Bosch Appliances DVA-16K installation manual PSUHandle

Page 51

RAID Subsystem DVA-16K Installation ManualSubsystem Maintenance en 51

Power Socket

 

Power Socket

Power Switch

 

 

 

Power Switch

Fig. 6.11 Power Sockets and Power Switches

3.Remove the PSU retention screw at the top right-hand side of the PSU. (See Figure 6.12)

Fig. 6.12 Removing the PSU Retention Screw

4.Remove the PSU module by pressing down the PSU handle found on the top of the PSU. (See Figure 6.13) This will dislodge the PSU module from the subsystem.

PSUHandle

Fig. 6.13 Pressing Down the PSU Handle

5.After the PSU module has been dislodged from the enclosure, use the handle to gently pull the PSU module out of the enclosure. (See Figure 6.14)

Fig. 6.14 Dislodging the PSU

6.Remove the cooling module from the lower level of the PSU module. Please refer to Section 6.6 Cooling Module Maintenance.

CAUTION!

When a PSU is pulled out of the chassis, the cooling module beneath the PSU is removed from the chassis at the same time.

It is recommended that the replacement procedure is completed in less than five (5) min- utes to prevent the subsystem from overheating.

Bosch Security System

F.01U.027.799 V2 2008.08

Image 51 Contents
RAID Subsystem DVA-16K Page Table of Contents 01U.027.799 V2 Bosch Security System Bosch Security System 01U.027.799 V2 1Warning Safety PrecautionsPrecautions and Instructions ESD PrecautionsFCC Class B Radio Frequency Interference Statement 3CertificationsProduct Overview IntroductionController Module Rear Panel 2ManagementEnclosure Chassis Best PracticesFront Panel Overview Physical Dimensions4Hard Drive Numbering Rear Panel Overview6Backplane Board Subsystem Components LCD PanelDrive Trays Controller Module Interfaces RAID Controller Module6Battery Backup Unit BBU Power Supply UnitsDimm Module 11 PSU Module Cooling ModulesI2C bus LED IndicatorsAudible Alarms Subsystem MonitoringNormalized Airflow Hot-swappable ComponentsHot-swap Capabilities ComponentsHardware Installation Installation PrerequisitesIntroduction Static-free Installation Precautions and InstructionsUnpacking the Subsystem General Installation ProcedureInstallation Procedure Flowchart Step Installation Procedure Done7Drive Tray Installation Rack/Cabinet InstallationInstalling a Drive Tray Subsystem Monitoring Overview Subsystem MonitoringBrief Overview of the LEDs Status Indicating LEDsName Color Status PowerName Color Status Drive Busy Power Status3Drive Tray LEDs Controller Module LEDsLED Name Color Status Online Status 5LAN Port LEDsBBU Module LED PSU LEDsStatic Red Cooling Module LEDsColor Status Flashing Green Static GreenAudible Alarm Default Threshold ValuesFailed Devices 4Monitoring Scsi Port on the Controller Rear Panel Subsystem Connection and OperationScsi Connection Overview Scsi CablesScsi Termination Single Host Host Connection TopologyDual Server Dual HostsBosch Security System 01U.027.799 V2 Daisy Chain Procedures Daisy ChainDaisy Chain Topology Power On Power On ProcedureCheck List 4LCD Screen Power On Status Check256MB RAM, Wait… Power Off ProcedureModem Not Config Initializing… Please WaitOverview Subsystem MaintenanceAbout Subsystem Maintenance General Notes on Component ReplacementController Module Maintenance Overview Replacing Controller Module ComponentsRemoving the Controller Module 3Replacing the Controller Module LeversInstalling the Controller Module Screws Dimm Module Replacement Dimm Module Replacement ProcedureDimm Module Considerations Installing the Dimm Module Replacing a Faulty BBU Module BBU Warnings and Precautions2Procedure Installing the BBU Module Replacing a Faulty PSU Module PSU Module Overview2Replacing the PSU Module PSUHandle 15 Installing the new PSU Module Cooling Module Maintenance Cooling Module OverviewReplacing a Cooling Module Page 7Replacing a Failed Hard Drive Hard Drive Maintenance Overview20 Drive Tray Key-lock Rotation Replacing a Hard DriveInstall the new hard drive Power Requirements Appendix SpecificationsTechnical Specifications Environmental SpecificationsSafety Requirements ShockVibration Specifications Controller SpecificationsPower Supply Specifications Drive Tray SpecificationsRAID Management Cooling Module SpecificationsFault Tolerance Management Model Name Description Appendix Spare Parts and AccessoriesAccessories Spare PartsAppendix Pin Outs Vhdci Scsi Port Pin OutsPin Name 2DB9 Audio Jack Pin Outs CN1 Pin Number Pin NameCN2 Pin Number Pin Name DB9 Audio Jack UPS Cable Pin Outs Null ModemUse this cable to connect the COM2 serial port to UPS Main Power Ethernet Port Pin OutsPin Pin Name 10Index En Index RAID Subsystem DVA-16K Installation Manual Page Bosch Security System