Jotul GF 200 DV manual Vertical Venting Requirements, Minimum Vertical Rise =1 ft For a

Page 9

Remove

Rear Wall

this

of Firebox

screw

 

only

Air

 

 

Deflector

VERTICAL VENTING, OR ANY HORIZONTAL VENTING WITH VERTICAL RISE, MUST TERMINATE (END) WITHIN THE SHADED AREA.

RESTRICTOR REQUIRED ON ALL VERTICAL VENTING.

ALWAYS MAINTAIN THE PROPER CLEAR- ANCES TO COMBUSTIBLES.

Air Intake Restrictor Plate

Figure 7. Install the Air Inlet Restrictor Plate.

Vertical Venting Requirements

These requirements apply to any installation that includes a verrtical vent run.

The GF 200 DV Lillehammer can be vertically vented through a roof or ceiling following these guidelines:

￿Steep roofs, nearby trees, and predominantly windy conditions can contribute to poor draft or down-draft occurances. Increasing the height of the vent may alleviate these conditions.

￿Use Simpson Dura-Vent Wall Straps (#988) to support an offset pipe run at three feet intervals to avoid excessive stress on the offsets.

￿Whenever possible use 45° elbows instead of 90° elbows as they are less restrictive to exhaust gas and intake air flow.

￿GAS VENT RULE: In no case shall any discharge opening on the cap be less than 2' (610mm) horizon- tally from the roof surface. See Figure 11.

￿A firestop is required at every floor. The opening should be framed to 10" X 10" inside dimension.

Simpson Dura-Vent Ceiling Firestop #943 is required.

￿Any venting that is exposed above the first floor, regardless of attic space or living space, must be enclosed. Always maintain the required 1" clearance from all sides of the vertical vent system.

￿Install the Exhaust Gas Restrictor in all Vertically Terminated vent systems. See the Adding Restriction section on page 8.

￿A vertical run in any horizontally-terminated system must rise a minimum of 1 ft. See Fig. 12-5.

35 Ft.

(10.67 m)

30 Ft.

(9.14 m)

25 Ft.

(7.62 m)

RUN

 

VERTICAL

20 Ft.

(6.10 m)

15 Ft.

(4.57 m)

10 Ft.

(3.05 m)

5 Ft.

(1.52 m)

1 Ft.

(.30 m)

Minimum

Vertical

Rise =1 ft

for a

Horizontal Termination

.

 

 

 

 

 

 

 

 

 

 

 

 

 

5

Ft.

 

 

10

Ft.

 

 

 

 

(1.52 m)

 

(3.05 m)

HORIZONTAL RUN

Table 1. Vertical vent run Termination Window.

9

Image 9
Contents GF 200 DV Lillehammer Gas Heater Welcome to Jøtul Table of Contents Input Rates GF 200 DV Lillehammer OptionsGlass Panel General InformationLocating the Stove Safety InformationHearth Requirements MinimumClearance to Combustibles Install the Air Inlet Restrictor Plate Install the Exhaust Restrictor PlateVenting Requirements Vent RestrictionVertical Venting Requirements Simpson Dura-Vent Ceiling Firestop #943 is requiredMinimum Vertical Rise =1 ft For a These guidelines must be followed Co-linear Hearthmount InstallationNot Vent TWO Appliances Into a Single Chimney Masonry or Prefabricated Chimney ConversionHorizontal Venting Horizontal Termination Horizontal vent with two elbows Wall Shield InstallationVent Terminal Clearances National Fuel Gas Code Vent Termination RequirementsFuel Conversion Kit Contents Mobile Home InstallationGas Conversion Canadian RequirementsAir Shutter adjustment and Burner Orifice Gas Conversion ProcedureConnect the Gas Supply Regulator AssemblyLeak Test Gas PressureRequired Inlet Gas Pressures in. W.C Required Manifold Pressure in. W.CDerating Procedure High Altitude AdjustmentRequirements Canadian RequirementsAir Shutter Settings See Figure Install the Log SetChecking the System Remote ControlCorrect flame picture Operation of ApplianceMaintenance Glass and Gasket ReplacementGlass Front Model Maintenance RecordGF 200 DV Lillehammer Illustrated Parts ListMatte Black Blue Black Ivory Forest Green Painted & Enamelled Cast Iron PartsAccess the lower controls Normal serviceToOFF. Do not force Jøtul North America Jøtul ASA