F. Fixed Glass Assembly

F. Fixed Glass Assembly

WARNING! Risk of Asphyxiation! Handle fixed glass assembly with care. Inspect the gasket to ensure it is undamaged and inspect the glass for cracks, chips or scratches.

DO NOT strike, slam or scratch glass.

DO NOT operate fireplace with glass removed, cracked, broken or scratched.

Replace as a complete assembly.

Removing Fixed Glass Assembly

1.Remove the decorative front.

2.Locate the two spring latches that are on the upper left and right of the fireplace.

3.Use both index fingers to release spring latches. See Figure 14.4.

4.Allow glass to tilt forward. Grasp glass on the upper right and left sides and lift glass “up” and “out.”

Replacing Fixed Glass Assembly

1.Locate glide tabs on lower left and right corners.

2.Grasp glass on upper right and left sides and tilt bot- tom of glass assembly toward fireplace.

3.Allow of the bottom gasketing of the glass assembly to touch the face of the fireplace.

4.Put pressure on the glass as you allow the glass assembly to drop into the two lower glass clips. See Figure 14.4.

5.Tilt top of glass towards fireplace and engage both top spring latches

G. Install the Mesh

The mesh front is included with the Tonic front. The Mar- tini tinted glass front does not include mesh.

1.Remove fixed glass assembly as instructed.

2.Place glass assembly into mesh screen such that the four mesh clips attached to the mesh assembly snap into the four corresponding slots on the fixed glass as- sembly.

H. Air Shutter Setting

Air shutter settings may be adjusted by a qualified install- er at the time of installation. The air shutter is set at the factory for minimum vertical vent run. Adjust air shutter for longer vertical runs. See Figure 14.5.

Loosen the 1/4 in. screw.

Twist shutter to adjust

Shutter may be open for longer horizontal vent runs.

Do not close the air shutter more than 1/8 in. for NG or 1/4 in. for LP when glass rock media (shipped with appliance) is installed. See Table 14.1 below for settings when optional media (fiber) stones kit or optional log kit are installed. See instructions provided with kit.

Tighten the screw.

NOTICE: If the flames appear to be orange, open the air shutter to prevent residue buildup on the glass.

UPPER SPRING LATCH

LOWER GLASS CLIP

Figure 14.4 Fixed Glass Assembly

Figure 14.5 Air Shutter

Air Shutter Settings

SLR32

NG

LP

Glass Rock Media

1/8 in.

1/4 in.

Media Stones (Optional Kit)

 

 

Logs (Optional Kit)

3/16 in.

5/16 in.

Table 14.1

58

Heat & Glo • SLR32 • 2269-900 Rev. E • 4/12

Image 58
Contents •What to do if you smell gas NOTICEModel SLR32 Owner’s ManualA. Congratulations Homeowner Reference InformationInstaller Guide Table of ContentsSafety Alert Key 3 Maintenance and Service = Contains updated information 14 Appliance Setup15 Troubleshooting 13 FinishingWARRANTY COVERAGE B. Limited Lifetime WarrantyLIMITED LIFETIME WARRANTY WARRANTY PERIODWARRANTY EXCLUSIONS B. Limited Lifetime Warranty continuedWARRANTY CONDITIONS This warranty is void ifA. Appliance Certification D. High Altitude Installations1 Listing and Code Approvals B. Tempered Glass SpecificationsInstallation of Carbon Monoxide Detectors B. Your Fireplace A. Gas Fireplace Safety2 Operating Instructions User Guide WARNING! Choking Hazard! Keep glass rock mediaD. Decorative Doors and Fronts E. Fixed Glass AssemblyC. Clear Space G. Before Lighting FireplaceFOR YOUR SAFETY READ BEFORE LIGHTING H. Lighting Instructions IPIFinal inspection by LIGHTING INSTRUCTIONS IPIInitial Break-inProcedure J. Frequently Asked QuestionsI. After Fireplace is Lit •Some people may be sensitive to smoke and odorsGlass Cleaning 3 Maintenance and ServiceA. Maintenance Tasks-Homeowner Remote ControlVenting B.Maintenance Tasks-QualifiedService TechnicianGasket Seal and Glass Assembly Inspection FireboxInstaller Guide Getting StartedA. Typical Appliance System WALL SWITCHC. Tools and Supplies Needed B. Design and Installation ConsiderationsD. Inspect Appliance and Components 5 Framing and Clearances A. Selecting Appliance LocationB. Constructing the Appliance Chase Heat & Glo • SLR32 • 2269-900Rev. E • 4/12C. Clearances MINIMUM FRAMING DIMENSIONSNon-combustibleMantels D. Mantel and Wall ProjectionsCombustible Mantels Front Side Finishing DetailWALL Figure 5.8 Non-CombustibleZone5 IN SHEATHING6 Termination Locations A. Vent Termination Minimum ClearancesCovered Alcove Applications = AREA WHERE TERMINAL IS NOT PERMITTEDV= VENT TERMINAL X = AIR SUPPLY INLET A. Approved Pipe 7 Vent Information and DiagramsE. Vent Diagrams B. Vent Table KeyTop Vent - Horizontal Termination Venting with 1 elbowINSTALLED HORIZONTALLY 1. Top Vent - Horizontal Termination - continuedVenting with 2 elbows Top Vent - Horizontal TerminationVenting with 3 elbows 1. Top Vent - Horizontal Termination - continuedTop Vent - Horizontal Termination H2 V2 H1Exhaust restrictor Instructions Top Vent - Vertical Termination No ElbowsV1 = 44 ft. Max. 13.4 m PILOT HOLESSLR32 Top Vent - Vertical TerminationVenting with 2 elbows V1 MinimumSLR32 Venting with 3 elbowsTop Vent - Vertical Termination V1 MinimumV3 H2 H1 V1 Venting with 4 elbowsTop Vent - Vertical Termination V1 MINTable Coaxial to Colinear VentingPrior to installing the gas appliance Clearances to Combustibles•Vent this appliance directly outside TOP VENT•Use separate vent system for this appliance B. Wall Penetration Framing 8 Vent Clearances and FramingA. Pipe Clearances to Combustibles Between ceiling firestopsC. Install the Ceiling Firestop Flat Ceiling Installation D. Install Attic Insulation ShieldVaulted Ceiling Installation 9 Appliance Preparation A. Preparing Elbow Heat Shield•Sagging or loose insulation B. Securing and Leveling the ApplianceWARNING! Risk of Fire! Prevent contact with •Insulation backing or plastic10 Installing Vent Pipe SLP Pipe A. Assemble Vent SectionsC. Secure The Vent Sections B. Assemble Slip SectionsPilot hole E. Install Decorative Ceiling Components D. Disassemble Vent SectionsG. Assemble and Install Storm Collar F. Install Metal Roof FlashingCAULK Figure H. Install Vertical Termination CapI. Install Decorative Wall Components Figure 10.16 Wall ThimbleK. Install Horizontal Termination Cap Figure 10.17 Venting through the wallB. Gas Pressure 11 Gas InformationA. Fuel Conversion Access Through the Valve AssemblyValve Pressure Taps C. Gas ConnectionD. High Altitude Installations •Ensure adequate ventilationC. Optional Accessories Requirements A. Wiring RequirementsB. IntelliFire Ignition System Wiring 12 Electrical InformationD. Electrical Service and Repair E. Junction Box InstallationSetting the Fireplace into the Framing 13 FinishingA. Framing and Finishing Instructions Finishing InstructionsFigure 13.3 Finishing Details Heat & Glo • SLR32 • 2269-900Rev. E • 4/12Finish and Sealing Joints PaintingWallboard Joint-CrackPrevention and Repair Finishing Around Opening with Gypsum WallboardExtending Past The Face Of The Fireplace B. Mantel and Wall ProjectionsCombustible Mantel Legs Or Wall Projections Failure to comply could cause fireNon-CombustibleFinish Materials C. Facing Material0 - 1 inch thickness-OverlapFit Method Non-CombustibleFinish Material 0-4Inches Thick Non-CombustibleFinish Materials0 Inches to 4 Inches Thick-InsideFit Method 3/4 INTable 1. Dimensions of Martini Decorative Front D. Decorative FrontsTable 1. Dimensions of Tonic Decorative Front Figure 13.14 Dimensions of Tonic Decorative FrontC. Clean the Appliance 14 Appliance SetupA. Remove Fixed Glass Assembly D. Accessories• MEDIA-STONES-2 • SLR32-LOGS • MEDIA-CL2-GEMS • MEDIA-AMBER • MEDIA-BLACK • MEDIA-CLEAR• MEDIA-COBALT • MEDIA-BK2-GEMS • MEDIA-WH2-GEMS • GLASS32-LINERH. Air Shutter Setting F. Fixed Glass AssemblyG. Install the Mesh Removing Fixed Glass AssemblySymptom 15 TroubleshootingA. IntelliFire Ignition System Possible CausePossible Cause IntelliFire Ignition System - continuedSymptom Corrective ActionN R Q S P A. Appliance Dimension Diagram16 Reference Materials M K L J I Ø A B E F C D12-1/2in B. Vent Components Diagrams9 in 2-3/4inSLP-45- 45 Elbow B. Vent Components Diagrams continuedEffective Height Length SLP90- 90 ElbowSLP-CCS-BK B. Vent Components Diagrams continuedSLK-SNKD SLP-TVHWSLP-HRC-SS SLP-HRC-ZC-SS HORIZONTAL TERMINATION CAPOptional Wire Harness COAXIAL to COLINEAR VENTINGB. Vent Components Diagrams continued DESCRIPTIONSLR32 C. Service Partsat depot StockedC. Service Parts SLR32at Depot #11 Valve AssemblyC. Service Parts SLR32Stocked at DepotD. Contact Information NOTICE