Jotul manual GF 200 DV Lillehammer Options, Input Rates

Page 4

24”

610 mm

22 3/4” 560

mm

18 1/2”

16 1/2”

420

470 mm

mm

 

Rear Exit

Centerline

18”

460 mm

13”

330 mm

Figure 1. Dimensional Views - GF 200 DV Lillehammer

Jøtul GF 200 DV Lillehammer Specifications

Input Rates

Natural Gas

18,000 BTU/hr. maximum input

13,500 BTU/hr. minimum input

Propane

18,000 BTU/hr. maximum input

13,500 BTU/hr. minimum input

Inlet Pressure:

MIN

MAX

Natural Gas:

5.0 WC (1.24 kPa)

7.0 WC (1.74 kPa)

Propane:

11.0 WC (2.73 kPa)

13.5 WC (3.36 kPa)

Manifold Pressure:

MIN

MAX

Natural Gas:

2.2 WC (.54 kPa)

3.5 WC (.87 kPa)

Propane:

6.5 WC (1.61 kPa)

10.0 WC (2.49 kPa)

Efficiency: 82%

Steady State (A.F.U.E.): 73%

Piezo Ignitor / Standing Pilot

The Jøtul GF 200 DV Lillihammer is a Direct Vent wall furnace designed as a sealed combustion, air circulating gas appliance for residential applications. This appliance is approved for installation using 6 5/ 8" X 4" vent pipe from the following manufacturers:

Simpson Dura-Vent GS Security Vent, Ltd. Amerivent Inc.

The Jøtul Lillehammer gas stove is designed to burn NATURAL GAS or PROPANE only. It is shipped from the factory equipped to burn Natural Gas. If use with Propane is desired, the stove must first be converted for use with that gas. Use the LP Fuel Conversion Kit included with this stove See page 15.

GF 200 DV Lillehammer Options

Fuel Conversion Kit - NG

155349

Fuel Conversion Kit - LP

155350

• High Altitude Conversion Kit - NG

154371

• High Altitude Conversion Kit - LP

154373

Wall Thermostat

750003

Remote Control

129706

• Mobile Home Floor Bracket Kit

154342

4

Image 4
Contents GF 200 DV Lillehammer Gas Heater Welcome to Jøtul Table of Contents GF 200 DV Lillehammer Options Input RatesGeneral Information Glass PanelSafety Information Locating the StoveHearth Requirements MinimumClearance to Combustibles Install the Exhaust Restrictor Plate Install the Air Inlet Restrictor PlateVenting Requirements Vent RestrictionSimpson Dura-Vent Ceiling Firestop #943 is required Vertical Venting RequirementsMinimum Vertical Rise =1 ft For a Co-linear Hearthmount Installation These guidelines must be followedMasonry or Prefabricated Chimney Conversion Not Vent TWO Appliances Into a Single ChimneyHorizontal Venting Horizontal Termination Wall Shield Installation Horizontal vent with two elbowsVent Termination Requirements Vent Terminal Clearances National Fuel Gas CodeMobile Home Installation Fuel Conversion Kit ContentsGas Conversion Canadian RequirementsGas Conversion Procedure Air Shutter adjustment and Burner OrificeRegulator Assembly Connect the Gas SupplyGas Pressure Leak TestRequired Inlet Gas Pressures in. W.C Required Manifold Pressure in. W.CHigh Altitude Adjustment Derating ProcedureRequirements Canadian RequirementsInstall the Log Set Air Shutter Settings See FigureRemote Control Checking the SystemOperation of Appliance Correct flame pictureGlass and Gasket Replacement MaintenanceGlass Front Maintenance Record ModelIllustrated Parts List GF 200 DV LillehammerPainted & Enamelled Cast Iron Parts Matte Black Blue Black Ivory Forest GreenNormal service Access the lower controlsToOFF. Do not force Jøtul ASA Jøtul North America