Lodge Manufacturing GMD1-80N manual Setting Temperature Rise, Furnace Checkout Procedure

Page 28

All installations and services must be performed by qualified service personnel.

Figure 9

N. SETTING TEMPERATURE RISE

The GMD1-80N is designed and wired at the factory for a heating blower speed that should result in an approximate temperature rise of 70°F. The blower motor is wired on medium low speed for heating mode. The temperature rise through the furnace may vary depending on the duct system, elevation, heating value, etc. for each installation.

After 10 to 15 minutes of continuous operation, the temperature rise through the furnace must fall within a range of 55°F to 85°F. If the outlet or supply duct temperature is too high, check to make sure the return air filter is clean, the return air registers are free from obstruction, the outlet registers are properly adjusted and clear, and the supply and return air ducts are open.

The circulating air blower is not moving enough air if the supply air temperature is still too high. Before proceeding further, turn off the power supply to the furnace and remove the blower door. The speed of the blower must be increased by changing the speed tap from the motor (see wiring diagram). This is accomplished by locating the control panel attached to the blower housing and switching blue (med. low) blower lead, which should be connected to the “Heat” terminal on the White-Rodgers 50A65-143 control, with one of the higher speed blower leads attached to a terminal marked “Park”. Be sure to attach any unused blower leads to a terminal marked “Park”. Replace the blower door and turn on the power supply.

O. FURNACE CHECKOUT PROCEDURE

Before any system of gas piping is finally put into service, it shall be carefully tested to assure that it is gas tight as indicated in section IV. H. Gas Piping of this manual.

27

Image 28
Contents GAS-FIRED Furnace Safety Section Page Page Page Table of Contents Section Beginning Page Models GMD1-80N III. Furnace Specifications Model GMD1-80Blower Data Standard Chimney IV. Installation Roof JackFurnace Location Page Base Installation Page Alcove Installation Closet Installation ? Warning Hazard Combustion AIR Page GAS Piping Electrical Wiring AWG Contents Quantity NAT. to Propane ConversionManifold Removal and Orifice Change Page Initial Start UP Adjustment of Heat Input RateOperating Instructions GAS Pressure Chart for ALL GMD1-80 Model Furnaces Burner Adjustment Setting Temperature Rise Furnace Checkout ProcedurePage Installers Instructions to User VI. Starting the Unit Refer to the Troubleshooting Section of this Manual Page Diagnostic Features Power must be disconnected before servicingTurn Tstat Setting Above Room Temp Yes After GAS Valve OPENS, do the Burners IGNITE? Check ALL VIII. Dealer Maintenance Inducer Blower AssemblyElectrical BurnersInspecting the Venting System GASKETS/SEALING MaterialsHeat Exchanger House AIR BlowerOn START-UP IX. User Information Section Component Locations Inspection AreasFilter Location and Cleaning Appendix A. Replacement Parts List Page Appendix B Wiring Diagram