B. Assemble Slip Sections

B. Assemble Slip Sections

Slide the inner flue of the slip section into the inner flue of the pipe section and the outer flue of the slip section over the outer flue of the pipe section. See Figure 10.3.

Slide together to the desired length.

Pilot hole

Figure 10.3 Slip Section Pilot Holes

Maintain a 1-1/2 in. (38 mm) overlap between the slip section and the pipe section.

Secure the pipe and slip section with two screws no longer than 1/2 in. (13 mm), using the pilot holes in the slip section. See Figure 10.4.

Figure 10.4 Screws into Slip Section

Continue adding pipe as necessary following instructions in “Assembling Pipe Sections.”

NOTICE: If slip section is too long, the inner and outer flues of the slip section can be cut to the desired length.

NOTICE: When installing a vent system with an HRC termination cap, all pipe system joints shall be sealed using a silicone sealant with a minimum of 300ºF continuous exposure rating.

Apply a bead of silicone sealant inside the female outer pipe joint prior to joining sections.

Only outer pipes are sealed, sealing the inner flue is not required.

All unit collar, pipe, slip section, elbow and cap outer flues shall be sealed.

C. Secure The Vent Sections

Vertical runs of pipe must be supported every 8 ft. (2.44 m).

Horizontal sections must be supported every 5 feet (1.52 m).

Vent supports or plumbers strap (spaced 120º apart) may be used to support. See figures 10.5 and 10.6.

Wall shield firestops may be used to provide horizontal support.

Ceiling firestops have tabs that may be used to provide vertical support.

WARNING! Risk of Fire, Explosion or Asphyxiation! Improper support may allow vent to sag and separate. Use vent run supports and connect vent sections per in- stallation instructions. DO NOT allow vent to sag below connection point to appliance.

Figure 10.5 Securing Vertical Pipe Sections

Figure 10.6 Securing Horizontal Pipe Sections

40

Heat & Glo • SLR32 • 2269-900 Rev. E • 4/12

Image 40
Contents NOTICE Model SLR32•What to do if you smell gas Owner’s ManualA. Congratulations Homeowner Reference InformationTable of Contents Safety Alert KeyInstaller Guide 3 Maintenance and Service14 Appliance Setup 15 Troubleshooting = Contains updated information 13 FinishingB. Limited Lifetime Warranty LIMITED LIFETIME WARRANTYWARRANTY COVERAGE WARRANTY PERIODB. Limited Lifetime Warranty continued WARRANTY CONDITIONSWARRANTY EXCLUSIONS This warranty is void ifD. High Altitude Installations 1 Listing and Code ApprovalsA. Appliance Certification B. Tempered Glass SpecificationsInstallation of Carbon Monoxide Detectors A. Gas Fireplace Safety 2 Operating Instructions User GuideB. Your Fireplace WARNING! Choking Hazard! Keep glass rock mediaE. Fixed Glass Assembly C. Clear SpaceD. Decorative Doors and Fronts G. Before Lighting FireplaceH. Lighting Instructions IPI Final inspection byFOR YOUR SAFETY READ BEFORE LIGHTING LIGHTING INSTRUCTIONS IPIJ. Frequently Asked Questions I. After Fireplace is LitInitial Break-inProcedure •Some people may be sensitive to smoke and odors3 Maintenance and Service A. Maintenance Tasks-HomeownerGlass Cleaning Remote ControlB.Maintenance Tasks-QualifiedService Technician Gasket Seal and Glass Assembly InspectionVenting FireboxGetting Started A. Typical Appliance SystemInstaller Guide WALL SWITCHC. Tools and Supplies Needed B. Design and Installation ConsiderationsD. Inspect Appliance and Components 5 Framing and Clearances A. Selecting Appliance LocationB. Constructing the Appliance Chase Heat & Glo • SLR32 • 2269-900Rev. E • 4/12C. Clearances MINIMUM FRAMING DIMENSIONSD. Mantel and Wall Projections Combustible MantelsNon-combustibleMantels Front Side Finishing DetailFigure 5.8 Non-CombustibleZone 5 INWALL SHEATHING6 Termination Locations A. Vent Termination Minimum ClearancesCovered Alcove Applications = AREA WHERE TERMINAL IS NOT PERMITTEDV= VENT TERMINAL X = AIR SUPPLY INLET 7 Vent Information and Diagrams E. Vent DiagramsA. Approved Pipe B. Vent Table KeyTop Vent - Horizontal Termination Venting with 1 elbow1. Top Vent - Horizontal Termination - continued Venting with 2 elbowsINSTALLED HORIZONTALLY Top Vent - Horizontal Termination1. Top Vent - Horizontal Termination - continued Top Vent - Horizontal TerminationVenting with 3 elbows H2 V2 H1Top Vent - Vertical Termination No Elbows V1 = 44 ft. Max. 13.4 mExhaust restrictor Instructions PILOT HOLESTop Vent - Vertical Termination Venting with 2 elbowsSLR32 V1 MinimumVenting with 3 elbows Top Vent - Vertical TerminationSLR32 V1 MinimumVenting with 4 elbows Top Vent - Vertical TerminationV3 H2 H1 V1 V1 MINCoaxial to Colinear Venting Prior to installing the gas applianceTable Clearances to Combustibles•Vent this appliance directly outside TOP VENT•Use separate vent system for this appliance 8 Vent Clearances and Framing A. Pipe Clearances to CombustiblesB. Wall Penetration Framing Between ceiling firestopsC. Install the Ceiling Firestop Flat Ceiling Installation D. Install Attic Insulation ShieldVaulted Ceiling Installation 9 Appliance Preparation A. Preparing Elbow Heat ShieldB. Securing and Leveling the Appliance WARNING! Risk of Fire! Prevent contact with•Sagging or loose insulation •Insulation backing or plastic10 Installing Vent Pipe SLP Pipe A. Assemble Vent SectionsC. Secure The Vent Sections B. Assemble Slip SectionsPilot hole E. Install Decorative Ceiling Components D. Disassemble Vent SectionsG. Assemble and Install Storm Collar F. Install Metal Roof FlashingCAULK H. Install Vertical Termination Cap I. Install Decorative Wall ComponentsFigure Figure 10.16 Wall ThimbleK. Install Horizontal Termination Cap Figure 10.17 Venting through the wall11 Gas Information A. Fuel ConversionB. Gas Pressure Access Through the Valve AssemblyC. Gas Connection D. High Altitude InstallationsValve Pressure Taps •Ensure adequate ventilationA. Wiring Requirements B. IntelliFire Ignition System WiringC. Optional Accessories Requirements 12 Electrical InformationD. Electrical Service and Repair E. Junction Box Installation13 Finishing A. Framing and Finishing InstructionsSetting the Fireplace into the Framing Finishing InstructionsFigure 13.3 Finishing Details Heat & Glo • SLR32 • 2269-900Rev. E • 4/12Painting Wallboard Joint-CrackPrevention and RepairFinish and Sealing Joints Finishing Around Opening with Gypsum WallboardB. Mantel and Wall Projections Combustible Mantel Legs Or Wall ProjectionsExtending Past The Face Of The Fireplace Failure to comply could cause fireNon-CombustibleFinish Materials C. Facing Material0 - 1 inch thickness-OverlapFit Method Non-CombustibleFinish Materials 0 Inches to 4 Inches Thick-InsideFit MethodNon-CombustibleFinish Material 0-4Inches Thick 3/4 IND. Decorative Fronts Table 1. Dimensions of Tonic Decorative FrontTable 1. Dimensions of Martini Decorative Front Figure 13.14 Dimensions of Tonic Decorative Front14 Appliance Setup A. Remove Fixed Glass AssemblyC. Clean the Appliance D. Accessories• MEDIA-AMBER • MEDIA-BLACK • MEDIA-CLEAR • MEDIA-COBALT • MEDIA-BK2-GEMS • MEDIA-WH2-GEMS• MEDIA-STONES-2 • SLR32-LOGS • MEDIA-CL2-GEMS • GLASS32-LINERF. Fixed Glass Assembly G. Install the MeshH. Air Shutter Setting Removing Fixed Glass Assembly15 Troubleshooting A. IntelliFire Ignition SystemSymptom Possible CauseIntelliFire Ignition System - continued SymptomPossible Cause Corrective ActionA. Appliance Dimension Diagram 16 Reference MaterialsN R Q S P M K L J I Ø A B E F C DB. Vent Components Diagrams 9 in12-1/2in 2-3/4inB. Vent Components Diagrams continued Effective Height LengthSLP-45- 45 Elbow SLP90- 90 ElbowB. Vent Components Diagrams continued SLK-SNKDSLP-CCS-BK SLP-TVHWSLP-HRC-SS SLP-HRC-ZC-SS HORIZONTAL TERMINATION CAPCOAXIAL to COLINEAR VENTING B. Vent Components Diagrams continuedOptional Wire Harness DESCRIPTIONC. Service Parts at depotSLR32 StockedSLR32 at DepotC. Service Parts #11 Valve AssemblySLR32 StockedC. Service Parts at DepotD. Contact Information NOTICE