Lodge Manufacturing GMD1-80N manual Filter Location and Cleaning

Page 44

All installations and services must be performed by qualified service personnel.

1.VESTIBULE: The furnace vestibule areas or burner compartment should be inspected by removing front door of the furnace and looking for signs of excessive heat such as discoloration of components, materials damaged from rust or corrosion, soot or carbon build-up.

2.EXTERIOR OF FURNACES: The furnace exterior should be inspected for signs of excessive heat such as discoloration of materials or damage from rust or corrosion.

3.VENT CONNECTOR: The furnace vent pipe should be inspected for signs of rust, corrosion pitting, or holes in the pipe. Check for leakage around seams in pipe indicated by soot or condensate streaks.

4.ROOF JACKS: The furnace roof jack should be inspected for signs of rust or corrosion, pitting or holes, signs of excessive condensation or moisture leaking from roof jack.

D.FILTER LOCATION AND CLEANING

?CAUTION: To avoid injury from moving part, hot surfaces or electrical shock, shut off the power to the furnace and allow the furnace to cool before removing furnace access door to service filter.

The air filter should be inspected each month and cleaned when dirty. Clean the filter by soaking it in water with a mild detergent and rinsing it with clean water. Allow the filter to air dry before reinstalling it in the furnace. Cleaning the air filter frequently may prevent airborne contaminants from going through the furnace and depositing in the furnace, duct system, and interior of the building.

See Figure 10, in this section, for the location of the return air filter.

43

Image 44
Contents GAS-FIRED Furnace Safety Section Page Page Page Table of Contents Section Beginning Page Models GMD1-80N III. Furnace Specifications Model GMD1-80Blower Data Furnace Location IV. Installation Roof JackStandard Chimney Page Base Installation Page Alcove Installation Closet Installation ? Warning Hazard Combustion AIR Page GAS Piping Electrical Wiring AWG Contents Quantity NAT. to Propane ConversionManifold Removal and Orifice Change Page Operating Instructions Adjustment of Heat Input RateInitial Start UP GAS Pressure Chart for ALL GMD1-80 Model Furnaces Burner Adjustment Setting Temperature Rise Furnace Checkout ProcedurePage Installers Instructions to User VI. Starting the Unit Refer to the Troubleshooting Section of this Manual Page Diagnostic Features Power must be disconnected before servicingTurn Tstat Setting Above Room Temp Yes After GAS Valve OPENS, do the Burners IGNITE? Check ALL VIII. Dealer Maintenance Inducer Blower AssemblyElectrical BurnersInspecting the Venting System GASKETS/SEALING MaterialsHeat Exchanger House AIR BlowerOn START-UP IX. User Information Section Component Locations Inspection AreasFilter Location and Cleaning Appendix A. Replacement Parts List Page Appendix B Wiring Diagram