Heat & Glo LifeStyle 6000TRI-SP, 6000TRI-IPI manual Vent Termination Minimum Clearances

Page 25

G R

v

D A H

 

E

 

 

 

 

 

 

 

 

v

 

 

 

 

 

 

 

L

B

 

 

 

U.S.

 

 

 

 

B

 

 

 

 

v

 

 

 

 

 

v

B

(3 FT)

 

 

 

v

 

 

 

 

 

 

 

 

 

F

v

 

v

I

M

v

 

 

 

 

 

 

 

X

 

 

 

 

 

 

 

 

 

 

 

A

 

 

 

J or K

M

N

P

Q

(See Note 2)

V

T

VS Electrical Service

D*

V

S V

 

V

= VENT TERMINAL

X = AIR SUPPLY INLET

 

 

 

= AREA WHERE TERMINAL IS NOT PERMITTED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A

=

12"

clearances above grade, veran-

 

K

=

3 ft. (U.S.A.)

 

 

 

 

 

 

 

 

(See Note 1)

da, porch, deck or balcony

 

 

 

 

6 ft. (Canada)

clearance to a mechanical

B

=

12"

clearances to window or door

 

 

 

 

 

 

 

 

air supply inlet

 

 

 

 

that may be opened, or to per-

 

L**

=

7 ft

 

clearance above paved

 

 

 

 

manently closed window.

 

 

 

 

(See Note 1)

 

sidewalk or a paved driveway

D*

=

18"

vertical clearance to unventilat-

 

 

 

 

 

 

 

 

located on public property

 

M*** =

18"

 

 

 

clearance under veranda,

 

 

 

 

ed soffit or to ventilated soffit lo-

 

 

 

 

 

 

 

 

cated above the terminal

 

 

 

 

 

 

 

 

porch, deck, balcony or over-

 

 

 

 

 

 

 

 

 

 

 

 

hang

 

 

 

*30”

for vinyl clad soffits and below

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

42”

 

vinyl

 

 

 

 

electrical service

 

 

 

 

 

 

 

 

 

 

N

=

6”

 

non-vinyl sidewalls

F

=

9"

clearance to outside corner

 

 

 

 

 

 

12”

 

vinyl sidewalls

G

=

6"

clearance to inside corner

 

 

 

 

 

 

P

=

8 ft.

 

 

 

 

 

H

=

3 ft. (Canada)

not to be installed above a gas

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

QMIN

 

RMAX

 

 

 

 

 

meter/regulator assembly within

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1 cap

 

 

3 feet

 

2 x Q ACTUAL

 

 

 

 

 

3 feet (90cm) horizontally from the

 

 

 

 

 

 

 

I

=

3 ft. (U.S.A.)

center-line of the regulator

 

 

 

2 caps

 

 

6 feet

 

1 x Q ACTUAL

 

clearance to gas service regu-

 

 

 

3 caps

 

 

9 feet

 

2/3 x Q ACTUAL

 

 

 

 

6 ft. (Canada)

 

 

 

4 caps

 

12 feet

 

1/2 x Q ACTUAL

 

 

 

 

 

lator vent outlet

 

 

 

 

 

 

J

=

9" (U.S.A.)

 

QMIN = # termination caps x 3

RMAX = (2 / # termination caps) x QACTUAL

 

 

 

 

 

 

 

12" (Canada)

clearance to non-mechanical air

S

=

6"

 

 

clearance from sides of elec-

 

 

 

 

supply inlet to building or the

 

 

 

 

(See Note 5)

 

trical service

 

 

 

 

combustion air inlet to any other

T

= 12"

 

 

clearance above electrical

 

 

 

 

appliance

 

 

 

 

 

 

 

 

 

 

(See Note 5)

 

service

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Î

**a vent shall not terminate directly above a sidewalk or paved driveway which is located between two single family dwellings and serves both dwellings.

***only permitted if veranda, porch, deck or balcony is fully open on a minimum of 2 sides beneath the floor, or meets Note 2.

NOTE 1: On private property where termination is less than 7 feet above a sidewalk, driveway, deck, porch, veranda or balcony, use of a listed cap shield is suggested.

NOTE 2: Termination in an alcove space (spaces open only on one side and with an overhang) are permitted with the dimensions specified for vinyl or non-vinyl siding and soffits. 1. There must be 3 feet minimum between termination caps. 2. All mechanical air intakes within 10 feet of a termination cap must be a minimum of 3 feet below the termination cap. 3. All gravity air intakes within 3 feet of a termination cap must be a minimum of 1 foot below the termination cap.

Figure 29. Vent Termination Minimum Clearances

NOTE 3: Local codes or regulations may require different clearances.

NOTE 4: Termination caps may be hot. Consider their proximity to doors or other traffic areas.

NOTE 5: Location of the vent termination must not interfere with access to the electrical service.

WARNING: In the U.S: Vent system termination is NOT permitted

in screened porches. You must follow side wall, overhang and

ground clearances as stated in the instructions.

In Canada: Vent system termination is NOT permitted in screened porches. Vent system termination is permitted in porch areas with two or more sides open. You must follow all side walls, overhang and ground clearances as stated in the instructions.

Heat & Glo assumes no responsibility for the improper perfor- mance of the fireplace when the venting system does not meet these requirements.

CAUTION: IF EXTERIOR WALLS ARE FINISHED WITH VINYL SIDING, IT IS SUGGESTED THAT A VINYL PROTECTOR KIT BE INSTALLED.

Heat & Glo • 6000TRI-IPI, 6000TRI-SP385-901 Rev. F • 5/05

25

Image 25
Contents What to do if you smell gas Installers GuideSafety and Warning Information Table of Contents 6000TRI-IPI, 6000TRI-SP Log set assembly6000TRI-SP, 6000TRI-IPI Service Parts List / Liste des pièces de rechange6000TRI-IPI Intermittent Pilot Ignition Valve Assembly6000TRI-SP Standing Pilot Ignition Valve AssemblyHigh Altitude Installations Installation CodesAppliance Certification CertificationIntroducing the Heat & Glo Gas Fireplaces Pre-install PreparationANY Such Action MAY Possibly Cause a Fire Hazard Diagram of the 6000TRI-IPI, 6000TRI-SP Locating the Fireplace Constructing the Fireplace ChaseClearance Requirements Framing the Fireplace Framing DimensionsDVP90ST Vent System Approvals Installing the Vent SystemTems or Components MAY be Used Identifying Vent ComponentsVertical Venting Flue Restrictor InstructionsMAX .4 M Straight Up Vertical Venting Chart Venting with One 90 Elbow Venting with ONE 1 90 ElbowVenting with Two 90 Elbows Venting with TWO 2 90 o ElbowsVenting with three 90 elbows Venting with Three 3 90 Elbows+ V 1 FT + H 1 FT Installing Vent Components Install Support Brackets To Install the Heat ShieldContinue Adding Vent Components 12 Hole and Vent Pipe Attic Firestop Vent TerminationVent Termination Minimum Clearances Proper Positioning Positioning, Leveling, Securing the FireplaceLeveling and Securing of a Fireplace Vice Must be Wired Directly to the FIRE- Place Junction BOX Installing the Optional Heat-Zone KitGas Control Systems Intermittent Pilot Ignition IPI SystemGas Pressure Requirements Gas Supply LinePressure Natural Gas Propane Intermittent Pilot Ignition IPI Wiring Diagram Wiring the Fireplace Sealant Material Hearth Extensions FinishingInstalling Trim, Logs, and Ember Material Air Shutter Setting Double-check for faulty componentsBefore Lighting the Fireplace Fireplace Maintenance After the InstallationLighting the Fireplace Important Turn OFF the GAS Before Servicing Your Fireplace