe sections until the height of the vent cap meets the minimum building code requirements.

NOTE: You must increase vent height for steep roof pitches. Nearby trees, adjoining roof lines, steep pitched roofs, and other similar factors may cause poor draft or down-drafting in high winds. Increasing the vent height may solve this problem.

NOTE: If the vent pipe passes through any occupied areas above the first floor, including storage spaces and closets, you must enclose pipe. You may frame and sheetrock the enclosure with standard construction material. Make sure to meet the minimum allowable clearances to combustibles. Do not fill any of the required air spaces with insulation.

CATHEDRAL CEILING INSTALLATION

IMPORTANT: Review all information on previous page before planning this installation. Cathedral ceiling installations can be very tricky.

Firestop

Figure 19 -

FP1969

1. Remove shingles or other roof covering as necessary

to cut the rectangular hole for the support box. Mark the

outline of the cathedral ceiling support box on the roof

sheathing using the locating hole as a center point.

If area above is a room, install firestop above framed hole as shown

 

 

 

 

 

9

 

 

 

 

 

"

1

 

 

 

/

 

/

 

 

 

 

 

2

9

1

 

2

 

 

"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FP1970

NailsFirestop

Figure 20 - If area above is not a room, install firestop below framed hole as shown

2.

Cut the hole 1/8" larger than the support box outline.

 

Figure 21

3.

Lower the support box through the hole in the roof until

 

the bottom of the box extends at least 2" ( mm) below

 

the ceiling. Figure 21. Align the support box vertically

 

and horizontally using a level. Temporarily tack the sup-

 

port box in place through the inside walls and into the

 

roof sheeting.

4.

Using tin snips, cut the support box from the top corners

 

down to the roofline and fold the resulting flaps over the

 

roof sheeting. Figure 22. Apply a bead of non-hardening

 

mastic around the top edges of the support box to make

 

a seal between the box and the roof. Nail in place with

 

roofing nails. Remove any combustible material that

 

might be inside the support box.

5.

Complete the cathedral ceiling installation by following

 

the same procedures outlines in Steps 2 through 6 for

 

Flat Ceiling Installation, Page 17 and above.

46D0232

17

Image 17
Contents What to do if YOU Smell GAS StratfordSS38 Direct Vent Gas Stove Table of ContentsOwner Important Safety InformationInstaller Listed Vented GAS Stove Heater Important Safety InformationCode Approval Product Specifications Product featuresInstalling Above 2000 Feet Gas Specifications & Orifice SizeSS38 Direct Vent Gas Stove Stove Location General Installation InformationFront of the heater Clearances to combustiblesInstructions exactly can create a fire hazard Full width and depth of the applianceInstallation Precautions Venting Installation InformationInstallation Planning For Horizontal TerminationVenting Installation Information Installing a vent system in an Outside chaseCanadian Installations1 US Installations2 47.5 121cm Installation for Horizontal TERMI- Nation Venting installationDo not recess vent terminal into a wall or SidingVenting Installation Horizontal Venting Vertical V Minimum Horizontal H Maximum Horizontal termination configurationsVenting Installation Installation for Vertical TERMINA- TionCathedral Ceiling Installation Venting Installation Flat Ceiling InstallationVertical Termination CONFIGURA- Tions Horizontal H + H1 Minimum Vertical Venting with Two 2 Elbows Horizontal H + H1Vertical Venting with Two 2 Elbows Check gas type Install gas piping to stove / burner system locationStove Installation CSA-B149 1 or 2 Installation Code Stove InstallationNatural Gas Propane/LPDo not use open flame to check for gas leaks Installing LouversRemote Wall mounted Switch Electrical InstallationElectrical Wiring Final Installation Installing logs and rock wool ember material in fireboxFinal Installation Install Rock Wool Never use an open flame to check for gas leak Operating InstructionsWhat to do if YOU Smell GAS Never check for gas leak with open flame Approved leak testing methodOperating Instructions Pilot position Main burner switchLighting the burner Firebox Cleaning Cleaning glassCleaning & Maintenance Venting systemAdjusting the AIR Shutter Air shutter Adjustment Natural Gas onlyBroken glass Always use gloves when handlingMake sure the glass panel edges do not Touch any metal parts during thermalBlower Blower Wiring diagram for BlowerObserved Problem Possible Cause Remedy TroubleshootingReplacement parts Fuel Conversion Kits SS38DVB,GN,P0Description Qty Natural Propane Description Venting ComponentsCarbon Monoxide Detector Requirements If Warranty Service is Needed Mhsc