Heat & Glo LifeStyle SLR32 D. Install Attic Insulation Shield, Flat Ceiling Installation

Page 36
D. Install Attic Insulation Shield

D. Install Attic Insulation Shield

WARNING! Fire Risk. DO NOT allow loose materials or insulation to touch vent. Hearth & Home Technologies Inc. requires the use of an attic shield.

The National Fuel Gas Code ANSI Z223.1 and NFPA 54 requires an attic shield constructed of 26 gauge minimum metal that extends at least 2 in. (51 mm) above insulation.

Attic shields must meet specified clearance and be se- cured in place.

Flat Ceiling Installation

• Remove one shield from box.

NOTICE: Cut previously installed batt insulation to make room for the attic insulation shield.

BEND ALL TABS INWARD 90° TO MAINTAIN CLEARANCE AND PREVENT INSULATION FROM FALLING INSIDE

INSERT 3

SCREWS

BEND 3 TABS

OUTWARD TO FASTEN TO CEILING FIRESTOP-BEND REMAINING TABS INWARD 90 DEGREES TO MAINTAIN CLEARANCE

Wrap shield around pipe if pipe is already installed in area to be insulated.

Match the three holes in each side and fasten with three screws to form a tube.

Bend three tabs on the bottom of the shield outward to allow attachment to the ceiling firestop.

Bend the remaining bottom tabs inward 90° to maintain the air space between the pipe and the shield. Set the shield on the ceiling firestop and attach to the firestop.

Bend all tabs inward 90° around the top of the shield. These tabs must be used to prevent blown insulation from getting between the shield and vent pipe, and to maintain air space clearance.

Vaulted Ceiling Installation

• Remove one shield from box.

NOTICE: Cut previously installed batt insulation to make room for the attic insulation shield.

Cut the attic insulation shield (if application is for vaulted ceiling) to fit your ceiling pitch. Snip cut edge to recreate 1 in. bend tabs all the way around the bottom.

Wrap shield around pipe if pipe is already installed in area to be insulated.

Match the three holes in each side and fasten with three screws to form a tube.

Bend three tabs on the bottom of the shield outward to allow attachment to the ceiling firestop.

Bend the remaining bottom tabs inward 90° to maintain the air space between the pipe and the shield. Set the shield on the ceiling firestop and attach to the firestop.

Bend all tabs inward 90° around the top of the shield. These tabs must be used to prevent blown insulation from getting between the shield and vent pipe, and to maintain air space clearance.

Figure 8.5 Attic Insulation Shield

36

Heat & Glo • SLR32 • 2269-900 Rev. E • 4/12

Image 36
Contents NOTICE Model SLR32•What to do if you smell gas Owner’s ManualA. Congratulations Homeowner Reference InformationTable of Contents Safety Alert KeyInstaller Guide 3 Maintenance and Service14 Appliance Setup 15 Troubleshooting = Contains updated information 13 FinishingB. Limited Lifetime Warranty LIMITED LIFETIME WARRANTYWARRANTY COVERAGE WARRANTY PERIODB. Limited Lifetime Warranty continued WARRANTY CONDITIONSWARRANTY EXCLUSIONS This warranty is void ifD. High Altitude Installations 1 Listing and Code ApprovalsA. Appliance Certification B. Tempered Glass SpecificationsInstallation of Carbon Monoxide Detectors A. Gas Fireplace Safety 2 Operating Instructions User GuideB. Your Fireplace WARNING! Choking Hazard! Keep glass rock mediaE. Fixed Glass Assembly C. Clear SpaceD. Decorative Doors and Fronts G. Before Lighting FireplaceH. Lighting Instructions IPI Final inspection byFOR YOUR SAFETY READ BEFORE LIGHTING LIGHTING INSTRUCTIONS IPIJ. Frequently Asked Questions I. After Fireplace is LitInitial Break-inProcedure •Some people may be sensitive to smoke and odors3 Maintenance and Service A. Maintenance Tasks-HomeownerGlass Cleaning Remote ControlB.Maintenance Tasks-QualifiedService Technician Gasket Seal and Glass Assembly InspectionVenting FireboxGetting Started A. Typical Appliance SystemInstaller Guide WALL SWITCHB. Design and Installation Considerations C. Tools and Supplies NeededD. Inspect Appliance and Components 5 Framing and Clearances A. Selecting Appliance LocationB. Constructing the Appliance Chase Heat & Glo • SLR32 • 2269-900Rev. E • 4/12C. Clearances MINIMUM FRAMING DIMENSIONSD. Mantel and Wall Projections Combustible MantelsNon-combustibleMantels Front Side Finishing DetailFigure 5.8 Non-CombustibleZone 5 INWALL SHEATHING6 Termination Locations A. Vent Termination Minimum Clearances= AREA WHERE TERMINAL IS NOT PERMITTED Covered Alcove ApplicationsV= VENT TERMINAL X = AIR SUPPLY INLET 7 Vent Information and Diagrams E. Vent DiagramsA. Approved Pipe B. Vent Table KeyTop Vent - Horizontal Termination Venting with 1 elbow1. Top Vent - Horizontal Termination - continued Venting with 2 elbowsINSTALLED HORIZONTALLY Top Vent - Horizontal Termination1. Top Vent - Horizontal Termination - continued Top Vent - Horizontal TerminationVenting with 3 elbows H2 V2 H1Top Vent - Vertical Termination No Elbows V1 = 44 ft. Max. 13.4 mExhaust restrictor Instructions PILOT HOLESTop Vent - Vertical Termination Venting with 2 elbowsSLR32 V1 MinimumVenting with 3 elbows Top Vent - Vertical TerminationSLR32 V1 MinimumVenting with 4 elbows Top Vent - Vertical TerminationV3 H2 H1 V1 V1 MINCoaxial to Colinear Venting Prior to installing the gas applianceTable Clearances to CombustiblesTOP VENT •Vent this appliance directly outside•Use separate vent system for this appliance 8 Vent Clearances and Framing A. Pipe Clearances to CombustiblesB. Wall Penetration Framing Between ceiling firestopsC. Install the Ceiling Firestop D. Install Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation 9 Appliance Preparation A. Preparing Elbow Heat ShieldB. Securing and Leveling the Appliance WARNING! Risk of Fire! Prevent contact with•Sagging or loose insulation •Insulation backing or plastic10 Installing Vent Pipe SLP Pipe A. Assemble Vent SectionsB. Assemble Slip Sections C. Secure The Vent SectionsPilot hole E. Install Decorative Ceiling Components D. Disassemble Vent SectionsF. Install Metal Roof Flashing G. Assemble and Install Storm CollarCAULK H. Install Vertical Termination Cap I. Install Decorative Wall ComponentsFigure Figure 10.16 Wall ThimbleK. Install Horizontal Termination Cap Figure 10.17 Venting through the wall11 Gas Information A. Fuel ConversionB. Gas Pressure Access Through the Valve AssemblyC. Gas Connection D. High Altitude InstallationsValve Pressure Taps •Ensure adequate ventilationA. Wiring Requirements B. IntelliFire Ignition System WiringC. Optional Accessories Requirements 12 Electrical InformationD. Electrical Service and Repair E. Junction Box Installation13 Finishing A. Framing and Finishing InstructionsSetting the Fireplace into the Framing Finishing InstructionsFigure 13.3 Finishing Details Heat & Glo • SLR32 • 2269-900Rev. E • 4/12Painting Wallboard Joint-CrackPrevention and RepairFinish and Sealing Joints Finishing Around Opening with Gypsum WallboardB. Mantel and Wall Projections Combustible Mantel Legs Or Wall ProjectionsExtending Past The Face Of The Fireplace Failure to comply could cause fireC. Facing Material Non-CombustibleFinish Materials0 - 1 inch thickness-OverlapFit Method Non-CombustibleFinish Materials 0 Inches to 4 Inches Thick-InsideFit MethodNon-CombustibleFinish Material 0-4Inches Thick 3/4 IND. Decorative Fronts Table 1. Dimensions of Tonic Decorative FrontTable 1. Dimensions of Martini Decorative Front Figure 13.14 Dimensions of Tonic Decorative Front14 Appliance Setup A. Remove Fixed Glass AssemblyC. Clean the Appliance D. Accessories• MEDIA-AMBER • MEDIA-BLACK • MEDIA-CLEAR • MEDIA-COBALT • MEDIA-BK2-GEMS • MEDIA-WH2-GEMS• MEDIA-STONES-2 • SLR32-LOGS • MEDIA-CL2-GEMS • GLASS32-LINERF. Fixed Glass Assembly G. Install the MeshH. Air Shutter Setting Removing Fixed Glass Assembly15 Troubleshooting A. IntelliFire Ignition SystemSymptom Possible CauseIntelliFire Ignition System - continued SymptomPossible Cause Corrective ActionA. Appliance Dimension Diagram 16 Reference MaterialsN R Q S P M K L J I Ø A B E F C DB. Vent Components Diagrams 9 in12-1/2in 2-3/4inB. Vent Components Diagrams continued Effective Height LengthSLP-45- 45 Elbow SLP90- 90 ElbowB. Vent Components Diagrams continued SLK-SNKDSLP-CCS-BK SLP-TVHWSLP-HRC-SS SLP-HRC-ZC-SS HORIZONTAL TERMINATION CAPCOAXIAL to COLINEAR VENTING B. Vent Components Diagrams continuedOptional Wire Harness DESCRIPTIONC. Service Parts at depotSLR32 StockedSLR32 at DepotC. Service Parts #11 Valve AssemblySLR32 StockedC. Service Parts at DepotD. Contact Information NOTICE