Napoleon Fireplaces GVF40P, GVF40N manual Island Installation Procedure

Page 12

12

ISLAND INSTALLATION PROCEDURE

FRAMING

Note: In order to avoid the possibility of exposed insula- tion or vapour barrier coming in contact with the fireplace body, it is recommended that the walls of the fireplace enclosure be “finished” (ie: drywall/sheetrock), as you would finish any other outside wall of a home. This will ensure that clearance to combustibles is maintained within the cavity.

It is best to frame your fireplace after it is positioned. Use 2x4's and frame to local building codes.FIGURE 18.

A

FIGURE 18

A = 22 " minus finishing material thickness each side.

To install the fireplace face flush with the finished wall, position the framework to accommodate the thickness of the finished wall.

FIGURE 19

BRICK PANEL INSTALLATION

Install the base panels as illustrated in steps 1-4 on page 9.

FACING

Combustible materials may be installed flush with the front of the fireplace but must not cover any of the black face- areas of the fireplace. Non-combustible material (brick, stone or ceramic tile) may protrude in these areas.

It is not necessary to install a hearth extension with this fireplace system.

When roughing in the fireplace, raise the fireplace to ac- commodate for the thickness of the finished floor materi- als, i.e. tile, carpeting, hard wood, which if not planned for will interfere with the opening of the lower access door and the installation of many decorative flashing accesso- ries.

Objects placed in front of the fireplace should be kept a minimum of 48" away from the glass front faces of the fireplace.

FIGURE 20

DRYWALL

DRYWALL

FINISHING

Refer to pages 13-15 for complete instructions regarding

W415-0319 / D / 08.03.05mantle requirements and installations, log placement, glass door and upper and lower louvre attachments.

Image 12
Contents Unvented Millivolt System Table of Contents Napoleon GAS Fireplace Presidents Lifetime Limited Warranty General Instructions General InformationCarbon Monoxide Poisoning MAY Lead to Death Installation Combustion and Ventilation AIR ProvisionsDetermining Confined or Unconfined Space GAS Installation Sided Peninsula Installation Procedure Countertop / BAR InstallationFraming Brick Panel Installation FacingFinishing OPEN-END Installation Procedure = 25¼ minus finishing material thickness each sideSEE-THROUGH Installation Procedure Framing FacingIsland Installation Procedure LOG Placement FinishingMantle Installation Glowing EmbersCharcoal Embers HoodGvfl Installation L36 Louvre InstallationLogo Placement Heat Shield STAND-OFF RemovalGVF103-KT Patented Catalytic Door Installation OptionsDoor Opening and Closing Optional Blower Installation This Blower is not Recommended for the 4 Sided InstallationOperation / Maintenance For Your Safety Read Before LightingMaintenance Catalytic Tile MaintenanceOxygen Depletion Sensor Pilot Cleaning Venturi AdjustmentReplacements AccessoriesW415-0319 / D Trouble Shooting Guide Symptom Problem Test SolutionDo not Clean Glass When HOT Fireplace Service History