Lodge Manufacturing GMD1-80N manual

Page 7

All installations and services must be performed by qualified service personnel.

II.GENERAL INSTRUCTIONS AND CLEARANCES NOTE: READ THIS SECTION BEFORE STARTING INSTALLATION

1.This furnace is equipped with orifices for operation with natural gas. For conversion to propane gas, see instructions in Gas Conversion Section of this manual.

2.Any reference to L.P. or Propane gas in this manual, any other labels, or markings on this furnace is to be construed to be propane HD-5. A commercial grade of liquefied petroleum gases composed of a minimum of 90 percent liquid propane (C8H8).

3.The selection of a furnace heating capacity for a proposed installation should be based on a heat loss calculation made according to the manuals provided by the Air Conditioning Contractors of America (ACCA) or the American Society of Heating, Refrigeration and Air Conditioning Engineers, Inc. (ASHRAE).

4.The installer shall be familiar with and comply with all codes and regulations applicable to the installation of these heating appliances and related equipment. In lieu of local codes, the installation shall be in accordance with the current provisions of one or more of the following standards.

a.Federal Manufactured Home Constructions & Safety Standard (HUD Total 24, Part 280).

b.American National Standard (ANSI-119.2/NFPA-501C), for installations of all recreational vehicles.

c.American National Standard (ANSI-Z223.1/NFPA-54), for installation of all gas- fired furnaces.

d.American National Standard Electric Code (ANSI-C1/NFPA-70), for installation of all electrical field wiring.

The gas-fired furnace has been investigated under the ANSI Z 21.47-CAN/CGA 22.3- 2001 CENTRAL FURNACE test standard. This gas fired unit is listed by Intertek Testing Services and described as, “For installation as central furnace special type for single story dwelling.”

: The area around the furnace must be kept free and clear of combustible materials, especially papers and rags.

: This furnace is not to be used as a construction heater.

6

Image 7
Contents GAS-FIRED Furnace Safety Section Page Page Page Table of Contents Section Beginning Page Models GMD1-80N GMD1-80 III. Furnace Specifications ModelBlower Data Standard Chimney IV. Installation Roof JackFurnace Location Page Base Installation Page Alcove Installation Closet Installation ? Warning Hazard Combustion AIR Page GAS Piping Electrical Wiring AWG Propane Conversion Contents Quantity NAT. toManifold Removal and Orifice Change Page Initial Start UP Adjustment of Heat Input RateOperating Instructions GAS Pressure Chart for ALL GMD1-80 Model Furnaces Burner Adjustment Furnace Checkout Procedure Setting Temperature RisePage Installers Instructions to User VI. Starting the Unit Refer to the Troubleshooting Section of this Manual Page Power must be disconnected before servicing Diagnostic FeaturesTurn Tstat Setting Above Room Temp Yes After GAS Valve OPENS, do the Burners IGNITE? Check ALL Burners VIII. Dealer MaintenanceInducer Blower Assembly ElectricalHouse AIR Blower Inspecting the Venting SystemGASKETS/SEALING Materials Heat ExchangerOn START-UP IX. User Information Section Inspection Areas Component LocationsFilter Location and Cleaning Appendix A. Replacement Parts List Page Appendix B Wiring Diagram