Power On

 

Once all of the components have been installed in the RAID subsystem and the host channels

 

have been connected to the host, the subsystem can be powered on.

5.4.1

Check List

 

Before powering on the RAID subsystem, please check the following:

 

Memory module: Memory modules have been correctly installed on the controller boards.

 

BBU: Ensure that the BBU has been installed correctly.

 

Hard drives: Hard drives have been correctly installed in the drive trays.

 

Drive trays: ALL the drive trays, whether or not they have a hard drive, have been installed

 

into the subsystem.

 

Cable connections: The host ports on the subsystem have been correctly connected to a

 

host computer.

 

Power cables: The power cables have been connected to the PSU modules on the subsys-

 

tem and plugged into the main power source.

 

Ambient temperature: All the subsystem components have been acclimated to the sur-

 

 

rounding temperature.

5.4.2

Power On Procedure

 

When powering on the RAID subsystem, please follow these steps:

 

1.

Power on the subsystems that are not connected directly to the host computer, if

 

 

applied.

 

 

If you have daisy chained any RAID subsystem, power on those subsystems before power-

 

 

ing on the first subsystem that is connected to your host computer(s).

 

2.

Power on the RAID subsystem.

 

 

The first subsystem should be powered on before the host computers. To power on the

 

 

subsystem please follow the description below.

Using the power cords provided in the package, connect both power sockets on the sub- system rear panel to the main power source.

Turn the two (2) power switches on. (See Figure 5.5) Each switch controls a single PSU, therefore make sure that both switches are turned on.

Fig. 5.5 Power Sockets and Power Switches

Bosch Security System

F.01U.027.799 V2 2008.08

Image 39
Contents RAID Subsystem DVA-16K Page Table of Contents 01U.027.799 V2 Bosch Security System Bosch Security System 01U.027.799 V2 1Warning Safety PrecautionsPrecautions and Instructions ESD PrecautionsFCC Class B Radio Frequency Interference Statement 3CertificationsProduct Overview IntroductionController Module Rear Panel 2ManagementEnclosure Chassis Best PracticesFront Panel Overview Physical Dimensions4Hard Drive Numbering Rear Panel Overview6Backplane Board Subsystem Components LCD PanelDrive Trays Controller Module Interfaces RAID Controller Module6Battery Backup Unit BBU Power Supply UnitsDimm Module 11 PSU Module Cooling ModulesI2C bus LED IndicatorsAudible Alarms Subsystem MonitoringNormalized Airflow Hot-swappable ComponentsHot-swap Capabilities ComponentsHardware Installation Installation PrerequisitesIntroduction Static-free Installation Precautions and InstructionsUnpacking the Subsystem General Installation ProcedureInstallation Procedure Flowchart Step Installation Procedure Done7Drive Tray Installation Rack/Cabinet InstallationInstalling a Drive Tray Subsystem Monitoring Overview Subsystem MonitoringBrief Overview of the LEDs Status Indicating LEDsName Color Status PowerName Color Status Drive Busy Power Status3Drive Tray LEDs Controller Module LEDsLED Name Color Status Online Status 5LAN Port LEDsBBU Module LED PSU LEDsStatic Red Cooling Module LEDsColor Status Flashing Green Static GreenAudible Alarm Default Threshold ValuesFailed Devices 4Monitoring Scsi Port on the Controller Rear Panel Subsystem Connection and OperationScsi Connection Overview Scsi CablesScsi Termination Single Host Host Connection TopologyDual Server Dual HostsBosch Security System 01U.027.799 V2 Daisy Chain Procedures Daisy ChainDaisy Chain Topology Power On Power On ProcedureCheck List 4LCD Screen Power On Status Check256MB RAM, Wait… Power Off ProcedureModem Not Config Initializing… Please WaitOverview Subsystem MaintenanceAbout Subsystem Maintenance General Notes on Component ReplacementController Module Maintenance Overview Replacing Controller Module ComponentsRemoving the Controller Module 3Replacing the Controller Module LeversInstalling the Controller Module Screws Dimm Module Replacement Dimm Module Replacement ProcedureDimm Module Considerations Installing the Dimm Module Replacing a Faulty BBU Module BBU Warnings and Precautions2Procedure Installing the BBU Module Replacing a Faulty PSU Module PSU Module Overview2Replacing the PSU Module PSUHandle 15 Installing the new PSU Module Cooling Module Maintenance Cooling Module OverviewReplacing a Cooling Module Page 7Replacing a Failed Hard Drive Hard Drive Maintenance Overview20 Drive Tray Key-lock Rotation Replacing a Hard DriveInstall the new hard drive Power Requirements Appendix SpecificationsTechnical Specifications Environmental SpecificationsSafety Requirements ShockVibration Specifications Controller SpecificationsPower Supply Specifications Drive Tray SpecificationsRAID Management Cooling Module SpecificationsFault Tolerance Management Model Name Description Appendix Spare Parts and AccessoriesAccessories Spare PartsAppendix Pin Outs Vhdci Scsi Port Pin OutsPin Name 2DB9 Audio Jack Pin Outs CN1 Pin Number Pin NameCN2 Pin Number Pin Name DB9 Audio Jack UPS Cable Pin Outs Null ModemUse this cable to connect the COM2 serial port to UPS Main Power Ethernet Port Pin OutsPin Pin Name 10Index En Index RAID Subsystem DVA-16K Installation Manual Page Bosch Security System

DVA-16K specifications

The Bosch Appliances DVA-16K is an exceptional range hood designed to enhance the cooking experience while providing effective ventilation in the kitchen. Known for its sleek and modern design, the DVA-16K integrates seamlessly with various kitchen decors while offering top-tier functionality.

One of its main features is the powerful 600 CFM blower that efficiently removes smoke, steam, and odors from the kitchen. This makes it an excellent choice for avid cooks who need a dependable ventilation solution during heavy-duty cooking sessions. The two-speed fan control allows users to easily adjust the ventilation power according to their cooking needs, ensuring optimal air quality without being overly loud.

The DVA-16K is also equipped with advanced ducted and ductless installation options, giving users flexibility based on their kitchen layout. The ducted installation ensures efficient venting to the outside, while the ductless option involves a recirculating system with charcoal filters to keep the air fresh. This versatility accommodates various kitchen designs and personal preferences.

The appliance features a stainless steel construction that not only adds a contemporary aesthetic but also ensures durability and easy maintenance. The surface is designed to resist fingerprints and smudges, making it easier to keep clean.

Another noteworthy characteristic of the Bosch DVA-16K is its integrated lighting system. The range hood comes with halogen lights that illuminate the cooking area effectively. This feature not only enhances visibility while cooking but also adds a touch of elegance to the kitchen environment.

In terms of noise levels, the Bosch DVA-16K operates quietly, which is a significant advantage when engaging in conversations or enjoying a peaceful cooking experience. Users can appreciate the balance of powerful airflow and reduced noise, making it a practical choice for modern kitchens.