Napoleon Fireplaces GVF40N, GVF40P manual Brick Panel Installation, Facing, Finishing

Page 9

BRICK PANEL INSTALLATION

Install the base panels as illustrated in steps 1-4 . The side panel sits under the bracket tab. Holding the side panel in position, bend down the tab to secure. [DETAIL 5.]

FIGURES 9a-e

STEP 1

STEP 2

STEP 3

STEP 4

RETAINER

STEP 5

DETAIL5

9

FACING

Combustible materials may be installed flush with the front of the fireplace but must not cover any of the black face- areas of the fireplace. Non-combustible material (brick, stone or ceramic tile) may protrude in these areas.

It is not necessary to install a hearth extension with this fireplace system.

When roughing in the fireplace, raise the fireplace to ac- commodate for the thickness of the finished floor materi- als, i.e. tile, carpeting, hard wood, which if not planned for will interfere with the opening of the lower access door and the installation of many decorative flashing accessories.

Objects placed in front of the fireplace should be kept a minimum of 48" away from the glass front faces of the fireplace.

FIGURE 10

DRYWALL

DRYWALL

4" MIN

FINISHING

Refer to pages 13-15 for complete instructions regarding mantle requirements and installations, log placement, glass door and upper and lower louvre attachments.

W415-0319 / D / 08.03.05

Image 9
Contents Unvented Millivolt System Table of Contents Napoleon GAS Fireplace Presidents Lifetime Limited Warranty General Instructions General InformationCarbon Monoxide Poisoning MAY Lead to Death Installation Combustion and Ventilation AIR ProvisionsDetermining Confined or Unconfined Space GAS Installation Sided Peninsula Installation Procedure Countertop / BAR InstallationFraming Brick Panel Installation FacingFinishing = 25¼ minus finishing material thickness each side OPEN-END Installation ProcedureFraming Facing SEE-THROUGH Installation ProcedureIsland Installation Procedure Finishing LOG PlacementGlowing Embers Mantle InstallationCharcoal Embers HoodL36 Louvre Installation Gvfl InstallationLogo Placement Heat Shield STAND-OFF RemovalGVF103-KT Patented Catalytic Door Installation OptionsDoor Opening and Closing This Blower is not Recommended for the 4 Sided Installation Optional Blower InstallationFor Your Safety Read Before Lighting Operation / MaintenanceCatalytic Tile Maintenance MaintenanceOxygen Depletion Sensor Pilot Cleaning Venturi AdjustmentAccessories ReplacementsW415-0319 / D Symptom Problem Test Solution Trouble Shooting GuideDo not Clean Glass When HOT Fireplace Service History