RAID Subsystem | Subsystem Connection and Operation en 41 |
|
|
The LCD screen startup sequence is shown and described in the sequence below:
Initializing….
Please Wait...
This screen appears when the PSUs are turned on.
DVA-16K
Modem Not Config
This screen appears after the initialization process. It clearly shows the model name.
256MB RAM, Wait…
Verifying installed cache memory.
No Host LUN
System is ready. You can now start to configure the subsystem.
5.5 | Power Off Procedure |
i
If you wish to power down the RAID subsystem, please follow these steps:
NOTICE!
If you wish to power down the RAID subsystem, please ensure that no
1.Stop I/O access to the system.
Use the software provided on the host computer to stop all IO accesses to the RAID sub- system. Please refer to the user’s manual that came with your host computer.
2.Flush the cache.
Use the “Shutdown Controller” function to flush all cached data. This prepares the RAID subsystem to be powered down.
3.Turn off the power.
Turn off the power switches at the top of the rear panel. Once the subsystem has been powered down, other devices that are connected to the subsystem may be powered down.
Bosch Security System | F.01U.027.799 V2 2008.08 |