Napoleon Fireplaces GVF40N manual Gvfl Installation, Heat Shield STAND-OFF Removal, Logo Placement

Page 15

LOWERLOUVREBRACKETS&HINGESCREEN

15

A

B

FIGURES 29

Using 6 screws, attach the lower louvre brackets and hinge screen as illustrated. Be sure to install the louvre brack- ets over the hinge screen.

GVFL INSTALLATION

B

C

HINGE

CLIP

S L O T

TA B

S L O T

UPPER LOUVRES

Insert the louvre tabs into the slots located at the top left and right corners of the unit.

LOWER LOUVRES

Insert the hinge clips into the slots located at the bottom left and right corners of the unit.

HOOD

BRACKET

SLOT

30LOUVRE

31LOWER LOUVRES (VALVE CONTROL DOOR)

TO INSTALL THE UP- PER LOUVRES: Insert the upper louvres into the slots on both brack- ets. Press the top flange of the hood into the four clips located along the top of the unit as shown.

TO INSTALL THE LOWER LOUVRE AS- SEMBLY: Attach each hinge to the firebox with 2 screws.

To remove the louvres, pull the back tabs of the clips forward, while pushing the louvre assem- bly back. Lift the clip.

HEAT SHIELD STAND-OFF

REMOVAL

HEAT

SHIELD

 

L36 LOUVRE INSTALLATION

FIGURE 32 a-c

A

 

 

B

C

FIGURE 33

STAND-

 

OFFS

END HEAT SHIELD SHOWN

When using a non-combustible finishing material, the stand-offs may be removed, by removing the set screw in the centre and sliding the stand-offs out of the mounting clips.

LOGO PLACEMENT

Remove the backing of the logo supplied and place on the screen cover, as indicated.

A CLIPS

FLANGE

C E N T R E

S L O T

HOOD

Attach the hood by pressing the top flange into the clips along the top of the louvre opening. Secure using a screw through the centre slot.

FIGURE 34

W415-0319 / D / 08.03.05

Image 15
Contents Unvented Millivolt System Table of Contents Napoleon GAS Fireplace Presidents Lifetime Limited Warranty General Instructions General InformationCarbon Monoxide Poisoning MAY Lead to Death Installation Combustion and Ventilation AIR ProvisionsDetermining Confined or Unconfined Space GAS Installation Sided Peninsula Installation Procedure Countertop / BAR InstallationFraming Brick Panel Installation FacingFinishing = 25¼ minus finishing material thickness each side OPEN-END Installation ProcedureFraming Facing SEE-THROUGH Installation ProcedureIsland Installation Procedure Finishing LOG PlacementHood Mantle InstallationGlowing Embers Charcoal EmbersHeat Shield STAND-OFF Removal Gvfl InstallationL36 Louvre Installation Logo PlacementGVF103-KT Patented Catalytic Door Installation OptionsDoor Opening and Closing This Blower is not Recommended for the 4 Sided Installation Optional Blower InstallationFor Your Safety Read Before Lighting Operation / MaintenanceVenturi Adjustment MaintenanceCatalytic Tile Maintenance Oxygen Depletion Sensor Pilot CleaningAccessories ReplacementsW415-0319 / D Symptom Problem Test Solution Trouble Shooting GuideDo not Clean Glass When HOT Fireplace Service History