Allied Air Enterprises 80G1UH, A80UH Venting, Mounting Screws Location Figure UPFLOW POSITION

Page 13
Venting

Venting

A 4 inch diameter flue transition is factory installed on the combustion air inducer outlet of all models. Figure 16 shows the combustion air inducer as shipped from the factory.

Mounting Screws Location

Figure 15

UPFLOW POSITION

Top Vent Discharge

Figure 16

Mounting Screws LocationUPFLOW POSITION IMPORTANT

The unit will not vent properly with the flue transition pointed down in the 6 o’clock position.

The combustion air inducer may be rotated clockwise or counterclockwise by 90° to allow for top or side vent discharge in all applications. When the unit is installed, the flue transition must be in the 9 o’clock, 12 o’clock or 3 o’clock position.

If necessary reposition the combustion air inducer, pressure switch and/or make-up box as needed per the following steps. See Figures 16 through 22.

1.Remove the four mounting screws (Figure 15) which secure the combustion air inducer / pressure switch assembly to the orifice plate. Lift the assembly and rotate it 90° clockwise or counter clockwise to either the 3 o’clock position. Resecure with four secrews. Gasket should be left in place.

2.Use tin snips to cut preferred opening on the cabinet for repositioning the flue outlet. Use the cut-out piece as a cover plate to patch unused opening on cabinet.

UPFLOW POSITION

Left Side Vent Discharge

Remove make-up box assembly (2 screws) and cut wire tie to free make- up box wires. Re install make-up box on other side of cabinet.

Resecure make-up box wires: Either pull excess wires through the blower companrtment and secure using supplied wire tie, or coil excess wire and secure to the gas manifold.

Figure 17

UPFLOW POSITION

Right Side Vent Discharge

Pressure switch tubing may be too long. Cut to fit, then reattach to barbed fitting on pressure switch. Tubing must not be allowed to sag.

Figure 18

506526-01

Issue 1031

Page 13 of 39

Image 13
Contents INSTALLATION INSTRUCTIONS TABLE OF CONTENTSA80UH & 80G1UH Warm Air Gas FurnaceFRONT VIEW A80UH & 80G1UH Unit Dimensions - inches mmSIDE VIEW 506526-01 A80UH & 80G1UHInstalled Locations Safety InformationDANGER A80UH & 80G1UH Gas FurnaceHeating Unit Installed Upstream of Cooling Unit Installed in Combination with a Cooling CoilTemperature Rise Use of Furnace as a Construction HeaterProduct Contains Fiberglass Wool GeneralAllied Air Enterprises, Inc 215 Metropolitan Drive West Columbia, SCConfined Space Unconfined SpaceEquipment in Confined Space - All Air From Inside Figure Air from InsideEQUIPMENT IN CONFINED SPACE Upflow Application Installation Clearances Setting EquipmentUpflow Applications 1800 cfm 850 L/s must have one of the following Return Air - Upflow Applications3.Bottom return air 4.Return air from both sides 5.Bottom and one side return airRemoving the Bottom Panel Horizontal Application Installatioin clearancesRemoving the Bottom Panel Figure Horizontal ApplicationsFilters Horizontal Application Unit installed on PlatformTable Duct System Supply Air PlenumMounting Screws Location Figure UPFLOW POSITION VentingUPFLOW POSITION Figure UPFLOW POSITIONHORIZONTAL LEFT POSITION Horizontal PositionFigure HORIZONTAL LEFT POSITION HORIZONTAL RIGHT POSITIONCommon Venting Using Metal Lined Masonry Chimney Venting Using a Masonry ChimneyVent Connection Figure IssueGeneral Venting Requirements Page 17 of IssueIssue Serving a Single Category I AppliancePage 18 of 506526-01Issue Serving a Single Category I AppliancePage 19 of 506526-01Serving Two or More Category I Appliances Vent Connector CapacityCommon Vent Capacity Serving Two or More Category I AppliancesServing Two or more Category I Appliances Table Table Common Vent CapacityVent Connector Capacity Serving Two or More Category I AppliancesCARBON MONOXIDE POISONING HAZARD Removal of the Furnace from Common VentIssue Page 22 ofGas Supply Gas PipingGas Pipe Capacity - ft³/hr m³/hr IssueFigure Horizontal Applications Possible Gas Piping ConfigurationsIssue Page 24 ofLeak Check INTERIOR MAKE-UPBOX INSTALLATION FigureFigure Electrical ELECTROSTATIC DISCHARGE ESD INTERIOR MAKE-UPBOX INSTALLATION FigureGenerator Use - Voltage Requirements Accessory TerminalsThermostat Condensing Unit Thermostat DesignationsIssue Wiring Diagram FigurePage 27 of 506526-01Integrated Control Typical Field Wiring Diagram FigureAutomatic Hot Surface Ignition System Unit Start-UP FOR YOUR SAFETY READ BEFORE LIGHTING UNITPlacing the Furnace into Operation Gas Valve Operation FigureHeating Sequence Of Operation Figure Gas Pressure Adjustment Gas Flow ApproximateSupply Pressure Measurement Manifold Pressure MeasurementOther Unit Adjustments Manifold Pressure Settings and Pressure SwitchFlame Rollout Switches Pressure SwitchElectrical Thermostat Heat AnticipationBlower Speeds Electronic IgnitionELECTRICAL SHOCK, FIRE OR EXPLOSION HAZARD ServiceBlower Flue And ChimneyIssue Cleaning the Heat Exchanger and BurnersPage 34 of 506526-01NOx INSERTS Figure Remove 5 Screws If NecessaryFAILURE CODES PLANNED SERVICEIssue Page 36 ofCabinet Parts REPAIR PARTS LISTHeating Parts Control PanelIssue START-UP& PERFORMANCE CHECK LIST UNIT SET UPPage 38 of 506526-01UNIT OPERATION IssuePage 39 of 506526-01